MONTHYEARML20217D6351999-10-0808 October 1999 Proposed Tech Specs Sections 3/4.4.9 & B 3/4.4.9,revising Heatup & Cooldown Curves ML20211C2141999-08-19019 August 1999 Proposed Tech Specs,Revising Heatup & Cooldown Curves in TS 3/4.4.9, RCS P/T Limits ML20206T2141999-05-17017 May 1999 Proposed Tech Specs Section 3.7.1.3, CST - LCO, Revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water ML20197H5521998-12-0404 December 1998 Proposed Tech Specs Revising Testing Methodology Used by Vcns to Determine Operability of Charcoal Adsorber in ESF Air Handling Units ML20153C4001998-09-18018 September 1998 Proposed Tech Specs Incorporating W Beacon TR WCAP-12472-P-A to Augment Functionality of Flux Mapping Sys When Thermal Power Is Greater than 25% RTP ML20236G7581998-07-0101 July 1998 Proposed Tech Specs 4.7.7.e,removing Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months ML20202G6891998-02-0909 February 1998 Proposed Tech Specs Requesting Removal of Table 4.8-1, Diesel Generator Test Schedule & SR 4.8.1.1.3,Repts ML20141K2481997-05-21021 May 1997 Proposed Tech Specs Revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Emergency Safeguards Features Air Handling Units ML20140C0641997-03-26026 March 1997 Proposed Tech Specs 3.8.1.1 Re AC Sources - Operating ML20140C1401997-03-26026 March 1997 Proposed Tech Specs Re Change to Core Alteration Definition ML20140C1071997-03-26026 March 1997 Proposed Tech Specs Re ECCS Charging/Hhsi Pump Cross Connect & mini-flow Header Isolation Motor Operated Valves ML20107G3511996-04-16016 April 1996 Proposed Tech Specs 3/4.6 Re Containment Sys,Per App J, Option B ML20101E6461996-03-19019 March 1996 Proposed Tech Specs,Consisting of Change Request 95-03, Enhancing LCO & SRs & Revises Bases for QPTR ML20097F4721996-02-10010 February 1996 Proposed Tech Specs,Revising Testing Methodology Utilized to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20095E6541995-12-0808 December 1995 Proposed Tech Specs,Consisting of Change Request 95-07 Re ECCS Pump Testing ML20095A8061995-12-0404 December 1995 Proposed Tech Specs,Incorporating Revs to 10CFR20 Correction of Bases 3/4 11-1 ML20094N8881995-11-21021 November 1995 Proposed Tech Specs,Allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days ML20094L3531995-11-14014 November 1995 Proposed TS 3/4.8.4.2,removing MOVs Thermal Overload Protection & Bypass Devices ML20094E4111995-11-0101 November 1995 Proposed Tech Specs,Consisting of Change Request 95-01, Permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage ML20092A2371995-08-31031 August 1995 Proposed Tech Specs,Consisting of Change Request TSP 940002, Incorporating Revs to 10CFR20 ML20091L4541995-08-18018 August 1995 Proposed Tech Specs for Uprate Power Operation ML20087F8551995-08-11011 August 1995 Proposed Tech Specs Re Rev to TS Change 95-02 Concerning PORVs & Block Valves ML20087A2601995-07-28028 July 1995 Proposed Tech Specs Re TS 3/4.3.2,ESFAS Instrumentation,Sr 4.3.2.1 Being Revised to Exclude Requirement to Perform Slave Relay Test of 36 Containment Purge Supply & Exhaust Valves on Quarterly Basis While Plant in Modes 1,2,3 or 4 ML20086C0311995-06-30030 June 1995 Proposed Tech Specs Re PORVs & Block Valves ML20085K4591995-06-19019 June 1995 Proposed TS 3/4.6.2, Depressurization & Cooling Sys, Changing Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs ML20085L0411995-06-19019 June 1995 Proposed Tech Specs Re Deletion of Schedular Requirements for Type a Testing ML20080K1981995-02-21021 February 1995 Proposed