MONTHYEARL-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-168, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-155, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-140, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 2024-09-09
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARL-16-055, Response to Request for Additional Information Regarding VIO 05000440/2015010-012016-02-24024 February 2016 Response to Request for Additional Information Regarding VIO 05000440/2015010-01 L-15-375, Reply to a Notice of Violation2016-01-15015 January 2016 Reply to a Notice of Violation L-10-242, Reply to a Notice of Violation: EA-10-0352010-08-30030 August 2010 Reply to a Notice of Violation: EA-10-035 L-09-159, Response to Annual Assessment Letter2009-06-0202 June 2009 Response to Annual Assessment Letter ML0631001932006-10-26026 October 2006 Response to Issues Identified in NRC Inspection Report 05000440-06-014 ML0615204912006-05-24024 May 2006 Response to Us NRC Inspection Report 05000440-06-08 - Perry Nuclear Power Plant Confirmatory Action Letter Followup Inspection Corrective Action Item Implementation Inspection ML0613602182006-05-0909 May 2006 Response to Nuclear Regulatory Commission Inspection Report 05000440/2006007 - NRC Follow Up Inspection of IP 95002 Action Items ML0522105152005-08-0808 August 2005 Denial of Non-cited Violations Contained in NRC Inspection Report 05000400/2005003 ML0522105122005-08-0808 August 2005 Response to NRC Inspection Procedure 95003 Supplemental Inspection, Inspection Report 05000440/2005003 ML0512503422005-04-28028 April 2005 Reply to a Notice of Violation, EA-04-214 ML0513003072005-03-28028 March 2005 Reply to a Notice of Violation and Notice of Payment of Civil Penalty; EA-01-083 ML0510301682005-03-25025 March 2005 Reply to a Notice of Violation; (EA-01-082; EA-04-172) ML0412704862004-04-30030 April 2004 Response to Enforcement Action EA-03-208 from, Perry Nuclear Power Plant, Notice of Violation ML0410606092004-04-0808 April 2004 Reply to a Notice of Violation; EA-04-020 ML0406503632004-02-27027 February 2004 Reply to Notice of Violation; EA-03-197 ML0330404082003-10-24024 October 2003 Revised Response to a Notice of Violation, EA-03-007 ML0310002362003-04-0303 April 2003 Reply to a Notice of Violation; EA-03-007 2016-02-24
[Table view] |
Text
FENOC 0"%
Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 William R. Kanda Fax. 440-280-5579 440-280-8029 Vice President - Nuclear April 08, 2004 PY-CEI/NRR-2786L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket Number 50-440 License Number NPF-58
Subject:
Reply to a Notice of Violation; EA-04-020 Ladies and Gentlemen:
Enclosed is the response to Notice of Violation, EA-04-020, issued to the Perry Nuclear Power Plant (PNPP) by the Nuclear Regulatory Commission on March 12, 2004. The details of the violation were documented in NRC Inspection Report Number 05000440/2003-010 issued on January 30, 2004. The violation was issued for failure to establish adequate written procedures to periodically vent the highest point on the discharge of the common low pressure core spray and residual heat removal 'A' water leg pump, in violation of Technical Specification 5.4. The violation is associated with a white significance determination process finding.
There are no regulatory commitments contained in this submittal. Any actions discussed in this document that represent intended or planned actions, are described for the NRC's information, and are not regulatory commitments.
If you have any questions or require additional information, please contact Mr. Vernon Higaki, Manager-Regulatory Affairs, at (440) 280-5294.
Very truly yours, g ;
Enclosure /
cc: NRC Region IlIl Administrator NRC Senior Resident Inspector - PNPP NRR Project Manager- PNPP
.l:...:.
PY-CEI/NRR-2786L Enclosure Page 1 of 3 REPLY TO A NOTICE OF VIOLATION; EA-04-020 RESTATEMENT OF THE VIOLATION Technical Specification 5.4 requires, in part, that procedures shall be established, implemented and maintained as recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Appendix A, Section 4, "Procedure for Startup, Operation, and Shutdown of Safety Related BWR Systems," recommends the establishment of written procedures for venting of emergency core cooling systems.
Contrary to the above, as of August 14, 2003, the licensee had not established adequate written procedures to periodically vent the high point on the discharge of the common Low Pressure Core Spray (LPCS) and Residual Heat Removal (RHR) train 'A' water leg pump. Specifically, the licensee did not include Valve N27F786 in Procedures SVI-E21-T1181, "LPCS Venting and Valve Lineup Verification," Revision 4 or SVI-E12-T1 182A, "RHR A LPCI Valve Lineup Verification and System Venting,"
Revision 2. As a result, gas accumulated in the vertical section of piping on the discharge of the water leg pump and, following a loss of offsite power on August 14, 2003, the accumulated gas expanded, air bound the water leg pump and rendered LPCS and RHR 'A' inoperable.
