ML20101Q610

From kanterella
Revision as of 00:15, 12 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1992 for Seabrook Station, Unit 1
ML20101Q610
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/30/1992
From: Feigenbaum T, Nardone P
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-92096, NUDOCS 9207150027
Download: ML20101Q610 (5)


Text

- _ - _ - _ _ - _ _ _ _

/ ::

/

g_g (.. .

r Sea'br%x, NN O3874 h-Ot1.h pt

  • Telephone (603)474 9521 g #

, + M h Facsimile (603)474-2987

.J4 GerCJi SerVICC <OrporatlOn Ted C. Feigenbaum f27 Senior Vice President and Chief Nuclear Officer i_ <

NYN-92096

', ' J uly 10,1992 A -b U l' -lear Regulatory Commission r Wass :55 Attcatw .c o 'wt Control Desk

' React cnce: -uty Operating License No. NPF 36, Docket No. 50 443 t-

Subject:

4 ~y Operating keport ,

3D v ntlemer-y

  • ' > Wsud please find Monthly Operatine Report 92-06. This report addresses the

!x cocrating- and shutdawn experience relating to Seabrook Station Unit i for the month oi g

,' a n e. 1992 and is submitted in accordance with the requirements 01 Seabrook Station

-Techaical Specification 6.8.1.5, Very truly yours.  ;

W ~

py -

-d C. FeigeIbaum Enclosure ec: Mr. Thomas T Martin Rei;os al Administrator U _5. Nuclear Regulatory Commission

Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Imrdon E. Ediron, St. Project Manager Project Directorate I 3 Division of Reactor Projects U.S. Nuclear Pegulatory Comma; ion Washington, DC 20555 Mr. Noel Dudley .

NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874 NMbiby

-9207150027 920630-

.(DR ADOCK 05000443 s)

PDR

. . y . - -- . n -- ~ . - . . v. . . .. - . - . .

- ~

e ; 1 i

j -

j , l ' - OPERATING DATA REPORT-3 .. '

1 - 7- ' DOCKET NO.- 50-443 UNIT Seabrook 1 DATE 07/10/92 '

COMPLETED BY P.-Nardone-TELEPHONE (603) 474-9521'

-(Ext. 4074):

7 20PERATING STATOS-2 fl. _ Unit -- Name i--- Seabrook Station Unit 1

-- 2 '. Reporting P6riodi JUNE 1992

3. LLicensed Thermal' Power (HWt): 3411

-4.s Nameplate Rating (Gross'MWe): 1197

!,5g-_ Design. Electrical Ratingf(Net.MWe): 1148 6.- Maximum Dependable Capacity (Gross MWe): 1200 7.: Maximum Dependable Capacity.(Net MWe): 1150

, :8.: If: Changes: Oc7ur _in Capacity Ratings- (Items Number 3 Through 7)

Since Last Report,'Give Reasons:. Not Applicable _

-9. Power Level-Toz Wst:h' Restricted..IfAny: None

10. Reasons For' Restrictions. If Anyi_ Not Applicrble This Month Yr.-to-Date Cumulative ,

d- m

'11. HoursHIn Reporting Period! 720.0- 4367.0 50016.0

" 16732.5

' 12. : Numbe r'- Of : Hours-Reactor Mas Critical- -720.0- 4367.0

~13.;Reactt- Reserve Shutdo:in- Hcura 0. 0 - 0.0 - 953.3 E L14.~ Hours Generator on-Line' 720.0 4367.0 3'.891.0 '

115. UnitLReserve Shutdown' Hours-. 0.0- 0.0 0.0_

15?i Gross:Thermar Energy Generated (MWE) 2451366 14884813 47954673 Jg '?q/L74GrosrElec.! Energy _ Generated ~(MWH) 855860 5206304 165/7553 ~

PE cg , ,'118q Net-Electrical Energy Generated (MWH) '823344 5007261 15915636

  • 19.sUnit Service Factor 82.7

~

100.0-100.0 ce, ,-*20;iUcit-Atailability Factors

~100,0' 100'.0 82.7

--*21'. UnitJCapacity' Factor _(Using MDC Not)- 99.4 99.7 79.1

"*22. ; Unit; Capa' city 'Fa'etor (Us.ing DER ~ Net) 99.6 99'9-79.3

-*23 -; Unit; Forced Outage Rate. -0.0 0.0 _

6.0_

24.-Shutdowns Scheduled'Over Next 6 Months-(Type, Date,- and Duration of Each):

__ P' FUELING.- 09/07/92. 59 DAYS

25.LIf: Shut Down1At End Of Report-Period.. Estimated Date'Of Startul Not Applicable-

~

-, d.. <

?"i

  • NOTE: _' Cumulative' values bam;d on total hours starting 08/19/90, date Regular Full PowerE0peration began.

E .

