MONTHYEARML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-02-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML18074A3642017-09-0707 September 2017 Draft Written Exam (Folder 2) ML18074A3652017-08-25025 August 2017 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML18074A3622017-06-27027 June 2017 Draft - Operating Outlines (Folder 2) ML18074A3632017-05-23023 May 2017 Draft - Written Outlines (Folder 2) ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17103A0402017-04-12012 April 2017 Senior Reactor and Reactor Operator Initial License Examinations - Millstone Power Station, Unit 3 ML17087A0862017-03-23023 March 2017 Final Qa/Related Forms (Folder 1) ML17087A0882017-03-10010 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17087A0872017-03-10010 March 2017 Miscellaneous (Folder 1) 2023-02-09
[Table view] |
See also: IR 05000336/2003302
Text
November 12, 2003
Mr. David A. Christian, Sr. Vice President
and Chief Nuclear Officer
Dominion Resources
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: MILLSTONE UNIT 2 SENIOR REACTOR OPERATOR INITIAL EXAMINATION
REPORT NO. 05000336/2003-302
Dear Mr. Christian:
This report transmits the results of the senior reactor operator (SRO) licensing examination
conducted by the NRC during the period of September 22-25, 2003 and of the post-examination
review during the period September 26 - October 8, 2003. This examination addressed areas
important to public health and safety and was developed and administered using the guidelines
of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, all six Senior Reactor Operator Upgrade applicants
passed all portions of the examination.
Mr. DAntonio discussed performance insights observed during the examination with members
of your staff on September 25, 2003. On October 10, 2003, final examination results, including
individual license numbers, were given during a telephone call between Mr. DAntonio and
Mr. Bob Cimmino.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). These records include the final examination and are available in ADAMS, RO/SRO
Written - Accession Number ML033140078; SRO/RO Operating Section A - Accession Number
ML033140099; SRO/RO Operating Section B - Accession Number ML033140103; and
SRO/RO Operating Section C - Accession Number ML033140118). ADAMS is accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading
Room).
Mr. David A. Christian 2
Should you have any questions regarding this examination, please contact me at (610) 337-
5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief
Operational Safety Branch
Division of Reactor Safety
Docket No. 50-336
License No. DPR-65
Enclosure: Initial Examination Report No. 05000336/2003-302
cc w/encl:
J. A. Price, Site Vice President - Millstone
C. L. Funderburk, Director, Nuclear Licensing and Operations Support
D. W. Dodson, Acting Manager - Licensing
L. M. Cuoco, Senior Counsel
V. Juliano, Waterford Library
S. Comley, We The People
J. Buckingham, Department of Public Utility Control
E. Wilds, Director, State of Connecticut SLO Designee
First Selectmen, Town of Waterford
D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN
J. M. Block, Attorney, CAN
G. Winslow, Citizens Regulatory Commission (CRC)
J. Markowicz, Co-Chair, NEAC
E. Woollacott, Co-Chair, NEAC
W. Meinert, Massachusetts Municipal Wholesale Electric Company
C. Brinkman, Manager, Washington Nuclear Operations
Mr. David A. Christian 3
Distribution w/encl: <VIA E-MAIL>:
Region I Docket Room (with concurrences)
S. Schneider, SRI - Millstone Unit 2 and Unit 3
H. Miller, ORA
J. Wiggins, ORA
T. Madden, OCA
J. Jolicoeur, OEDO
J. Clifford, NRR
R. Ennis, PM, NRR
G. Wunder, Backup PM, NRR
V. Nerses, PM, NRR
B. McDermott, RI
K. Jenison, RI
D. Screnci, PAO
J. White, INPO (whitejl@inpo.org)
J. DAntonio, Chief Examiner, DRS
C. Buracker, DRS
W. Lanning, DRS
R. Crlenjak, DRS
DRS Master Exam File
DRS OL Facility File
DRS File
DOCUMENT NAME: C:\MYFILES\Copies\MP2ExamReport.wpd ADAMS PKG: ML030420159
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRP R1/DRS/OSB
NAME CBuracker JDAntonio BMcDermott RJConte
DATE 11/03/03 11/10/03 11/10/03 11/ /03
OFFICIAL RECORD COPY
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket No: 50-336
License No: DPR-65
Report No: 05000336/2003-302
Licensee: Dominion Nuclear Connecticut
Facility: Millstone, Unit 2
Dates: September 22-25, 2003 (Operating Test Administration)
September 18, 2003 (Written Examination Administration)
October 8, 2003 (Licensee Post Exam Letter) Received
October 9, 2003
September 29 - October 9, 2003 (Examination Grading and
Evaluation)
Examiners: Joseph M. DAntonio, Operations Engineer (Chief Examiner)
John Caruso, Senior Operations Engineer
Approved by: Richard J. Conte, Chief
Operational Safety Branch
Division of Reactor Safety
Enclosure
SUMMARY OF FINDINGS
IR 05000336/2003-302; 09/18/03-09/25/03; Millstone, Unit 2; Initial Operator Licensing
Examination.
The written examinations were administered by the facility and the operating tests were
administered by two NRC region-based examiners. There were no inspection findings of
significance. The NRCs program for overseeing the safe operation of commercial nuclear
power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated
July 2000.
A. NRC-Identified and Self-Revealing Findings
Cornerstone: Mitigating Systems
All six Senior Reactor Operator Upgrade applicants passed their examinations.
There were no inspection findings of significance.
B. Licensee-Identified Violations
None
ii Enclosure
Report Details
1. REACTOR SAFETY
Mitigating Systems - Senior Reactor Operator (SRO) Initial License Examination
a. Scope of Review
The NRC examiners reviewed the facility developed written and operating initial
examinations and together with Millstone Unit 2 training and operations personnel
verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines
of Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors. A review was conducted in the Region I office and at the
Millstone 2 plant and training facility. Final resolution of comments and
incorporation of test revisions were conducted during and following the onsite
preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into
the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all
applicants during September 22-25, 2003. The written examination was administered
by the Millstone training staff on September 18, 2003. Final facility exam grading,
analysis, and comments were received by the NRC on October 9, 2003 as documented
by letter dated October 8, 2003.
b. Findings
Grading and Results
All six SRO applicants passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Enclosure
2
4OA6 Meetings, including Exit
The examination period was from September 18 to October 8, 2003, and it included
administration, grading, and review of licensee post exam documents. On
September 25, 2003, the NRC provided preliminary observations and comments to
Millstone 2 staff during an outbrief from the site. On October 10, 2003, examination
results and license numbers were provided to a Millstone 2 management representative
via telephone.
Enclosure
KEY POINTS OF CONTACT
Licensee Personnel
Mike Wilson, Manager of Nuclear Training
Trad Horner, Supervisor Nuclear Training
Bob Cimmino, Senior Instructor
NRC Personnel
Joseph DAntonio, Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
NONE
Attachment 1