Public Version of Rev 8 to Emergency Plan Implementing Procedure FNP-0-EIP-15, Emergency Drills. & Receipt Form
ML20079L681
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/22/1983
From: Hudspeth J
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20079L673 List:
References
FNP--EIP-15, FNP-0-EIP-15, NUDOCS 8401260270
Download: ML20079L681 (9)


Text

'

I l .

p.9(9 VOL. 14 FNP-0-EIP-15  ;

December 19, 1983 Revision 8 FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-EIP-15 S

. A F

E T

Y EMERGENCY DRILLS R

E L

A T

E D

Approved:

i . _?!L Mant Manager '

Date Issued: / 2 - 2. Z -i %

List-of-Effective-Page Page Rev. #

1 7 2-5 8 Fig. 1 8 DOCUMENT CONTROL CONTROLLED COPY DO NOT REPRO E Diskette EIP-2 COPY NO. O 8401260270 840118 PDR ADOCK 05000348 h

F PDR [ 00

~. .

VOL. 14 FNP-0-EIP-15 l

EMERGENCY DRILLS 1.0 Purpose This procedure provides instructions and describes responsibilities for conducting emergency plan drills and testing communications networks.

2.0 References Joseph M. Farley Nuclear Plant Emergency Plan.

3.0 General 3.1 Announced preplanned drills simulating emergencies will be conducted to:

3.1.1 Determine the effectiveness of the FNP emergency organization in handling _ _ _

emergencies.

3.1.2 Evaluate communication and action support with offsite agencies.

3.1.3 Evaluate the interface with and response of the company emergency organization.

3.1.4 Test the adequacy of timing and contents of the EIP's.

3.1.5 Test the emergency equipment.

3.1.6 Keep affected personnel aware of their role in the plan.

3.2 The scenarios for use in theMis -will be writt.en and include the following elementsi' N-3.2.1 The basic objective l 3.2.2 The date, time, place (s) and participating organizations, i

3.2.3 The simulated event 3.2.4 A time schedule of real and' simulated events.

Rev. 7 1

~. .

VOL. 14 FNP-0-EZP-15 3.2.5 A narrative summary describing conduct of the drill.

3.3 Each emergency alarm or announcement shall be "

considered valid unless an announcement is made to the centrary.

3.4 Each individual at the Farley Nuclear Plant shall participate in emergency plan drills unless specifically exempted by the Plant Manager.

3.5 The Plant Manager shall evaluate the plant

, operating status and ascertain that the drill will not adversely affect plant operations or equipment or the health and safety of the general public.

3.6 Audit observers shall be stationed at various I locations to observe each individuals' ability to perform his assigned emergency function.

3.7 All drills shall be coordinated with the shift supervisor to the extent necessary to prevent an adverse effect on plant operations.

3.8 Required drills listed in 4.3 may be conducted in the course of the same exercise.

4.0 Responsibilities (See Figure 1) 4.1 As directed by the Plant Manager, the Training Director will coordinate the scheduling and l conduct of drills. He will be provided with technical assistance from the Sector Supervisor -

Environmental and Emergency Planning. The Training Director will be responsible for the following general elements of drills: ,

4.1.1 Scenario development 4.1.2 Audit Observer assignments 4.1.3 Drill execution 4.1.4 Post drill critiques 4.1.5 Emergency Plan training for APCO employees 4.1.6 Scheduling of Emergency Plan training for non-APCO personnel.

4.2 The Sector Supervisor - Environmental and Emergency Planning will provide the following assistance tc the Training Director as requested:

l Rev. 8 2

m

~. . l

. 1 VOL. 14 FNP-0-EIP-15 4.2.1 Technical assistance for scenario development 1

4.2.2 Drill audit observer personnel 4.2.3 Personnel as instructors for Emergency Plan training for APCO and non-APCO employees.

4.3 The Training Director will plan offsite agency l participation via the Superintendent Regulatory and Procedure Control who conducts liason with such agencies.

5.0 Procedure 5.1 Testing of the Plant Emergency Alarm shall be as follows:

5.1.1 Operations will be responsible for scheduling and performing the weekly sounding of the Plant Zmergency Alarm.

5.1.2 All alarm tests shall be preceded by announcing over the plant public address system that the alarm is to be sounded.

5.1.3 All alarm tests shall be concluded when the completion of the test is announced over the plant public address system.

5.2 Unannounced communications checks shall be conducted as follows:

(

l 5.2.1 Communications checks will be performed monthly with all locations which are part of the Emergency Notification Network by the Operations Group. The Southeast Division conducts daily tone l

tests of the Emergency Notification Network.

5.2.2 The EOF /TSC/OSC intercom system will be tested at least_ annually by the Operations Group.

l Rev. 8 3

l -

VOL. 14 FNP-0-EIP-15 5.2.3 Communications checks and verification of phone numbers with all other organizations listed in EIP-8 will be performed quarterly by the Chemistry and Environmental l Group.

5.2.4 Radio communication equipment for Radiation Monitoring Team communications will be tested at least annually by the Security Group.

