MONTHYEARML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML23102A1552023-04-11011 April 2023 Core Operating Limits Report, 2 Cycle 32 Pattern Hoo, Revision 0 ML22306A2112022-11-0101 November 2022 Core Operating Limits Report, Surry 1 Cycle 32 Pattern Sjk Revision 0 ML22306A2192022-11-0101 November 2022 Core Operating Limits Report - Surry 2 Cycle 31 Pattern Msk Revision 2 ML22179A2782022-06-27027 June 2022 Core Operating Limits Report, Cycle 31 Pattern Msk Revision 1 ML21307A4282021-11-0303 November 2021 Core Operating Limits Report Cycle 31 Pattern Msk Revision 0 ML21144A0832021-05-18018 May 2021 Core Operating Report Surry 2 Cycle 30 Operating Pattern Syk Revision 1 ML21140A3922021-05-18018 May 2021 Core Operating Limits Report - Surry 1 Cycle 31 Pattern Rna Revision 0 ML20140A1612020-05-12012 May 2020 Core Operating Limits Report: Surry 2 Cycle 30, Pattern Syk, Revision 0 ML19317D4602019-11-0707 November 2019 Core Operating Limits Report; Surry 1 Cycle 30 Pattern Apo Revision 0 ML18302A1222018-10-22022 October 2018 Core Operation Limits Report, Surry 2 Cycle 29 Pattern Sup, Revision 0 ML18128A1952018-05-0101 May 2018 Core Operating Limits Report Cycle 29 Pattern Zeu, Revision 0 ML17163A1772017-06-0606 June 2017 Core Operating Limits Report, Cycle 28 Pattern PRI, Revision 0 ML16312A0632016-11-0202 November 2016 Core Operating Limits Report for Cycle 28 Pattern APT, Revision 0 ML16112A2512016-03-0707 March 2016 Re Cycle 27 Startup Physics Tests Report ML16042A4032016-02-0404 February 2016 Core Operating Limits Report, Cycle 27 Pattern Hgg, Revision 2 ML15345A2422015-12-0808 December 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 2 Core Operating Limits Report Surry 2 Cycle 27 Pattern Hgg Revision 1 ML14119A1862014-04-23023 April 2014 Core Operating Limits Report Cycle 26 Pattern Eba Revision 0 ML13308B9062013-10-28028 October 2013 Core Operating Limits Report, Surry 1 Cycle 26 Pattern Apx Revision 0 ML12312A0652012-10-30030 October 2012 Submittal of Core Operating Limits Report (Colr), Cycle 25 Pattern Who, Revision 0 ML12143A1412012-05-16016 May 2012 Core Operating Limits Report Surry 1 Cycle 25 Pattern Gnu Revision 0 ML1123605802011-08-24024 August 2011 Cycle 24 Pattern Upg Revision 1 ML1123605152011-08-24024 August 2011 Core Operating Limits Report, Cycle 24 Pattern Owl Revision 1 ML1110404212011-04-14014 April 2011 Cycle 24 Core Operating Limits Report, Revision 0 ML11306A0242011-02-14014 February 2011 Cycle 24 Startup Physics Tests Report ML1035501802010-12-20020 December 2010 Cycle 23 Core Operating Limits Report, Revision 2 ML1031905152010-11-12012 November 2010 Cycle 24 Core Operating Limits Report, Revision 0 ML0931700222009-11-12012 November 2009 Cycle 23 Core Operating Limits Report Revision 0 ML0924005442009-08-27027 August 2009 Cycle 22 Core Operating Limits Report, Revision 2 ML0924004262009-08-27027 August 2009 Surrey, Unit 1 - Cycle 23 Core Operating Limits Report, Revision 1 ML0916603562009-06-15015 June 2009 Cycle 22 Core Operating Limits Report, Revision 1 ML0911306312009-04-23023 April 2009 Cycle 23 Core Operating Limits Report ML0810802542008-04-17017 April 2008 Cycle 22 Core Operating Limits Report ML0734103472007-12-0505 December 2007 Cycle 22 Core Operating Limits Reports ML0734005282007-12-0505 December 2007 Cycle 21 Core Operating Limits Report ML0721904822007-07-31031 July 2007 Proposed Technical Specifications Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Supplemental Information ML0632101302006-11-16016 November 2006 Cycle 21 Core Operating Limits Report ML0613504262006-05-15015 May 2006 Virginia Electric and Power Company Surry Power Station Unit 1 Revision to Cycle 21 Core Operating Limits Report ML0611802292006-04-28028 April 2006 Cycle 21 Core Operating Limits Report ML0515902922005-05-31031 May 2005 Cycle 20 Core Operating Limits Report ML0434402752004-12-0909 December 2004 Transmittal of Cycle 20 Core Operating Limits Report ML0333003342003-11-17017 November 2003 Cycle 19 Core Operating Limits Report, Revision 0 ML0330104502003-10-20020 October 2003 Cycle 19, Revision 1 to Core Operating Limits Report ML0316009722003-05-21021 May 2003 Cycle 19 Core Operating Limits Report 2024-05-13
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 23, 2009 U. S. Nuclear Regulatory Commission Serial No.09-269 Attention: Document Control Desk NLOSlvlh Washington, D. C. 20555-0001 Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNIT 1 CYCLE 23 CORE OPERATING LIMITS REPORT Pursuant to Surry Technical Specification 6.2.C, enclosed is a copy of Dominion's Core Operating Limits Report (COLR) for Surry Unit 1 Cycle 23 Pattern NXS, Revision O.