Tech Specs,Incorporating Revs to 10CFR20 ML20078G9231995-01-30030 January 1995 Proposed Tech Specs Re Relocation of Seismic Monitoring Instrumentation ML20078B6121994-10-20020 October 1994 Proposed TS Page,Incorporating Approved Amend 116 & Requested SR Replacement TS Change ML20076J6691994-10-17017 October 1994 Proposed Tech Specs,Reflecting Relocation of Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document ML20073D4111994-09-20020 September 1994 Proposed TS Pages,Including Page 6-16a,revising Rev Level & Date of WCAP-10216-P-A to Reflect Updated Methodology Used in Determining Plant Core Operating Limits ML20149G1301994-09-20020 September 1994 Proposed TS 3/4 5-6 Re Charging Pump Runout Flow Limit ML20071K3761994-07-22022 July 1994 Proposed TS Page 3/4 3-56,reflecting Required Action to Restore One Inoperable Hydrogen Monitor Channel to Operable Status,W/Less than Min Number of Channels Operable ML20070J7561994-07-20020 July 1994 Proposed Tech Specs,Permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A,that Will Be Used to Determine Core Operating Limits for Future Cycles ML20070J7881994-07-20020 July 1994 Proposed TS Pages for TS Tables 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints & 3.3-4, ESFAS Instrumentation Trip Setpoints ML20065B8361994-03-25025 March 1994 Proposed Tech Specs Pages for Missing Page Numbers of TS Pages Submitted in ML20064H9591994-03-11011 March 1994 Proposed TS 4.8.4.1.a.3,deleting Fuses Used as Penetration Overcurrent Protection Devices from SRs & from Bases B 3/4.8.4 ML20064H9251994-03-11011 March 1994 Proposed Tech Specs 3/4.4.9.3,changing AOT for RHR Suction Relief Valves from 7 Days to 72 H ML20064H4501994-03-11011 March 1994 Proposed Tech Specs Re Steam Generator Replacement ML20064G5541994-03-11011 March 1994 Proposed Tech Specs Re Limiting Safety Sys Settings for Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint ML20064C6421994-02-25025 February 1994 Proposed Tech Specs,Incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather That Semiannually ML20062K6321993-12-13013 December 1993 Proposed Tech Spec Figures 3.9-1 & 3.9-2,permitting Storage of Fuel Assemblies in Regions 2 & 3 of Spent Fuel Storage Racks,Respectively ML20059G2901993-10-29029 October 1993 Proposed Tech Specs Supporting SG Replacement ML20056F7951993-08-24024 August 1993 Proposed Revised TS Re Emergency Feedwater Per 10CFR50.59 ML20045F7771993-06-30030 June 1993 Proposed Tech Specs SR 4.7.1.2 for Performance of Turbine Driven EFW Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig ML20045C3441993-06-16016 June 1993 Proposed Tech Spec 4.7.1.2.a.2 Supporting Request to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig ML20044G7551993-05-25025 May 1993 Proposed Tech Specs Revising Page 3/4 7-4,re Changing TS 4.7.1.2.a.2,to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psi ML20128H9781993-02-12012 February 1993 Proposed TS Modifying Insp Requirements of TS 3/4.4.5 Re SGs & LCO for 3/4.4.6.2 Re Operational Leakage to Establish Interim Plugging Criteria ML20128K1821993-02-10010 February 1993 Proposed Tech Specs Re Main Steam Safety Valves 1999-08-19
