ML20076K451
From kanterella
ML20076K451 | |
Person / Time | |
---|---|
Site: | Harris, Brunswick, Robinson, 05000000 |
Issue date: | 11/02/1982 |
From: | Black R, Eury L, Furr B CAROLINA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML14188C120 | List: |
References | |
4CEPD, PROC-821102-01, NUDOCS 8309140357 | |
Download: ML20076K451 (150) | |
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18017A9271999-10-21021 October 1999
[Table view]Proposed Tech Specs Implementing Selected Improvements as Described in GL 93-05 ML20216J4111999-09-28028 September 1999 Proposed Tech Specs,Removing cycle-specific Min Critical Power Ratio Safety Limit Restriction ML20211G0501999-08-31031 August 1999 Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept ML18017A8531999-08-26026 August 1999 Proposed Tech Specs Pages,Revising TS 3/4.9.4 to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0521999-08-0404 August 1999 Proposed Tech Specs,Incorporating Analytical Methodology in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0451999-08-0202 August 1999 Proposed Tech Specs 6.2.2.e Re Operations Mgt License Requirements ML18016B0101999-07-0909 July 1999 Proposed Tech Specs 3/4.2.2,3/4.2.3 & 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Process by Implementing Guidance in GL 88-16 & NUREG-1431, Rev 1, Std Ts,W Plants. ML18016B0131999-07-0909 July 1999 Proposed Tech Specs,Relocating 3/4.3.3.3,3/43.3.4,3/4.3.3.9 & 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis, IAW GL 95-10 ML18016A9911999-06-15015 June 1999 Proposed Tech Specs Incorporating performance-based 10CFR50,App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9781999-06-0202 June 1999 Proposed Tech Specs Revising TS 6.5 & TS 6.8 ML20206R7931999-05-17017 May 1999 Revs Made to BSEP TS Bases Between 980605 & 990507,IAW TS 5.5.10.d ML20204D5241999-03-31031 March 1999 Rev 0 to Brunswick Steam Electric Plant,Unit 2 Simulator Certification Quadrennial Rept ML20204D4961999-03-31031 March 1999 Rev 0 to Brunswick Steam Electric Plant,Unit 1 Simulator Certification Rept ML20204G5991999-03-19019 March 1999 Proposed Tech Specs Re Balance of Plant/Emergency Bus AOT Extension ML18016A8401999-02-26026 February 1999 Proposed Tech Specs Revising Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints, Specifically Time Constants Utilized in lead-lag Controller for Steam Line Pressure Low (Table Item 1.e.) ML18016A7701998-12-23023 December 1998 Proposed Tech Specs 5.6, Fuel Storage, Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' ML20198K0411998-12-21021 December 1998 Rev 1 to Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML18016A9341998-12-15015 December 1998 Rev 11 to ODCM, for Shnpp ML18016A7531998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 7-5,incorporating Changes Resulting from Issuance of Amend 77 Re Afs SRs ML18016A7561998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 9-13,incorporating Changes Resulting from Issuance of Amend 84 Re SFP Water Level & Revised Fuel Handling Accident Analyses ML18016A7591998-12-0707 December 1998 Retyped Tech Specs Pages 3/4 6-4 & 3/4 6-4a,incorporating Changes Resulting from Issuance of Amend 84 Re Containment Air Locks ML18016A6571998-10-28028 October 1998 Corrected TS Pages 6-5 & 6-27 Re 970612 Request for Amend to License NPF-63 Re Proposed Changes to TS 6.0.Original Submittal Contained Editorial Errors ML18016A6261998-10-15015 October 1998 Proposed Tech Specs 3/4.5.1 Re Accumulators & Associated Bases ML18016A6051998-10-0101 October 1998 Proposed Tech Specs 3.0.4 Concerning Applicability of Limiting Conditions for Operation & SR to Be Consistent with GL 87-09 ML18016A5941998-09-23023 September 1998 Proposed Tech Specs 3/4.6.3, Containment Air Locks for Consistency with NUREG-1431,Rev 1 & Clarifying Requirements for Locking Air Lock Door Shut ML20153D8791998-09-14014 September 1998 Proposed Tech Specs 3.8.1 & 3.8.7 Re Balance of Plant/ Emergency Bus Allowable Outage Time Extension ML18016A5461998-09-0101 September 1998 Proposed Tech Specs Section 3/4.9.11,requiring 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML20238F6671998-08-28028 August 