Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs
ML20095E712
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/11/1995
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20095E683 List:
References
NUDOCS 9512180099
Download: ML20095E712 (5)


Text

- - - . . _ . - . .. .. . .- .- . . . . . _ - - . . . . . . - . .- -

i t

Exhibit B Monticello Nuclear Generating Plant License Amendment Reauest dated December 11.1995  ;

Proposed Changes Marked Up on Existing Technical Specification Pages Exhibit B consists of the existing Technical Specification pages with the proposed changes marked up on those pages. Existing pages affected by this change are listed below-ERRt 171 i

f 1

l 9512190099 951211 PDR ADOCK 05000263 P. .,,

PDR l

3.0 LIttITING CONDITIONS FOR OPERATION 4.0 SURVE1LLANCE REQUIREMENTS

d. At least once per week the main steam-line power-operated isolation valves shall be exercised by partial closure and subsequent reopening.
2. In the event any Primary Containment automatic 2. Whenever a Primary Containment automatic isolation valve becomes inoperable, reactor isolation valve is inoperable, the position of operation in the run mode may continue at least one fully closed valve in each line provided at least one valve in each line having an inoperable valve shall be recorded having an inoperable valve is closed. daily.
3. I f Specification 3.7.D.1 and 3.7.D.2 cannot 3. Deleted be met, initiate normal orderly shutdown and have reactor in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ~

j

4. Ti e s at s .ls of he dry ell a supp essi I

tamier 18 inch p rge a vent alves shal be ep1 ced t leas once very f ve y rs.

Ode _te.d.

3.7/4.7 171 REV

1 Exhibit C Monticello Nuclear Generating Plant ,

License Amendment Reauest dated December 11.1995 i Revised Technical Specification Pages Exhibit C consists of the Technical Specification pages with the proposed changes incorporated. Existing pages affected by this change are listed below-M 171

. .=.

. i 3.0 LIMITING CONDITIONS FOR OPERATION 4.0 SURVEILIANCE REQUIREMENTS

d. At least once per week the main
  • steam-line power-operated isolation valves shall be exercised by partial closure and subsequent reopening.  !
2. In the event any Primary Containment-automatic 2. Whenever a Primary Contairement automatic isolation valve becomes inoperable, reactor isolation valve is inoperable, the operation in the run mode may continue position of at lecst one fully closed provided at least one valve in each line valve in each line having an inoperable ,

having an inoperable valve is closed, valve shall be recorded daily.  !

3. If Specification 3.7.D.1 and 3.7.D.2 cannot 3. Deleted i be met, initiate normal orderly shutdown  !

and have reactor in the cold shutdown f condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4. Deleted l I

i i

q r

?

3.7/4.7 171  ;

REV t

_ _ - . _ _ _ __ ._______ _ _____ - - . _ _ - _ - _ _ _ _ _ _ . _ _ _ - _ - _ - - _ . - - _ _ - - _ . _ - - - _ - _ _ _ _ _ _ - - _ _ - - - - . _ = - _ _ _ _ - - _-_ __---..._ . _

~

l Exhibit D .

l Measured Leak =ca of Monbcello Pnmary Contamment Purge and Vent Valves (leakage in SCFH)' I AO-2377 AO-2378 AO-2381 AO-2383 AO-2386 AO-2387 AO-2896  :

AO-2379 CV-2384 CV-2385 AO-7425B AO-2380 - AO-7424B

AO-7424A AS AS AS AS AS AS AS AS AS AS AS AS AS AS j 2

FND' LEFT* FND LEFT* FND LEFT* FND LEFT* FND LEFT* FND* LEFT* FND* LEFT* i 1986 Otdaga 1.91 0.76* 3.94 3.94* O 3.18* 7.41 1.81* 3.87 2.40* 1.7 1.32* 3.45 1.72*  !

1987 Outage 0 10.24 6.36 1.81 4.64 4.39 4.83  ;

1989 Outage 0 4.20 3.98 3.24 3.09 2.63 6.25 -!

1991 Outage 2.03 0.51* 3.15 3.94* 2.79 4.78* 1.82 2.72* 4.25 16.63* 4.39 2.20* 3.47 1.39'  ;

2 1993 Outage 1.02 3.15 7.43 3.33 2.42' 12.87 3.07 4.51 1.74* l 1994 Outaea 0.27 1.48 1.86* 5.00 2.05 2.71* 8.12 7.90 2.41 0.11*

i

Note 1: Pnmary Contamment Purge and Vent 18-inch valves are identified in bold text. Due to toshng configurabons, several of the valves, wtuch are subrect of the requested licensing amendment, are tested in conjunchon with addibonal valves. Maximum allowed leakage for these test configurabons is 17.2 SCFH at a test pressure of 42 psig.

Note 2: As Found leakage test results.

'I As Left Leakage test results: after performance of correchve mantenance, preventative mamtenance, or after related actmbes that I Note 3:

could have an adverse impact on leakage performance. Lack of test data indicates no such actmties occumed for Pnmary Contamment Purge and Vent valves dunng this penod i

1 Note 4: As left testing on AO-2377, AO-2378, AO-2381, AO-2383, AO-2386, AO-2387 and AO-2896 folloung T-shaped elastomer seal i replacement.

Note 5: As left testing due to maintenance on AO-7424A, AO-74248 and AO-74258. .j Note 6: As left testing due to concem for potenbal foulmg of seats due to torus painhng actmbes.