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217D6351999-10-0808 October 1999 Proposed Tech Specs Sections 3/4.4.9 & B 3/4.4.9,revising Heatup & Cooldown Curves ML20211C2141999-08-19019 August 1999 Proposed Tech Specs,Revising Heatup & Cooldown Curves in TS 3/4.4.9, RCS P/T Limits ML20206T2141999-05-17017 May 1999 Proposed Tech Specs Section 3.7.1.3, CST - LCO, Revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water ML20212H4651999-05-0404 May 1999 Amend 17 to Training & Qualification Plan ML20197H5521998-12-0404 December 1998 Proposed Tech Specs Revising Testing Methodology Used by Vcns to Determine Operability of Charcoal Adsorber in ESF Air Handling Units ML20153C4001998-09-18018 September 1998 Proposed Tech Specs Incorporating W Beacon TR WCAP-12472-P-A to Augment Functionality of Flux Mapping Sys When Thermal Power Is Greater than 25% RTP ML20202C3271998-08-31031 August 1998 Amend 16 to Training & Qualification Plan ML20236G7581998-07-0101 July 1998 Proposed Tech Specs 4.7.7.e,removing Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months ML20153F9241998-04-23023 April 1998 Change A,Rev 10 to FEP-1.0, Fire Emergency Procedure Selection ML20153G7081998-03-30030 March 1998 Rev 2 to FEP-4.1, Plant Shutdown from Hot Standby to Cold Shutdown Due to Fire in Control Building ML20153F9691998-03-25025 March 1998 Rev 3 to FEP-3.1, Train B Plant Shutdown from Hot Standby to Cold Shutdown Due to Fire ML20153F9341998-03-23023 March 1998 Rev 3 to FEP-2.0, Train a Plant Shutdown to Hot Standby Due to Fire ML20202G6891998-02-0909 February 1998 Proposed Tech Specs Requesting Removal of Table 4.8-1, Diesel Generator Test Schedule & SR 4.8.1.1.3,Repts ML20203H5741998-02-0505 February 1998 Rev 31,change C to EPP-002, Communication & Notification ML20203H5981998-02-0202 February 1998 Rev 3 to EPP-105, Conduct of Drills & Exercises ML20203H5831998-01-27027 January 1998 Rev 5 to EPP-103, Emergency Equipment Checklist ML20153F9461997-10-22022 October 1997 Rev 2 to FEP-2.1, Train a Shutdown from Hot Standby to Cold Shutdown Due to Fire, Change B ML20153F9511997-10-22022 October 1997 Rev 2 to FEP-3.0, Train B Plant Shutdown to Hot Standby Due to Fire, Change B ML20153F9931997-10-22022 October 1997 Rev 2 to FEP-4.0, Control Room Evacuation Due to Fire, Change D ML20210V2481997-06-30030 June 1997 Amend 15 to Training & Qualification Plan ML20217H3521997-06-16016 June 1997 Amend 14 to, Training & Qualification Plan ML20141K2481997-05-21021 May 1997 Proposed Tech Specs Revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Emergency Safeguards Features Air Handling Units ML20140C1071997-03-26026 March 1997 Proposed Tech Specs Re ECCS Charging/Hhsi Pump Cross Connect & mini-flow Header Isolation Motor Operated Valves ML20140C1401997-03-26026 March 1997 Proposed Tech Specs Re Change to Core Alteration Definition ML20140C0641997-03-26026 March 1997 Proposed Tech Specs 3.8.1.1 Re AC Sources - Operating ML20137F8501997-02-0404 February 1997 Change E,Rev 7 to Inservice Testing of Pumps Second Ten Year Interval RC-96-0229, Startup Report for VC Summer Nuclear Station Power Uprate1996-09-23023 September 1996 Startup Report for VC Summer Nuclear Station Power Uprate ML20138H7191996-09-0606 September 1996 Rev 22 to ODCM for VC Summer Nuclear Station ML20134J9741996-06-0505 June 1996 V C Summer Fuel Assembly Insp Program ML20107G3511996-04-16016 April 1996 Proposed Tech Specs 3/4.6 Re Containment Sys,Per App J, Option B ML20138H7141996-03-25025 March 1996 Rev 21 to ODCM for VC Summer Nuclear Station ML20101E6461996-03-19019 March 1996 Proposed Tech Specs,Consisting of Change Request 95-03, Enhancing LCO & SRs & Revises Bases for QPTR ML20097F4721996-02-10010 February 1996 Proposed Tech Specs,Revising Testing Methodology Utilized to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20095E6541995-12-0808 December 1995 Proposed Tech