IR 05000170/2002001

From kanterella
Revision as of 04:25, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
OL50-170/02-01 Exam Scheduling for Armed Forces Radiobiological Research Institute for Week of April 4, 2002 (90-day Letter)
ML020350681
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 02/06/2002
From: Doyle P
NRC/NRR/DRIP/RORP
To: Miller S
US Dept of Defense, Armed Forces Radiobiology Research Institute
Doyle P, NRC/NRR/DRIP/RORP, 415-1058
References
IR-02-001
Download: ML020350681 (7)


Text

February 6, 2002 Mr. Stephen I. Miller, Reactor Facility Director Armed Forces Radiobiology Research Institute Naval Medical Center 8901 Wisconsin Avenue Bethesda, MD 20889-5603

Dear Mr. Miller:

I made arrangements with you for the administration of operator licensing examinations at the Armed Forces Radiobiological Research Institute TRIGA reactor. The written and operating examinations are scheduled for the week of April 04, 2002.

To meet this schedule, I will use the material you have already provided. If you have any updates to this material please send them to me as soon as possible at the following address:

(U.S. Postal Service) (Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Paul Doyle ATTN: Paul Doyle Mail Stop O-12 D-1 Mail Stop O-12 D-1 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 You are responsible for providing adequate space for proper conduct of the written examination. Enclosure 1, "Administration of Written Examinations," describes our process for conducting these examinations.

Enclosure 2 contains the Rules and Guidelines that will be in effect during the administration of the written examination. Please ensure that all applicants are aware of these rules.

Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 3, "Facility Review of Written Examinations."

Final, signed senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and process the applications. If our review cannot be completed in time to make a determination of applicant eligibility, the candidate may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.

Mr. This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires April 30, 2003. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-170 Enclosures: 1. Reference Material for NRC Operator Licensing Examinations (Non-Power)

2. Administration of Written Examinations 3. Procedures for Administration of Written Examinations 4. Facility Review of Written Examinations Prior to Administration cc w/enclosures:

Mr. February 6, 2002 This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires April 30, 2003. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-170 Enclosures: 1. Reference Material for NRC Operator Licensing Examinations (Non-Power)

2. Administration of Written Examinations 3. Procedures for Administration of Written Examinations 4. Facility Review of Written Examinations Prior to Administration DISTRIBUTION:

PUBLIC RORP r/f PMadden Facility File (EBarnhill) O-6 D-17 WBeckner MMendonca ADAMS ACCESSION #: ML020350681 TEMPLATE #: NRR-079 OFFICE: RORP:CE IEHB:LA RORP:SC NAME: PDoyle:rdr EBarnhill PMadden DATE: 02/ 05 /2002 02/ 05 /2002 02/ 06 /2002 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

ADMINISTRATION OF WRITTEN EXAMINATIONS 1. The facility licensee must provide a single room for the administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.

2. Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).

3. The facility must make arrangements acceptable to the chief examiner if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.

4. The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed.

5. Applicants may bring pens, pencils, calculators and slide rules into the examination room. Only black ink or dark pencils should be used for writing answers to questions.

6. The Chief Examiner must approve any wall charts, models, or other training materials present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.

7. The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5)

working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

ENCLOSURE 1

PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS 1. Verify candidate identity.

2. Pass out examinations and all handouts. Instruct applicants not to review examination until instructed to do so.

READ THE FOLLOWING INSTRUCTIONS VERBATIM:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.

2. When you have completed your examination, you must sign the statement at the bottom of the cover sheet. This must be done after you complete the examination.

READ THE FOLLOWING INSTRUCTIONS:

1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.

2. Use black ink or dark pencil only to facilitate legible reproductions.

3. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.

4. Mark your answers on the answer sheet provided.

5. The point value for each question is shown in [brackets] after the question.

6. If the intent of a question is unclear, ask questions of the examiner only.

7. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.

8. To pass the examination, you must achieve a grade of 70 percent or greater in each category.

9. There is a time limit of one hour per section of the examination. E.G., A one section retake examination has a one hour time limit, while a normal three section initial examination has a three hour time limit.

10. After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

ENCLOSURE 2

FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION 1. At the option of the Program Director, Operating Reactor Improvements (RORP), the facility may review the written examination up to two weeks prior to its administration.

This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility.

Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.

a. Pre-Examination Security Agreement I ______________________ acknowledge that I have acquired specialized knowledge concerning the examination scheduled for _________________ at

___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.

______________________________________

Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b. Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of

____________________________ at ____________________ or any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.

__________________________________

Signature/Date ENCLOSURE 3

-2-2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.

If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.

3. The following format should be used for submittal of specific comments:

a. Listing of NRC question, answer and reference b. Facility comment/recommendation c. Reference (to support facility comment)

NOTES: 1. No change to the examination will be made without submittal of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.

4. A two-hour post examination review may be held at the discretion of the Chief Examiner.

If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.