5.3 The following Emergency Plan drills shall be conducted in the periodicity specified below.

Required drills may be conducted concurrently in the same exercise.

5.3.1 Annual Radiation Emergency Exercise Announced exercises simulating rad 2ation .

emergencies will be held at least annually.

These scenarios will be varied from exercise to exercise such that all major elements of the plan and emergency organizations are exercised at least once every 5 years. These exercises will be preplanned and will involve the active participation of local, state and federal agencies.

One (1) exercise may be started between 6 P.M. and midnight and another between midnight and 6 A.M. once every six(6) years. One (1) exercise may be performed every six years which is unannounced, except as required for effective coordination with the management of the various agencies and for the evauation of the health and safety of the general public.

5.3.2 Fire Drills

a. Fire Drills will be' conducted' with fire brigade members as required by the plants technical specifications.
b. Fire Drills will be conducted annually which will involve the Dothan Fire Department.

5.3.3 Medical Emergency Drills A medical emergency drill will be conducted annually which will involve ambulance and offsite medical treatment facility participation.

Rev. 8 i 4 j 1

. VOL. 14 FNP-0-EIP-15 5.3.4 Radiological Monitoring Drills Radiological monitoring drills will be conducted annually which will include i initiating onsite and offsite radiological l monitoring of vegetation, soil, water, and air.  ;

I 5.3.5 Health Physics Drills  !

l Health Physics drills will be conducted  !

semi-annually which will involve response to simulated elevated airborne and j liquid samples and direct radiation measurements in the plant environment.

Sampling of the reactor coolant system including using the post-accident sampling system will be conducted annually.

5.4 At the conclusion of the drill the Emergency Director shall announce that the drill has been terminated.

5.5 Appropriate local, state, and federa] agencies will be advised of major drills in advance to allow their observation or participation. All observing or participating agencies will be requested to provide comments on drill evaluation to the Training Director. l 5.6 Upon drill termination, the Training Director l will conduct a post drill critique with the drill observers. Equipment, procedure, performance, training, drill, etc. deficiencies will be g summarized in a written critique format. Comments received from offsite agencies will be incorporated in this critique. The critique will be presented to the Assistant Plant Manager by the Training Director for review and finalization. Upon l completion of this review and finalization, the critique will be forwarded to the Plant Manager for review. The Assictant Plant Manager may assign items from the critique to appropriate Superintendents for action.

5.7 Documentation of drill scenario, drill participation and drill critique sill be ~ forwarded to Document Control in accordance with FNP-0-AP-27.

5.8 The Training Director will track drill participation l by individuals who fill the Emergency Director, Operations Manager, Maintenance Manager, Technical Manager and Health Physics Manager roles.

Participation in each role will be rotated.

Rev. 8 5

= _ _ = . = _ . .__.-.. . .. . .. ..

i j- FNP-0-EIP-15 l

l l

' 1 Figure 1 Emergenev Plan Drill Organization 9

Plant Manager 1

1 Supe rintenden t Regulatory and ,, , , ,,,,,,,,,, , Training Procedure Control Director

/

Sector Supervisor Env. & Emer. Planning -

4 Drill Observers t

i J

l I

I

-Figure 1 Rev. 8 i

I y m p a <w. -r .eW, sy 9 g

AlabamaPower the southem ewrc system December 28, 1983 l Director, Office of Nuclear Reactor Regulation ATTN: Document Control Desk

! US NRC '

Washington, DC 20555

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure, FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Plan Implementing Procedures, i

Please verify that you have the procedures with the corresponding copy numbers that are listed on the Document Transmittal Form.

Please sign and return the forms as soon as possible to the following address:

Alabama Power Company Farley Nuclear Plant P.O. Box 470 Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at 205-899-5156, Ext. 422.

Sincerely, I

goje B.pudspeth /

Ni Do6mentControlppervisor JBH:hrc cc: Larry W. Enfinger File f? )

I W 9 7 f

Document Transmittal Form Farley Nuclear Plant Production Department - Document Control AlabamaPower A  !

{' o.it Romerkst

&nd lotLZ h4 D-A? D Y $1>f 2 AYb , & ,

TRANSMITTED RETURN REQ'STED REMARKS NC. REV. COpv NO. R E V. CO*V TITLE ANO/OR NUMBER CD$. NC. NC. CPS. No. N C.

Jlb-o-Exp./r / X er (E) r

\.

w.

i i l i i t

6 l l l l I i l i _

INSTRUCTIONS TO ADORESSEE

?. Venly t*e doCumnets received agree witn the acove oescript.cn.

, 2. InCotDorete the transmittec documents into your h300 l 3. CoCuments or portione thereof otetently in your possessionwnecn are superseded DV too docurnents Moreov tracismetted must ce C:early marted *"/010" or testroyed. If return of superseoec documents s reowested in the above " Return Peowested'* C04umn. attaCn tne superseced docurnents to tnis form or cr to

.et trneng it.

. Sign .n ene space oetow one.cating tnat you neve Corno4eted tneee estructione and return tne routing Coov of tnis *orm to tMe ceion acdress.