Specs,Consisting of Change Request 95-07 Re ECCS Pump Testing ML20095A8061995-12-0404 December 1995 Proposed Tech Specs,Incorporating Revs to 10CFR20 Correction of Bases 3/4 11-1 ML20094N8881995-11-21021 November 1995 Proposed Tech Specs,Allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days ML20094L3531995-11-14014 November 1995 Proposed TS 3/4.8.4.2,removing MOVs Thermal Overload Protection & Bypass Devices ML20094E4111995-11-0101 November 1995 Proposed Tech Specs,Consisting of Change Request 95-01, Permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage ML20093F6131995-08-31031 August 1995 Rev 7 to General Test Procedure (Gtp) GTP-301, IST of Pumps Second Ten Yr Interval ML20092A2371995-08-31031 August 1995 Proposed Tech Specs,Consisting of Change Request TSP 940002, Incorporating Revs to 10CFR20 ML20091L4541995-08-18018 August 1995 Proposed Tech Specs for Uprate Power Operation ML20087F8551995-08-11011 August 1995 Proposed Tech Specs Re Rev to TS Change 95-02 Concerning PORVs & Block Valves ML20087A2601995-07-28028 July 1995 Proposed Tech Specs Re TS 3/4.3.2,ESFAS Instrumentation,Sr 4.3.2.1 Being Revised to Exclude Requirement to Perform Slave Relay Test of 36 Containment Purge Supply & Exhaust Valves on Quarterly Basis While Plant in Modes 1,2,3 or 4 ML20086C0311995-06-30030 June 1995 Proposed Tech Specs Re PORVs & Block Valves ML20085L0411995-06-19019 June 1995 Proposed Tech Specs Re Deletion of Schedular Requirements for Type a Testing ML20085K4591995-06-19019 June 1995 Proposed TS 3/4.6.2, Depressurization & Cooling Sys, Changing Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs ML20080K1981995-02-21021 February 1995 Proposed Tech Specs,Incorporating Revs to 10CFR20 ML20107L8771995-01-31031 January 1995 Rev 19 to Offsite Dose Calculation Manual ML20078G9231995-01-30030 January 1995 Proposed Tech Specs Re Relocation of Seismic Monitoring Instrumentation 1999-08-19
[Table view] |
Text
-
i I
l Enclosure 1 to Document Control Desk letter i TSP 930009 Page 1 of 1 l PROPOSED TECHNICAL SPECIFICATION CHANGE - TSP 930009 ;
VIRGIL C. SUMMER NUCLEAR STATION LIST OF AFFECTED PAGES AND DESCRIPTION OF CHANGES i i
Page Specification Description of Change >
3/4 7-4 4.7.1.2 Changed the secondary steam supply ;
pressure to 865 psig .
f i
t I
e 1
i i
r I
l
-i t
9307080395 930630 5 PDR ADDCK.05000
[p !;
p u na
PLAMT SYSTEMS ENERGEMCY PEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator emergency feedwater pumps and flow paths shall be OPERABLE with:
- a. Two motor-driven emergency feedwater pumps, each capable of being powered from separate emergency cusses, ar,d D. One steam tureine driven emergency feedvater pump capaDie of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2 and 3.
ACTICW:
- a. With one emergency feedwater pump inoperable, restore the required emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN i
within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. With two emergency feedwater pumps inoperable,be in at least HOT STANDBY vithin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c, With three emergency feedwater pumps inoperable, immediately initiate corrective action to restore at least one emergency feedwater pump to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.7.1.2 Each emergency feedwater pump shall be demonstrated OPERABLE:
- a. At least once per 31 days by:
- 1. Verifying that each motor driven pump develops a discharge pressure greater than or equal to 1600 psig at greater than or equal to 90 gpa flow.