If you have any questions or require additional information, please contact Mr. Gary Miller at (804) 273-2771.
Sincerely,
/~--
(C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Virginia Electric and Power Company Enclosure Commitment Summary: There are no new commitments as a result of this letter.
Serial No.09-269 Cycle 23 Core Operating Limits Report Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S. W.
Suite 23T85 Atlanta, GA 30303-8931 Mr. J. F. Stang, Jr.
NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 MS. D. N. Wright NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 H4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station
COLR-SIC23, Revision 0 CORE OPERATING LIMITS REPORT Surry 1 Cycle 23 Pattern NXS COLR-SIC23, Rev. a Page 1 of 6
1.0 INTRODUCTION
This Core Operating Limits Report (COLR) for Surry Unit 1 Cycle 23 has been prepared in accordance with the requirements of Technical Specification 6.2.C.
The Technical Specifications affected by this report are:
TS 3.1.E - Moderator Temperature Coefficient TS 3.12.A.2 and TS 3.12.A.3 - Control Bank Insertion Limits TS 3.12.B.l and TS 3.12.B.2 - Power Distribution Limits
2.0 REFERENCES
- 1. VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003 (Methodology for TS 3.1.E - Moderator Temperature Coefficient; TS 3.12.A.2 and 3.12.A.3 -
Control Bank Insertion Limit; TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor and Nuclear Enthalpy Rise Hot Channel Factor) 2a. WCAP-16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," (Westinghouse Proprietary), January 2005 (Methodology for TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2b. WCAP-I0054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985 (W Proprietary)
(Methodology for TS 3.12.B.I and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2c. WCAP-I0079-P-A, "NOTRUMP, A Nodal Transient Small Break and General Network Code," August 1985 (W Proprietary)
(Methodology for TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 2d. WCAP-12610, "VANTAGE+ Fuel Assembly Report," June 1990 (Westinghouse Proprietary)
(Methodology for TS 3.12.B.l and TS 3.12.B.2 - Heat Flux Hot Channel Factor) 3a. VEP-NE-2-A, "Statistical DNBR Evaluation Methodology," June 1987 (Methodology for TS 3.12.B.l and TS 3.12.B.2 - Nuclear Enthalpy Rise Hot Channel Factor) 3b. VEP-NE-3-A, "Qualification of the WRB-l CHF Correlation in the Virginia Power COBRA Code," July 1990 (Methodology for TS 3.12.B.l and TS 3.12.B.2 - Nuclear Enthalpy Rise Hot Channel Factor)
COLR-SIC23, Rev. 0 Page 2 of6
3.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.2.C.
3.1 Moderator Temperature Coefficient (TS 3.1.E) 3.1.1 The Moderator Temperature Coefficient (MTC) limits are:
+6.0 pcrnfF at less than 50 percent of RATED POWER, and
+6.0 pcm/T' at 50 percent of RATED POWER and linearly decreasing to a pcmfF at RATED POWER 3.2 Control Bank Insertion Limits (TS 3.I2.A.2) 3.2.1 The control rod banks shall be limited in physical insertion as shown in Figure A-I.
3.2.2 The rod insertion limit for the A and B control banks is the fully withdrawn position as shown on Figure A-I.
COLR-SIC23, Rev. a Page 3 of6
3.3 Heat Flux Hot Channel Factor-FQ(z) (TS 3.12.B.1)
CFQ FQ(z) ~ --K(z) for P > 0.5 P
CFQ FQ(z) s --K(z) for P s 0.5
0.5 where
P = Thermal Power Rated Power 3.3.1 CFQ = 2.32 3.3.2 K(z) is provided in Figure A-2.
3.4 Nuclear Enthalpy Rise Hot Channel Factor-FAII(N) (TS 3.12.B.1)
FM!(N) s CFDH x{l+PFDH(l-P)}
Thermal Power were:
h P = -----
Rated Power 3.4.1 CFDH = 1.56 for Surry Improved Fuel (SIP) 3.4.2 PFDH = 0.3 COLR-SIC23, Rev. 0 Page 4 of6
Figure A-I SURRY UNIT 1 CYCLE 23 ROD GROUP INSERTION LIMITS Fully wid position = 228 steps 230 220 / (0.4813, 228)
V 210 ./
200 /
190 / C-BANK 180 ~
V (1.0, 183)
~
170 / /
/
~
/r 160 150 / V 1J
~lfJ 140 Q.
(0, 151)
~
/
Gl iii 130 ./
~
g 120 /
'iii
~ 110
/
Q.
- J 100 ~
/
e e
1J o
90 r
/ D-BANK II:
80 /
70
/
60 V
/
50 ./
40 /
30 /
20 /(0,23) 10 o
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power COLR-SIC23, Rev. 0 Page 5 of6
Figure A-2 K(Z) - Normalized FQ as a Function of Core Height 1.2 1.1 6,1.0 1.0 r--- t---
r--- r--
0.9 (12 0.925 0.8 N
~ 0.7 c
w N
- i c( 0.6
- iE a:
oz
..:... 0.5 N
~
0.4 0.3 ---
0.2 0.1 0.0 o 2 3 4 5 6 7 8 9 10 11 12 13 CORE HEIGHT (FT)
COLR-SIC23, Rev. 0 Page 60f6