Similar Documents at Surry |
---|
Category:Fuel Cycle Reload Report
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML23102A1552023-04-11011 April 2023 Core Operating Limits Report, 2 Cycle 32 Pattern Hoo, Revision 0 ML22306A2112022-11-0101 November 2022 Core Operating Limits Report, Surry 1 Cycle 32 Pattern Sjk Revision 0 ML22306A2192022-11-0101 November 2022 Core Operating Limits Report - Surry 2 Cycle 31 Pattern Msk Revision 2 ML22179A2782022-06-27027 June 2022 Core Operating Limits Report, Cycle 31 Pattern Msk Revision 1 ML21307A4282021-11-0303 November 2021 Core Operating Limits Report Cycle 31 Pattern Msk Revision 0 ML21144A0832021-05-18018 May 2021 Core Operating Report Surry 2 Cycle 30 Operating Pattern Syk Revision 1 ML21140A3922021-05-18018 May 2021 Core Operating Limits Report - Surry 1 Cycle 31 Pattern Rna Revision 0 ML20140A1612020-05-12012 May 2020 Core Operating Limits Report: Surry 2 Cycle 30, Pattern Syk, Revision 0 ML19317D4602019-11-0707 November 2019 Core Operating Limits Report; Surry 1 Cycle 30 Pattern Apo Revision 0 ML18302A1222018-10-22022 October 2018 Core Operation Limits Report, Surry 2 Cycle 29 Pattern Sup, Revision 0 ML18128A1952018-05-0101 May 2018 Core Operating Limits Report Cycle 29 Pattern Zeu, Revision 0 ML17163A1772017-06-0606 June 2017 Core Operating Limits Report, Cycle 28 Pattern PRI, Revision 0 ML16312A0632016-11-0202 November 2016 Core Operating Limits Report for Cycle 28 Pattern APT, Revision 0 ML16112A2512016-03-0707 March 2016 Re Cycle 27 Startup Physics Tests Report ML16042A4032016-02-0404 February 2016 Core Operating Limits Report, Cycle 27 Pattern Hgg, Revision 2 ML15345A2422015-12-0808 December 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 2 Core Operating Limits Report Surry 2 Cycle 27 Pattern Hgg Revision 1 ML14119A1862014-04-23023 April 2014 Core Operating Limits Report Cycle 26 Pattern Eba Revision 0 ML13308B9062013-10-28028 October 2013 Core Operating Limits Report, Surry 1 Cycle 26 Pattern Apx Revision 0 ML12312A0652012-10-30030 October 2012 Submittal of Core Operating Limits Report (Colr), Cycle 25 Pattern Who, Revision 0 ML12143A1412012-05-16016 May 2012 Core Operating Limits Report Surry 1 Cycle 25 Pattern Gnu Revision 0 ML1123605802011-08-24024 August 2011 Cycle 24 Pattern Upg Revision 1 ML1123605152011-08-24024 August 2011 Core Operating Limits Report, Cycle 24 Pattern Owl Revision 1 ML1110404212011-04-14014 April 2011 Cycle 24 Core Operating Limits Report, Revision 0 ML11306A0242011-02-14014 February 2011 Cycle 24 Startup Physics Tests Report ML1035501802010-12-20020 December 2010 Cycle 23 Core Operating Limits Report, Revision 2 ML1031905152010-11-12012 November 2010 Cycle 24 Core Operating Limits Report, Revision 0 ML0931700222009-11-12012 November 2009 Cycle 23 Core Operating Limits Report Revision 0 ML0924005442009-08-27027 August 2009 Cycle 22 Core Operating Limits Report, Revision 2 ML0924004262009-08-27027 August 2009 Surrey, Unit 1 - Cycle 23 Core Operating Limits Report, Revision 1 ML0916603562009-06-15015 June 2009 Cycle 22 Core Operating Limits Report, Revision 1 ML0911306312009-04-23023 April 2009 Cycle 23 Core Operating Limits Report ML0810802542008-04-17017 April 2008 Cycle 22 Core Operating Limits Report ML0734103472007-12-0505 December 2007 Cycle 22 Core Operating Limits Reports ML0734005282007-12-0505 December 2007 Cycle 21 Core Operating Limits Report ML0721904822007-07-31031 July 2007 Proposed Technical Specifications Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Supplemental Information ML0632101302006-11-16016 November 2006 Cycle 21 Core Operating Limits Report ML0613504262006-05-15015 May 2006 Virginia Electric and Power Company Surry Power Station Unit 1 Revision to Cycle 21 Core Operating Limits Report ML0611802292006-04-28028 April 2006 Cycle 21 Core Operating Limits Report ML0515902922005-05-31031 May 2005 Cycle 20 Core Operating Limits Report ML0434402752004-12-0909 December 2004 Transmittal of Cycle 20 Core Operating Limits Report ML0333003342003-11-17017 November 2003 Cycle 19 Core Operating Limits Report, Revision 0 ML0330104502003-10-20020 October 2003 Cycle 19, Revision 1 to Core Operating Limits Report ML0316009722003-05-21021 May 2003 Cycle 19 Core Operating Limits Report 2024-05-13