REASON FOR THE VIOLATION A procedure content deficiency contributed to the failure of the common LPCS and RHR "A" water-leg pump due to air binding. Another effect of the water-leg pump air binding was the division I feedwater leakage control system (FWLCS) and the suppression pool cooling mode of RHR 'A" were considered unavailable for a loss of offsite power event. The air binding of the water-leg pump is discussed in the root cause analysis report approved on October 8, 2003 for Condition Report (CR) 03-04764. The CR stated that inadequate venting procedures failed to remove entrapped air from two high point locations in the division 1 LPCS system and LPCS/RHR "A" water-leg pump piping including the FWLCS high point vent valve, 1N27-F786 and the LPCS/RHR "A" crossover piping, 1E21-F511. A review of historical system operating instructions for LPCS showed the FWLCS high point vent valve and the LPCS/RHR "A" crossover piping vent valve had not been included in the past filling and venting instructions.
Additional investigation of the cause of the air binding of the water-leg pump is in progress. Further correspondence will be submitted if there are substantive changes to the information provided to date.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND THE RESULTS ACHIEVED At 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br /> on August 14, 2003, plant operators completed venting the LPCS/RHR "A" water-leg pump by opening the pump casing vent valve. Following venting, the LPCS/RHR "A" water-leg pump was started and developed normal discharge pressure. The LPCS and RHR "A" systems were then filled and vented.
Since the low pressure alarms cleared and the venting was completed, the RHR "A" system was declared operable at 2002 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.61761e-4 months <br /> on August 15, 2003. LPCS was subsequently declared operable at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> on August 16, 2003. It was not detected
PY-CEI/NRR-2786L Enclosure Page 2 of 3 at this time that air was still contained in FWLCS and that it would prevent the operation of the division 1 FWLCS and the suppression pool cooling mode of RHR "A" following loss of offsite power events.
Additional venting was performed on September 11, 2003, as part of the investigation of the air binding event. Following venting of the division 1 feedwater leakage control system piping and the LPCS/RHR "A" crossover piping, it was recognized that the FWLCS piping and the crossover piping had contained a significant volume of air. At the completion of these venting evolutions, the previously unidentified loss of function of the FWLCS and the suppression pool cooling mode of the RHR "A" train was restored.
The LPCS system operating instruction, SOI-E21, was revised (revision 11 effective September 12, 2003) to include 1N27-F786, 1E12-F511 and two additional valves to vent air from the suction of the LPCS/RHR "A" water-leg pump piping, the LPCS pump piping and the division 1 feedwater leakage control system piping.
Surveillance procedure, SVI-E21-T1181, "LPCS Venting and Valve Lineup Verification" was revised (revision 5 effective September 12, 2003) to provide instructions to vent any collected air from valve 1N27-F786 and valve 1E21 -F51 1.
The LPCS system operating instruction was subsequently revised (revision 12 effective October 23, 2003) to provide explicit instructions for venting that included a required venting time of three to five minutes.
The LPCS surveillance was subsequently revised (revision 6 effective November 7, 2003) to provide explicit instructions for venting that included a required venting time of three to five minutes.
Periodic venting (weekly at first) was established to determine air accumulation rates in this piping. The period of time between venting was gradually increased based on identified air accumulation rates. Although air has been noted during venting evolutions, an air volume sufficient to impact operability has not been observed. The venting is now performed monthly in accordance with the surveillance interval.
CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATIONS No prior site corrective actions exist for similar issues, but industry wide operational
-experience indicates air binding of pumps in general is an issue. To that end, an extent of condition evaluation was performed that included pumps at the Perry Nuclear Power Plant, which perform a keep fill function and utilize a minimum flow restriction orifice to maintain a required backpressure. The review determined this issue (generation of air in LPCS/RHR "A" water-leg pump) is not present in the other emergency core cooling and reactor core isolation cooling water-leg pumps or the fire jockey pump. This is based on evaluations of the piping configuration differences, flow calculations through the associated minimum flow orifices and venting to determine that the piping is water solid.
Additionally, ultrasonic measurement testing was performed utilizing a Shear Wave instrument to verify accessible portions of the division 1 and 2 FWLCS piping were filled with water. Although this review determined that venting instructions on these systems were adequate, the system operating instruction for RHR, SOI-E12, was revised (revision 15 effective October 23, 2003) to include 1E12-F616B, the RHR BIC water-leg pump suction orifice instrument valve, in the RHR B/C venting instructions.
PY-CEI/NRR-2786L Enclosure Page 3 of 3 DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED The RHR "A" system, with the exception of the suppression pool cooling mode, was restored at 2002 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.61761e-4 months <br /> on August 15, 2003. LPCS was operable at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> on August 16, 2003. FWLCS and RHR "A" suppression pool cooling mode were restored September 11, 2003, following venting of the division 1 feedwater leakage control system piping and the LPCS/RHR "A" crossover piping. The revised procedures, SOl-E21 and SVI-E21-T1181, were made effective September 12, 2003. A subsequent revision, SOI-E21 revision 12 and SVI-E21-T1181 revision 6, provided instructions to vent for 3 to 5 minutes. The system operating instruction for RHR, SOI-E12, was revised (revision 15 effective October 23, 2003).
All required procedure changes are complete and current venting procedures are considered adequate.