ML032400064

From kanterella
Revision as of 09:43, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection/Activity Plan
ML032400064
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/27/2003
From:
Division Reactor Projects II
To:
Shared Package
ML032400059 List:
References
Download: ML032400064 (1)


Text

Page 1 of 1 Sequoyah 08/27/2003 07:46:43 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - IDENTIFICATION AND RESOLUTION OF PROBLEM 4 1, 2 IP 71152B Identification and Resolution of Problems 09/08/2003 09/12/2003 Baseline Inspections ISFSI - ISFSI CONSTRUCTION 1 1 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 09/15/2003 09/19/2003 Other Routine PI&R - IDENTIFICATION AND RESOLUTION OF PROBLEM 5 1, 2 IP 71152B Identification and Resolution of Problems 09/22/2003 09/26/2003 Baseline Inspections PS-SEC - SECURITY - PI&R 1 1, 2 IP 71152B Identification and Resolution of Problems 09/22/2003 09/26/2003 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification 10/06/2003 10/10/2003 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/13/2003 11/16/2003 Baseline Inspections S/G-ISI - S/G INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/23/2003 11/26/2003 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 01/05/2004 01/09/2004 Baseline Inspections PB6-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 02/09/2004 02/13/2004 Baseline Inspections ISFSI - ISFSI PREOP 1 1 IP 60854 Preoperational Testing Of An ISFSI 02/09/2004 02/13/2004 Other Routine 1 IP 60854 Preoperational Testing Of An ISFSI 02/23/2004 02/27/2004 Other Routine OL PREP - INITIAL EXAM PREP 2 1 V23215 SEQUOYAH/EXAMS AT POWER FACILITIES 05/17/2004 05/21/2004 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23215 SEQUOYAH/EXAMS AT POWER FACILITIES 06/07/2004 06/11/2004 Not Applicable OL EP - EP EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 06/21/2004 06/25/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/21/2004 06/25/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/21/2004 06/25/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/02/2004 08/06/2004 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/02/2004 08/06/2004 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/02/2004 08/06/2004 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 08/02/2004 08/06/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/02/2004 08/06/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.