[Table view] Category:Letter
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] |
Text
3. 2. 1. 2.0 The the This 1.0 Safety by EMF-2328(P)(A), Statistical WCAP-16009-P-A, VEP-FRD-42, REFERENCES Technical requirements Core INTRODUCTION TS Methodology ANP-3676P, TS Methodology TS TS TS Methodology Nuclear TS Evaluation TS Channel TS TS TS TS TS TS TS TS TS TS TS Operating 3.12.B.1 3.12.B.1 Treatment Table 3.12.F 3.12.B.1 3.12.A.l.a, 3.12.A.1, 3.1.E 2.1 Table 3.12.F-DNB 3.12.B.1 3.12.A.l.a, 3.12.A.1, TS 3.1.E 2.3.A.2.e-Overpower 2.3.A.2.d-Overtemperature 2.1 Specifications Factor -Moderator -Safety Rev. Enthalpy -Moderator -Safety of "Surry 4.1-2A- -DNB 4.1-2A-Surry Limits and for: Report "PWR and for: and TS for: 2.2-A, and TS TS of "Realistic TS TS 3.12.A.2, Limit, TS 3.12.A.2, Limit, Technical dated Fuel-Vendor Uncertainty Minimum Parameters 3.12.A.2.a, Minimum Parameters Rise TS 3.12.A.2.a, affected Report SURRY 3.12.B.2 Small 3.12.B.2 3.12.B.2 Temperature "Reload 3.12.B.2 Temperature Reactor CORE March Reactor Hot (COLR)
Break Large TS Channel TS AT by Specification
-Heat -Heat Method Frequency -Heat TS 3.12.A.3 Nuclear Frequency TS 3.12.A.3 this UNIT 2 OPERATING 19, Independent Break Core -Power AT Core 2021. LOCA 3.12.A.3.c Coefficient 3.12.A.3.c Coefficient report for ATTACHMENT Page Flux Flux (ASTRUM)," Flux Design Factor) Surry CYCLE Evaluation LOCA and for Distribution and are: 6.2.C.
Hot Hot for Hot TS 1 of7 Small Equipment and TS Methodology," Equipment and Unit LIMITS Channel Channel Evaluation Channel 3.12.C.3.b.l(b)- 3.12.C.3.b.l(b)- 31, Break TS TS 2 Cycle PATTERN Model, (Westinghouse 3.12.G-Shutdown Limits 3.12.G-Shutdown Factor Factor Tests: Factor Tests: REPORT LOCA Methodology 31 S-RELAP5 and October (Heat has Analysis," Item Control Item Control been MSK Proprietary), 22 Nuclear 22 Flux
-RCS 2017. -RCS Bank prepared Based," Using Margin Bank Hot Margin Docket as Enthalpy Serial approved Flow Insertion Flow Channel Insertion in COLR as January the accordance No. No.
supplemented Rise S2C31 50-281 21-369 Automated Factor Limits by 2005. Hot Limit NRC with and
Where: 3.2 The 3.1 specified following The 3.0 Overtemperature Reactor Safety cycle-specific OPERATING t1 ~9.
respectively, Where f(Al) P' P is the T' Tis sis ATo AT Limit, in subsections.
7 seconds is the is Core Technical the the the is the is measured qt and ~ measured Laplace Safety Reactor 0.0188 0, 0.0268 nominal nominal measured indicated parameter LIMITS and AT Limits Specification These qb when-24.0% (TS Core qt + are {(qt {-24 RCS pressurizer Tavg transform RCS percent RCS AT 2.3.A.2.d) are limits limits qb -qb)- -( qt -qb)}, operating at AT, presented (TS is the 12 RATED average at 2.1) 6.2.C
- 'A.4 operator, RATED P. 0 for RA 8.0}, RATED POWER pressure, have total TED seconds pressure temperature in and the THERMAL POWER, sec-POWER, Figure repeated been specifications Page POWER when when psig.. 1 developed 3 of7 (qt- ( qt -qb) ~235 A-1.
- 573.0°F. (Tavg), in 0
POWER in qb) ::;;(qt P. Section the > +8.0% < -24.0% psig. listed upper -qb) K3 P. 0 using 2.0.
in and ::;;+8.0% ~0.000765 the in percent RATED RA Section lower TED NRC-approved RA halves POWER RATED /psig 1.0 TED POWER