.; 1 of 4

) '

- i e- l - n -- a , n,- vr- . vw, y

,, .,e .~ , . . . . - - - - -. - . - . . . . - ~ . . - ~ . - . >_.- -

'4 x, J

r  :.

^; j ,?

y. 3 .

AVERAGE DAILY UNIT-POWER LEVEL 4 .w 4.

DOCKET NO, 50-443' 4

'~

. UNIT Seabrook 1 :l

';+_ . DATE 07/'0/92

+ COMPLETED BY P. Nardone -j TELEPHONE (603)-474-9521 i i

(Ext. 4074) i l MONTfi ' JUNE. 1992

.L DAY-- -AVERAGE, DAILY POWER LEVEL DA" -AVERAGE DAILY POWER LEVEL

.: _ - -1(MWe-Net)z .

(- -Net) l 2

-l

.i 1!. '1147 p 16 1147 21 -1147 _

17 1147:

13_ .. .. .1147 18 1147

-l 4' ' 1148:' 19- 1148 L5j 1145 20 1148 4I

~6'-- 1144- 21 1148 it ' ' 1} y -

                                                                            --1145'                                            22                                          1147 m  i
                                                                                         ~

i- 8 1146 .23 1147 , _ =i96 '1146~ 24 1146 $iii .

                                          ,10 -                             -1142'                    .-                       25                                          1146-                                 4
                                  - : 11 =
                                                                             '1134                      ._

26 - 1145 a I, 12( 1145 -2 7 - 1091' 3

13 : '1146 28 -, 1146
1A- _ -1147- .29 1146
                                    -- 15 '                                  '11A7                                             30                                          1146 M4
                                -       N STRUCTIONS
                     ..y b- . , -~ S.                                    . - ..            .                   .                                                                                   .                .                      ,

Tonlthis format.: list the average daily unit power level in MWe-Net for each day in g- lthe reporting. month. Campute to the nearest whole megawatt.

o

[. 2 of 4 p- -

  -r                                                                                                       -

w t- .e.u_.., y+ <.y m-wCmy- 4 w f_-e

                                                                                                                                   ^~
                                                                                          ~
                                                                                                                                               .                                L                    W$*      .. yj-7y
                                                                                                                                                                                  ~      ,                   . ,

i 3- .;,. . UNIT' SHUTDOWNS.AND POWER" REDUCTIONS' < , i DOCKET NO. 50-443 I '-

UNIT Seabrook 1- -j
DATE 07/10/92
                                                                               " REPORT' MONTH                  ' JUNE. 1992~                          ! :         ~ COMPLETED *BY, P. Nardone                        '*
                                                                                                                                                                         -TELEPHONE-(603) 474-9521?-
(Ext. 4074);

No. - Date Type' l Duration; ; Rea' son? -lMethodLof)  :-Licensee , Cause T Corrective'-

                                                           .(Hours)'                             .' Shutting 2                   Event'                                   . Action t o ..,.

< 'Down Reactor 3 Report J' PreventLRecurrence. Page;l.of'1f i i-- e F

                                                                                                                                                                                                                         ')

i

l.
                                                                                                .NO ENTRIES FOR THIS MONTH 3

1 , 1 2 3 F: Forced Reason: Methon: S: -Scheduled A-Equipment Failure (Explain) 1-Manual } ~ B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction: 4-Continued-from E-Operator Training'& License Examination previous month i F-Administrative 5-Power Reduction . G-Operational Error!(Explain) (Duration = 0) '}' H-Other'(Explain) 9-Other (Explain) 4 3 of 4 t i i

 ?
                                                                                                                                                                                                                        -t
                 ._                          n.,                    -                                                -     ,           , ,         -                   -          .                .           . . - -

DOCKET NO. 50-443

                                                                   -                                                                                                  UNIT Seatrod 1 DATE                        07/10/92      _

COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074) REFUELING INFORMATION REQUELT

1. Name of facility: Seabrook Unit 1
                                                                              ?. G '.eduled date for next refueling shutdown:                          09/07/92
3. Scheduled date for restart following refueting: 11/04/92
4. Will refueling or resumption of ope:ation thereafter require a technical specification change or other license amendment?

Yes, Reactor Coolant System Harrow Range RTD Bypass Elimination

5. Scheduled date(s) for submitting licensing action and supporting information:

March 15, 1992

3. Important licensing considerations associated with refueling, e.g., new or ,

~ different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operacing procedures: Next refueling will be the initial start of the eighteen-mont! fuel cycle schedule.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 193 (b) 60

8. The present licensed spent fuel pool storage capacity and the si7e of any _

increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: Present licensed capaci yi 1236 No increase in storage capacity requested or plai.ned. .

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with fu'.. core offload capability. The current licensed capacity is adequate until at least the year 2010. 4 of 4

   - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _                                          _   _    ._                         _ _ _ _ _ _ _ _ _ _ _ -            ______   .-}}