U1R28 OCC Interactive Turnover Meeting Agenda
ML052030130
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/27/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030130 (5)


Text

NtEc Committed to Nuciear Exccftcnscc l-O BRnEY OFF

_W Lra IIII*1R2 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday, May 27, 2004 Start Time: 0600 NSB Cafeteri. a BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM) .-C eotv,-tCf LI)}/

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
a. Containment Fire Loading SAT / UNSAT -+ Review Deficiencies
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM) S~IB
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

- Site Communication

- Safety Snippet

- Outage Alara Report

- Outage Status Report

- Shutdown Safety Assessment

- Defined Critical Path

- Work Activity Risk Assignment

- Outage Schedule topi I

t.

Commined to 1ucicar X Point Beach Nuclear Plant U1R28 Refueling Outage r -- 'Safety Tpiceo week of May 23 -2,9 2004 ;; : *>...

Theme for the week This week's theme deals with odds and ends for Completing the Outage. We are almost done.

A number of critical work activities will be conducted this week in containment and we will begin a major battery change out It istime to review industry OE from other sites to make sure we've learned from their experiences. Nothing will stop our progress faster than a serious injuryl Daily Safety Snippets Sunday

  • 1s there an obstructionin your way that might not stay?'

OE13857 May 2002, Fort Calhoun -While moving the reactor vessel head assembly during a refueling outage, the control pendant for the polar crane caught a handrail vertical support pipe, lifting the pipe out of its mount and causing It to fall 20 ft to the walkway below. Individuals were in the area at the time, but not injured. A review Indicated the pendant caught on nearby equipment many times during past refueling outages and corrective actions were not put In place.

Are there any items were ourequiPment gets caught during moves that we have not resolved?

Monday The big picture do we see? And communication is the key.,

OE12357 January 2001, River Bend -A worker focused on a moving load and did not pay attention to the movement of the crane. He ended up being forced against a handrail by the cab of the crane, luckily resulting only Inminor Injuries.

The entire crew was focused on the load with no one person having oversight of the whole evolution.

During crane operations, do we designate en Individual to 'watch the bigp icture?

Tuesday "Peer checks - do we wse them?"

December 1997, Byron - An electrician was taken to the hospital for treatment of second-degree burns on his hand and' flash burns to his eyes as a result of a mishap. He was one of three electricians assisting a system engineer during a battery discharge test on a new battery bank when he accidentally shorted across the battery with one of the cables used to connect the battery to a resistor bank. An Investigation showed that the electricians and the system engineer had not verified the correct cable configuration. Also, the Injured electrician was not wearing low voltage gloves and had rolled up the sleeves of the long-sleeve shirt he was required to wear for this job.

What PPE do we wear during battery work?

Wednesday

,rust a reminder to be told, balance that Ioadr OE10902 March 2000, Seabrook - Electricians were offloading battery cells from a metal pallet on a forklift. The offload sequence went from inside, closest to the forklift, to the outside, furthest from IL The result - instability Inthe load and the pallet Upped under the weight of the batteries. The cells fractured spilling 19 gallons of sulfuric acid/water electrolyte In the switchgear room. This OE Isnot lust for battery removal. Balance all your oads!

Thursday "Wake sure the scaffold doesn't slip and come down too quick.

OE14551 July 2002, Davis-Besse - A diamond deck plate slipped through a gap between two pieces of floor grating and dropped 20 ft to the level below, damaging an instrument line. The rest of our scaffolding is coming down.

Are we aware of the potential 'holes for material to go through?

Friday "Before heat up, make sure someone has done the ciean-upl OE57698 April 2004, Palo Verde -Two mechanics received second degree burns to the face as the result of a flash fire that occurred as they began pre-heating for welding. Isopropyl alcohol was used to clean and liquid had accumulated In the casing of the equipment. The oncoming crew was not aware of this buildup as they began work.

Saturday "A/ways remember to verify first, or you may take a ride in a hearse. -

1992, Palisades - An experienced electrical technician at Palisades was electrocuted when he failed to install a circuit jumper before removing test equipment from a current transformer. The eidstng circuit configuration had not been anticipated during work planning, and the decision to use jumpers to maintain energized current transformer circuits during testing had not been reviewed by supervision.

U -

Point Beach Nuclear Plant Outage 1R28 Path Picture DAY 52 'N AP Meets Supporting Operational Excellence Outaqe Radiation Performance nnoan't Mont Pyradra I ' I 1

-S 3- _ * *- 6* 6--

This indicator measures cumulative dose radiation exposure and Uay 52 - May 2b Actual = 1.361 total number of personnel-contamination events (PCE's > 5000 Cumulative = 80.550 cpm) during refueling outages. The dose indicator is measured in Cumulative Forecast =82.610 Rem and individual PCE events.

Meets: <=92 Rem Actual Cum.

PCE #11, Found hot particle on modesty garment of Maintenance Exceeds: <=88 Rem Dose: 80.55 Rem worker that had been working in Ul cavity.

Meets: <= 18 Exceeds: <= 12 Actual PCE's: 11

. *, * - .g- B M Stu Thomas i Personnel Contamination Events Cumulative Dose Exposure 20 18 80

¢ 16 IZ 14 E

- Actual ---- Actual

% 12 C1 - - - - -Forecast a)6O4 .

E lo GO Goal 0 Goal 08 a040 C) i, 6 E

2 4 020 2

0 o

0 5 10 15 20 25 30 35 40 45 50 55 60 0

Committed to Nuclear E cellence P Outage Status Report Plant: Point Beach Unit I Day: Thursday Today's Date / Time: 5/27/04 0400 Outage Duration: Day Of Refueling Outage Number UIR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Near misses 0 Total for this outage I Summary:

Radiological Dose to date 80.550 Projected to date *82.610 Outage Goal 592 R Difference -2.060

  • Reforecast on 5/23 Number of PCEs 1I Summary: PCE #11, Found hot particle on modesty garment of Maintenance worker that had been working in Ul cavity.

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:

Plant Status- .

Mode: a Hot Standby (Mode 3) a Hot Shutdown (MAode (;

4)Q 7C Shutdown (Mode 5) ) 3 Refueling Shutdown (fMode 6)

RCS: Temperature:. 92 Pressure:' Vented to Atmosphere RVLevel:*. 70%

Time to Boil: m8iniutes Shutdown Safety Assessment Protected Equipment:

Major Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • Installed Reactor Head Bolts
  • Install Pressurizer Manway

. Coupled iPIB Reactor Coolant Pump

  • Install Reactor Head Insulation
  • Seal Table Restoration
  • Install Conoseals
  • Received Reactor Vessel Head Repair Approval
  • I & C Cavity Restoration
  • C dad Te sioning
  • Install Pressurizer Vent Flange e ModeS t3c .I?
  • Install Head Vent Spool Piece
  • I- iIaliT10 Removed From Containment
  • Containment Cleanup
  • Continued Containment Cleanup Significant Outstanding Issues Date Issue Due Responsibility 5/17/04 Rx Head Relief Request 5/26/04 Jim Schweitzer 5/20/04 D1051D106 Station Battery 5/27/04 Harv Hanneman Upcoming Major Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <200 0 4103104 2100 4103/04 2230 RCS Fill & VTent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4125/04 0900 Refueled 4114/04 0300 5/02/04 1848 Reactor Critical 4128/04 0800 _

RV Headset 4/18/04 1900 5/23/04 1338 On-Line 4/30/04 0100 A

- I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT
1 DATE: May 27, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:

COMMENTS:

  • Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency PBF-1562