1998 Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML18016A5381998-08-27027 August 1998 Proposed Tech Specs,Revising Section 6.0, Administrative Controls. ML18016A5411998-08-27027 August 1998 Proposed Tech Specs Re Applicability of LCO & Surveillance Requirements ML18016A5311998-08-24024 August 1998 Proposed Tech Specs Re Use of SG Sleeves Designed by ABB-CE ML20237C0251998-08-17017 August 1998 Proposed Tech Specs 5.2.2.f Requiring Operations Manager or Assistant Operations Manager to Hold SRO License ML20237A5711998-07-16016 July 1998 Rev 10 to OENP-16.7, Administrative Control of Check Valve Disassembly Program ML20249B1161998-06-12012 June 1998 Proposed Tech Specs Page 3.3-56 for Issued Amends 203 & 233, Correcting Erroneous Inequality Sign for Allowable Value ML20249C0131998-06-11011 June 1998 Rev 0 to TR-ECCS-GEN-011, ECCS Suction Strainer Hydrodynamic Test Summary Rept ML20248A4681998-05-22022 May 1998 Proposed Tech Specs Pages to Rev E of Proposed License Amend for Conversion to Improved TS ML18016A4301998-05-15015 May 1998 Revised Proposed TS Pages Which More Closely Reflect Generic TS Wording Contained in Std TS W Plants ML20247H9481998-05-15015 May 1998 Revised TS Pages for Administrative Rev to Proposed Surveillance Requirements 4.7.2.b.2 & 4.7.2.c,to State That Charcoal Absorber Samples Will Be Tested IAW Methodology Provided by ASTM D3803-1989 at 30 C ML18016A4021998-04-24024 April 1998 Proposed Tech Specs 3/4.3.2,allowing Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML20217J9171998-04-24024 April 1998 Proposed Rev D to Improved Ts,Incorporates New ITS 3.6.3.2, Containment Atmospheric Dilution Sys ML20217H3061998-04-16016 April 1998 Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports ML18016A3881998-04-13013 April 1998 Proposed Tech Specs Bases Section 4.0.2,clarifying Guidance Related to Safety Performing Surveillance Testing at Power ML20216G7961998-04-0909 April 1998 Proposed Tech Specs,Revising Basis for Removing Suppression Chamber Temp Water Temp Monitoring Instrumentation Requirements ML20217Q1041998-04-0303 April 1998 Proposed Tech Specs Pages to Modify TS 3.5.3.1 & Associated Bases Section 3/4.5.3.1,to Revise Specified Total Volume of Condensate Storage Tank from 150,000 Gallons to 228,200 Gallons ML20217F9101998-03-27027 March 1998 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20217D5451998-03-24024 March 1998 Proposed Tech Specs 3.0 & 4.0 Re Applicability & Surveillance Requirements ML20216J8571998-03-13013 March 1998 Proposed Rev C to Improved Ts,Incorporating NRC Comments on Improved TS Submittal Resulting from Internal Reviews ML18016A3481998-03-12012 March 1998 Proposed Tech Specs Deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML20197A9371998-02-25025 February 1998 Rev 4 to 0AP-025, Bnp Integrated Scheduling ML20203H0481998-02-23023 February 1998 Proposed Tech Specs,Revising SLMCPR from 1.10 to 1.09 & Deleting Document Reference 1999-09-28 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20198K0411998-12-21021 December 1998
[Table view]Rev 1 to Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML18016A9341998-12-15015 December 1998 Rev 11 to ODCM, for Shnpp ML20238F6671998-08-28028 August 1998 Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML20237A5711998-07-16016 July 1998 Rev 10 to OENP-16.7, Administrative Control of Check Valve Disassembly Program ML20217H3061998-04-16016 April 1998 Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports ML20197A9371998-02-25025 February 1998 Rev 4 to 0AP-025, Bnp Integrated Scheduling ML20203M4031998-02-18018 February 1998 Rev 0 to Pump & Valve IST Program Plan Third Interval for Cp&L,Units 1 & 2 ML20197A9281998-02-12012 February 1998 Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake ML20204A7551998-02-0202 February 1998 Rev 0 to ESR 97-00706, Benchmark of Dll Computer Program ML18016A3051998-01-29029 January 1998 Rev 0 to HNP-IST-002, Shearon Harris Nuclear Power Plant, IST Program Plan - 2nd Interval. ML18022B0351998-01-26026 January 1998 Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. ML20199A9291998-01-22022 January 1998 Core Shroud Insp