ML020990363
ML020990363 | |
Person / Time | |
---|---|
Site: | Surry ![]() |
Issue date: | 04/03/2002 |
From: | Sarver S Virginia Electric & Power Co (VEPCO) |
To: | Office of Nuclear Reactor Regulation |
References | |
02-216 | |
Download: ML020990363 (2) | |
Similar Documents at Surry | |
---|---|
Category:Report
MONTHYEARML23167B0072023-05-31031 May 2023
[Table view]Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20091L9852021-05-0404 May 2021 Record of Decision ML20091L9832021-05-0404 May 2021 SLR License ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 2023-05-31 Category:Technical MONTHYEARML23167B0072023-05-31031 May 2023
[Table view]Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML14086A1732014-04-0909 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14079A0182014-02-27027 February 2014 30-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14043A4442014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2) ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML11215A0592011-06-30030 June 2011 WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403 ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. ML1026002162010-05-13013 May 2010 Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML0926606162009-08-27027 August 2009 LTR-SGMP-09-108 NP-Attachment, Response to NRC Request for, Additional Information on H*; Model 44Fand Model 51F Steam Generators. ML0921504622009-06-30030 June 2009 WCAP-17092-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 51F), Attachment 6 ML0921202022009-05-0606 May 2009 LTR-SGMP-09-64 Rev. 2 Np, Surry, Unit 1, Support for Emergency Technical Specification Amendment to Address Permeability Variation Signals at the Tube Ends. ML0826107152008-09-17017 September 2008 Final Precursor Analysis - Surry 2 (LER 281/06-002) ML0823200152008-08-18018 August 2008 Cycle 22 Startup Physics Tests Report 2023-05-31 |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 3, 2002 Director of Nuclear Reactor Regulation Serial No.: 02-216 United States Nuclear Regulatory Commission NLOS/mm Washington, DC 20555-0001 Docket No.: 50-281 License No.: DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 STEAM GENERATOR TUBE INSPECTION REPORT Planned inservice inspection of the Surry Unit 2 "A" steam generator was completed during the Spring 2002 Refueling Outage. In accordance with Surry Power Station Technical Specification 4.19.F.a, this letter provides notification of the number of steam generator tubes that were plugged during the outage.
Steam Generator "A" One tube (R1 1, C24) was plugged based on the review of the current inspection data, evaluations required by the S/G Program Plan, and updated industry information as referenced in the pre-outage assessment. None of the indications in Tube Ri 1, C24 exceeded the 40% through-wall plugging limit. Tube Ri 1, C24 was administratively plugged based upon the projected growth rate and the fact that the anti-vibration bar (AVB) wear indication was at a non-typical location. The wear indication was related to the tip of the AVB contacting the tube.
No new commitments are being made as a result of this letter. If you have any questions concerning these results, please contact us.
Very truly yours, Nuclear Licensing and Operations Support