05000416/LER-1983-156, Updated LER 83-156/03X-1:on 831003,capscrew Securing Starting Air Manifold to Support Plate on Left Bank Cylinder 8 Found Broken Inside Plate.Cause Undetermined.Capscrew replaced.W/840302 Ltr

From kanterella
Revision as of 14:03, 14 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated LER 83-156/03X-1:on 831003,capscrew Securing Starting Air Manifold to Support Plate on Left Bank Cylinder 8 Found Broken Inside Plate.Cause Undetermined.Capscrew replaced.W/840302 Ltr
ML20087D056
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/02/1984
From: Byrd R, Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-84-0136, AECM-84-136, LER-83-156-03X, LER-83-156-3X, NUDOCS 8403130274
Download: ML20087D056 (3)


LER-2083-156, Updated LER 83-156/03X-1:on 831003,capscrew Securing Starting Air Manifold to Support Plate on Left Bank Cylinder 8 Found Broken Inside Plate.Cause Undetermined.Capscrew replaced.W/840302 Ltr
Event date:
Report date:
4162083156R00 - NRC Website

text

83 UpdateReport-PreviousRep{r Dgli Attachment to AECM-84/0136

~

Page 1 Of 1

  • JONTRth. SLOCK: l t

} l l } l

.h l MDSHRINT OR TM AU. REQUIRED INFKMATION)

Lo.Dj l W sl Gl G l d i l@i o I ol I ol o I of o I ol- I of o Gl 4 I 1111 11 1 l@l l I@ l 7 8 9 UCENSEE CODE to 15 uCENSE NuhstER 31 > 38 ucEseSE TYPE Jo 57 CAT us CCMT Lo_hld l' "C L'AlofsioIofoI 41 11 60 11 88 o W I of EVENT 31 el DATE3J@l o I si ol 74 75 21OATE REPORT e 1 4J@ 80 7 80 61 oOCKET NUW8ER l

EVENT DESCRIPTION AND PRDSABLE CONSEQUENCES h

@ lDuring a routine insoection of the Div. I D/G. a caoscrew securino the I

[oja_J lstarting air marhi f old to its support plate on the No. 8 lef t bank cylin-j o 141 l der was f ound broken inside the plate. A similar capscrew on the No. 7 l a w lLB cylinder was found not securely tightened. An LCO was entered (Div. Il ,

@ ID/G deelared inoperabla) pursuant to T.S.3.8.1.1.a since it was l

[T[Il l questionable whether the seismic component (support plate) was capable  !

[olsilof perferming its designed function. Div. 2 & 3 D/Gs were operable. l

  • EoE C cOoE 55eC0of consiOseENT Cone Su8Co'oE Sue $'oE Q 8 l El E lh [Ejh Jh l El Nl G{ Il N1 E l@ [Zj@ [Z,J @

9 90 12 13 18 20 Il 19

- SEQUENTIAL OCCURRENCE REPORT REVISION LEP AO EVENTVEAR REPORT se0L CODE TYPE NO.

@gg 181 31

,,,. 21 22 L_1 23 1215161 24 2 Ld 27 L

2 2L_J 29 Lxj 30 L-J 11 LLI 32 KE A NT REE T M TTES FORM 8. SUPPL 1 MANUPACT RER Laj@L zl@ LZJ@ L2)@ l I foi I L"J@ W@ LaJ@ 'l i 15151@

33 34 3 3 37 43 41 42 43 _ 44 47 CAUSE DESCR.RTIOes Aas0 CORRECTIVE ACTIONS h g o](The rent cause of the failed capscrew could not be determined due to thel g ] lcapscrew being removed and eliminated before an accurate analysis could l

, 7 lbe performed. The failed capscrew was replaced 'ith one of the same type l g land grade. The other capscrew was tightened _ its required torque. Thel D/G was ut f service f r 6.5 h urs. This is a final report.

8L a 7 a 80 l

ST  % POWER OTHER STATUS D SC R DISCOVERY DESCRIPTION

{~-[] Wg l 0 l 0 l 1 g M [ Routine Inspection l

ACTivlTY C TENT REu ASto 0, ,,E u ASE

-10p ACTiviTv @ I tOCATiON OP REuASE @

7

>e 8 9 LrJ @ Lrjgi n 10 de in 4

i ft 80 PERSOssNEL EMPOSURES 1 NUMSER TYPE DESCP**Teose 39 I 810101018L2J@t

" l

,ERSO,. A',.ua ES '

NUweE n DESCR PfiO4 8101010 l@l" 7 8 9 19 12 60 l

LOSS 08 OR CAMAGE TO PACipTV Q TvPE DE SCRIPTION v

' " ' R403130274 840302

,ust$Tv n PDR ADOCK 05000416 iss o S PDR Nac usE ONLY . i L2_LoJ l_ynJ81gmPTiONU45 .

I IIIIIIII!!IIli 7 8 9 to 68 69 80 5 ,

NAME OF PRtPARER PHONE: j

f l

N MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mizsissippi P. O. B O X 164E 0. yg S O N. MIS SISSIP Pl 3 9 205

] March ?, 1984 NUCLE AR PRODUCTION DEPARTMENT U. S. Nuclear Regulatory Commission Region II 101 Marietta St. , N.W. , Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - Capscrew Securing Division 1 Diesel Generator Starting Air Manifold to its Support Plate Found Broken LER 83-156/03 X-1 AECM-84/0136 This letter submits an update to a previous report submitted on November 2, 1983. The event for which the report was submitted occurred on October 3, 1983, during a routine inspection of the Division 1 Diesel Gcnerator, when a capscrew securing the starting air manifold to its support plate on the Number 8 lef t bank cylinder was found broken inside the plate. A similar capscrew on the Number 7 left bank cylinder was found not securely tightened. A Limiting Condition for Operaticn was entered pursuant to Technical Specification 3.8.1.1.a. This was reported pursuant to Technical Specification 6.9.1.13.b.

Our investigation into the cause of de event is complete. Attached is LER 83-1.,6/03 X-1 which is a final report.

Yout truly, L. F. Dale

!!anager of Nuclear Services EBS/SHH: sad Attachment cc: (See Next Page) dFFICIAL Copy e-~

Member Middle Sout.h Utilities System I,I i

. AECM-84/0136 MISSIOCIPPI POWER Q LIGHT COMPANY #E" cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

,