April 2, 2007 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - RELIEF REQUEST NO. PRR-15 REV. 01, APPROVAL TO INCLUDE REMAINING REACTOR PRESSURE VESSEL (RPV) SAFE-END WELDS IN CONTINGENCY REPAIR PLAN FOR FULL STRUCTURAL WELD OVERLAYS (TAC NO. MD2663)
Dear Mr. Kansler:
By letter dated June 29, 2005 (Agencywide Documents and Management System (ADAMS)
Accession No. ML051920157), as supplemented by letter dated July 14, 2006 (ML062010210),
Entergy Nuclear Operations, Inc. (the licensee) submitted Relief Request PRR-15, Rev. 01, which added RPV safe-end welds under Table 1, to the welds subject to the contingency repair plan under Relief Request PRR-39, Rev. 02 (PRR-39), for the Pilgrim Nuclear Power Station (Pilgrim).
In its safety evaluation dated April 12, 2005 (ML050880137), the Nuclear Regulatory Commission (NRC) staff approved the contingency repair plan for specific welds in PRR-39, for the remaining service life of Pilgrim, 8 years from 2005 to 2012. By letter dated July 14, 2006, the licensee submitted its response to the staffs request for additional information dated May 11, 2006 (ML06120140). In letter dated July 14, 2006, the licensee stated that it had evaluated the changes in the code cases in Tables 1 and 2 of Regulatory Guide (RG) 1.147, Rev. 13 and 14, and confirmed that the code cases approved under PRR-39 did not change the design, fabrication, and testing of the overlay repair plan under PRR-39.
RG 1.147, Rev. 14 states that if a code case is implemented by a licensee and a later version of the code case is approved by the NRC staff and listed in Tables 1 and 2 during the licensees present 120-month inservice inspection (ISI) program interval, that licensee may use either the later version or the previous version. In addition to the above, the licensee is committing to using a repair plan approved by the staff under PRR-39 pursuant to 10 CFR 50.55a(a)(3)(i) for the additional RPV safe-end welds listed under PRR-15, Rev. 01 (see attached Background information).
Based on the information provided by the licensee, the NRC staff approves Relief Request PRR-15, Rev. 01, for the remainder of the fourth ISI interval, pursuant to 10 CFR 50.55a(a)(3)(i).
M. Kansler If you have any questions regarding this approval, please contact the Pilgrim Project Manager, James Kim, at 301-415-4125.
Sincerely,
/RA/
John P. Boska, Chief (Acting)
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page
BACKGROUND The NRC approved PRR-39, Rev. 2 (hereafter PRR-39) Contingency Repair Plan for use in the Third 10-Ten Year inservice inspection (ISI) interval, for use during succeeding 120 months from April 12, 2005 until the expiration of Pilgrim Operating License in 2012. The welds included in PRR-39 are identified in the table below and were selected for examination during Refueling Outage (RFO) 15, which was the last refueling outage in the Third 10-year interval.
RFO-15 took place in April and May of 2005.
Welds included in PRR-39, Rev. 2 Contingency Repair Plan WELD IDENTIFICATION DESCRIPTION SYSTEM 14-A-1 Safe-End to Nozzle Core Spray 14-B-1 Safe-End to Nozzle Core Spray 2R-N1B-1 Safe-End to Nozzle Recirculation 2R-N2D-1 Safe-End to Nozzle Recirculation 2R-N2E-1 Safe-End to Nozzle Recirculation 2R-N2F-1 Safe-End to Nozzle Recirculation 2R-N2G-1 Safe-End to Nozzle Recirculation 2R-N2J-1 Safe-End to Nozzle Recirculation 14-A-3 Pipe to Reducer Core Spray 14-B-3 Pipe to Reducer Core Spray 14-A-10A Valve to Pipe Core Spray 14-B-10A Valve to Pipe Core Spray The above PRR-39 welds included only those welds which were scheduled for inspection during RFO-15, but excluded all other reactor pressure vessel (RPV) safe-end to nozzle welds, because these RPV welds had already been inspected during the previous refueling outages within the Third 10-year ISI interval. The Contingency Repair Plan was to preclude exigent reviews if a weld flaw was identified. Pilgrim opted for NRC approval of a Contingency Repair Plan before the start of the RFO-15 for the PRR-39 welds that were scheduled for inspection during that outage.