Plan Unit 1 B112R1 Outage April 1998 ML18016A4131997-12-18018 December 1997 Rev 10 to ODCM for Shearon Harris Nuclear Power Plant. ML20202D9151997-12-0202 December 1997 Rev 11 to 0AOP-34.0, Chlorine Emergencies ML20199J5711997-11-14014 November 1997 Rev 3 to 0AP-025, Bnp Integrated Scheduling ML20199J5601997-10-13013 October 1997 Rev 2 to 0AP-022, Bnp Outage Risk Mgt ML20198P4841997-10-0808 October 1997 Rev 1 to BSEP Unit 2 Core Shroud Insp Plan Outage B213R1 ML20210V1491997-07-23023 July 1997 Rev 6 to Security Personnel Training & Qualification Plan ML20196J5681997-07-17017 July 1997 1 to 2ASSD-05 Plant Operating Manual,Alternative Safe Shutdown Procedure Unit 2, Reactor Bldg North ML20148L7611997-06-12012 June 1997 Core Shroud Insp Plan Unit 2 B213R1 Outage,Sept 1997 ML20202D9331997-04-23023 April 1997 Rev 1 to 0FPP-038, Operation of SCBA Refill Sys ML20202D9371997-03-18018 March 1997 Rev 2 to Fire Protection Procedure OFPP-039, SCBA Use & Maint ML20115C6901996-06-30030 June 1996 Core Shroud Reinspection Plan for Unit 1 B111R1 Outage Oct 1996 ML20094E0861995-11-0202 November 1995 Core Shroud Reinspection Plan Unit 2 B2121R1 Outage for Feb 1996 ML20078P6731995-02-0909 February 1995 Core Shroud Reinsp Plan Unit 1 B110R1 Outage,Apr 1995 ML20079B0811994-12-14014 December 1994 Three-Yr Business Plan Performance Improvement Initiatives & Projects ML20073K8991994-10-0303 October 1994 Rev 47C to Plant Emergency Procedure (Pep) 0PEP-APPENDIX a, Emergency Response Resources ML18011A8031994-08-31031 August 1994 Rev 5 to Odcm. ML20071P1491994-08-0202 August 1994 Three-Yr Business Plan Performance Improvement Initiatives & Projects ML18011A5631994-07-0101 July 1994 Rev 4 to Odcm. ML20029E2471994-05-0404 May 1994 Three Yr Business Plan Performance Improvement Initiatives & Projects. ML20072M8571994-03-29029 March 1994 Rev 0 to Plan Mod 94-0077, Unit 2 Core Shroud Mod ML20217D4911993-07-30030 July 1993 Rev 0 to B-SP-93-06 Assessment Plan Outline, Program or Area:BNP-1 Startup & Power Ascension Readiness Assessment ML18011A1111993-07-0707 July 1993 Rev 8 of ISI Program ISI-203, ASME Section XI Pump & Valve Program Plan. ML20045E0971993-05-16016 May 1993 Mod 91-038 to Field Rev 3 to Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & RHR Procedure ML20044G6131993-05-11011 May 1993 Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews. ML20044C6191993-03-0101 March 1993 Rev 4 to Design Guide DG-II.20, Civil/Structural Operability Reviews. ML18011A1181993-01-0606 January 1993 Rev 3 to Odcm. ML18010A8491992-09-23023 September 1992 Change 1,Rev 5 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1825, Safety Injection:Esf Response Time, Train a 18 Month Interval on Staggered Test Basis Mode 5 - 6. ML20116D2961992-08-31031 August 1992 Rev 2 to Nuclear Generation Group Manual 305-05, Prioritization Process ML18010A8361992-08-28028 August 1992 Change 2,Rev 2 to Vol 4,Part 7 of Plant Operating Manual Procedure MST-I0080, RCS Wide Range Pressure P-0402, Reflecting Case Level Change to Case III ML20044G6141992-07-31031 July 1992 Rev 0 to 92C1737A, Recommended Operability Review Criteria for Piping Sys Subj to Level D Svc Loadings for Carolina Power & Light Nuclear Stations. ML20099G3101992-07-17017 July 1992 Rev 1 to Procedure WDP-002, Phase II Walkdown Procedure for Reactor Building Miscellaneous Steel & Drywell Platform Steel PM-91-038, Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr1992-05-21021 May 1992 Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr ML18010A8371992-05-0404 May 1992 Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train 'A' Slave Relay Test 18 Months Interval Modes 5 & 6. ML18010A5471991-12-18018 December 1991 Rev 3 to Odcm. ML20056D6011991-11-19019 November 1991 Rev 2 to Performance Test Procedure 2-PT-24.6.4, SWS Hydraulic Performance Test for Bsep,Unit 2 ML20082H7521991-08-21021 August 1991 Rev 11 to ODCM ML20082H7501991-08-21021 August 1991 Rev 3 to Process Control Program ML20083A6541991-08-19019 August 1991 Rev 1 to Design Guide DG-VIII.50, Instrument Setpoints 1998-08-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20076K451&oldid=2766629"