ML030850484

From kanterella
Revision as of 23:56, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
E-mail S. Long, NRR, to Beth Wetzel, NRR, Meeting with Nei/Mrp
ML030850484
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/15/2002
From: Long S
Office of Nuclear Reactor Regulation
To: Wetzel B
Office of Nuclear Reactor Regulation
References
BL-01-001, FOIA/PA-2003-0018
Download: ML030850484 (1)


Text

J[6675'- Long6 CMEETFNG WITH NEI/MRP RE: '-'ag1 From: Steven Long >

To: Beth Wetzel-,

Date: 4/15/02 1:56PM

Subject:

MEETING WITH NEI/MRP RE.

Beth, I have scheduled construction work on m y house for May 20. If it rains that day, it will need to be rescheduled for the same week, to keep it in sync with other work by other contractors The best bet for me to be able to attend is to get it before the 20th. Ifthat isn't practical, then as late in the week of teh 20th as possible is the next best bet Steve

>>> Beth Wetzel 04/15/02 01:41 PM >> >

Bulletin 2001-01 Primaries, NEI/MRP would like to reschedule our 4/19 meeting for the morning of one of the following dates* 5/21, 5/22 or 5/23. The proposed topics are the following

- crack growth rate for Alloy 600

- OD crevice environment (implications of Davis Besse)

- PFM - base cases and sensitivity studies

- collateral damage associated with CRDM risk assessments Please let me know your availabilities for one of those 3 mornings Also, give me your assessment whether one morning is sufficient to address such a list of items And are there other items that need to be added to the list? Would it be appropriate to discuss any of these items in smaller working groups (via telecon or in person)? We have a lot to resolve with a very aggressive schedule and I'm attempting to use our resources as efficiently as possible Wally, please forward this e-mail to any of the contractors that need to be here and I haven't already included.

Thanks, Beth, LPM 2001-01