By the relief request (PRR-15, Rev.01) dated June 29, 2005, the licensee requested NRC to include the remaining RPV safe-end welds identified in the table below in the Contingency Repair Plan for use within the 120-month duration that was approved by NRC on April 12, 2005.
These RPV safe-end welds fall within the material conditions, repair plan, and examination techniques already reviewed and approved by the NRC for PRR-39 with no material changes.
Attachment
RPV Safe-End to Nozzle Welds Included in PRR-15, Rev.01 WELD IDENTIFICATION DESCRIPTION SYSTEM 2R-N2A-1 Safe-End to Nozzle Reactor Pressure Vessel 2R-N2B-1 Safe-End to Nozzle Reactor Pressure Vessel 2R-N2C-1 Safe-End to Nozzle Reactor Pressure Vessel 2R-N2D-1 Safe-End to Nozzle Reactor Pressure Vessel 2R-N2H-1 Safe-End to Nozzle Reactor Pressure Vessel 2R-N2K-1 Safe-End to Nozzle Reactor Pressure Vessel RPV-N9B-1 Safe-End to Nozzle Reactor Pressure Vessel As stated in the NRC safety evaluation (SE), dated April 12, 2005, NRC approved the Contingency Repair Plan for the remaining service life of Pilgrim, 8 years from 2005 to 2012, since the current Operating License would expire on June 8, 2012, and the cumulative duration for the Contingency Repair Plan would remain in effect for less than 120 months. The licensee plans to inspect all of the welds contained in PRR-39 and PRR-15 within this 120-month period.
If flaws are identified, they will be corrected in accordance with the approved alternative Contingency Repair Plan.
NRC has approved up to 120 months for the applicability of approved 10 CFR 50.55a(a)(3)(i) relief request PRR-39 in transition from the Third to the Fourth ISI interval, limited by the expiration of Pilgrim's current Operating License in 2012. NRCs SE on PRR-39 dated April 12, 2005, is applicable in its entirety to PRR-15, Rev. 01, because the licensee will be using all the Code Cases previously approved by the NRC in the PRR-39 SE.
Therefore, inclusion of PRR-15, Rev 01. welds in the previously approved Contingency Repair Plan is acceptable because the Contingency Repair Plan remains valid and in effect.
Attachment
ML070590479 OFFICE LPLI-1/PM LPLI-1/LA CFEB/BC CPNB/BC OGC LPL1-1/BC (A)
NAME JKim SLittle KGruss TChan SUttal JBoska DATE 3/2/07 3/5/07 3/14/07 3/19/07 3/30/07 4/2/07 Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner Site Vice President Massachusetts Department of Entergy Nuclear Operations, Inc.
Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations, Inc.
Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A Mr. Bryan S. Ford 529 Main Street Manager, Licensing Charlestown, MA 02129 Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Pilgrim Nuclear Power Station cc:
Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Colomb Sr. VP and Chief Operating Officer Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Oscar Limpias Assistant General Counsel Vice President, Engineering Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Ms. Stacey Lousteau Mr. Christopher Schwarz Treasury Department Vice President, Operations Support Entergy Services, Inc.
Entergy Nuclear Operations, Inc. 639 Loyola Avenue 440 Hamilton Avenue New Orleans, LA 70113 White Plains, NY 10601 Mr. James Sniezek Mr. Michael Kansler 5486 Nithsdale Drive President Salisbury, MD 21801-2490 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Mr. Michael D. Lyster White Plains, NY 10601 5931 Barclay Lane Naples, FL 34110-7306 Mr. John F. McCann Director, Nuclear Safety Assurance Mr. Garrett D. Edwards Entergy Nuclear Operations, Inc. 814 Waverly Road 440 Hamilton Avenue Kennett Square, PA 19348 White Plains, NY 10601