- 2. Verifying that the steam turbine driven pump develops a discharge pressure greater than or equal to 1330 psig at a ;
flow greater than or equal to 97 gpa when the secondary steam l supply pressure is greater than Jog;psig. The provisions of Specification 4.0.4 are not applicable.
3.
%S Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
SUMMER - UNIT 1 3/4 7-4 ACendCODt NO. 112 l
. . . - - . - _. . =_. .
i PLANT SYSTEMS i EHERGENCY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3 7.1.2 At least three independent steam generator emergency feedwater pumps and flow paths shall be OPERABLE with: ;
- a. Two motor-driven emergency feedwater pumps, each capable of being ;
powered from separate emergency busses, and
-l
- b. One steam turbine driven emergency feedwater pump capable of being :
powered from an OPERABLE steam supply system. :
APPLICABILITY: MODES 1, 2 and 3. r ACTION: l
- a. With one emergency feedwater pump inoperable, restore the required emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be ;
in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- b. With two emergency feedwater pumps inoperable, be in at least HOT :
STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. With three emergency feedwater pumps inoperable, immediately !
initiate corrective action to restore at least one emergency i feedwater pump to OPERABLE status as soon as possible.
1 i
SURVEILLANCE REOUIREMENTS ;
4.7.1.2 Each emergency feedwater pump shall be demonstrated OPERABLE: i
- a. At least once per 31 days by:
- 1. Verifying that each motor driven pump develops a discharge -
pressure of greater than or equal to 1600 psig at greater than or equal to 90 gpm flow.
- 2. Verifying that the steam turbine driven pump develops a j discharge pressure of greater than or equal to 1330 psig at a flow of greater than or equal to 97 gpm when the secondary i steam supply pressure is greater than 865 psig. The provisions l ;
of Specification 4.0.4 are not applicable. l
- 3. Verifying that each non-automatic valve in the flow path that i is not locked, sealed, or otherwise secured in position, is in .
its correct position. ;
l SUMMER - UNIT 1 3/4 7-4 Amendment No.
.i
i l
Enclosure 2 to Document Control Desk Letter TSP 930009 Page 1 of 1 PROPOSED TECHNICAL SPECIFICATION CHANGE - TSP 930009 ,
VIRGIL C. SUMMER NUCLEAR STATION l DESCRIPTION AND SAFETY EVALUATION DESCRIPTION OF AMENDMENT REQUEST SCE&G proposes to modify the VCSNS TS, Section 4.7.1.2, to perform the I turbine driven EFW pump (EFWP) surveillance test at secondary steam pressure greater than or equal to 865 psig. ,
SAFETY EVALUATION The proposed change to the secondary steam pressure required to test the turbine driven EFWP reflects the results of the analysis performed in support of the license amendment to increase the plugging margin of the steam '
generators, which was approved and issued as Amendment No. 111 on March 18, 1993. After increasing the tube plugging in the steam generator during last refueling outage, the main steam pressure at full power has decreased below the 900 psig required for testing as required by existing surveillance '
requirement 4.7.1.2. This condition was expected as stated above. 1 The proposed request to test the turbine driven EFWP at secondary steam pressure equal to or greater than 865 psig continues to provide conservative and adequate margin to ensure pump capability.
1 i
f f
t I
i
e a
= , a, Enclosure 3 to Document Control Desk Letter TSP 930009 Page 1 of 1 PROPOSED TECHNICAL SPECIFICATION CHANGE - TSP 930009 VIRGIL C. SUMMER NUCLEAR STATION DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION DESCRIPTION OF AMENDMENT REQUEST SCE&G proposes to modify the VCSNS TS, Section 4.7.1.2, to perform the turbine driven EFW pump (EFWP) surveillance test at secondary steam pressure greater than or equal to 865 psig.
BASIS FOR DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION SCE&G has evaluated the proposed TS change and has determined that it does not represent a significant hazards consideration, based on the criteria established in 10CFR50.92(c). Operation of VCSNS in accordance with the proposed action will not:
(1) Involve a significant increase in the probability or the consequences of an accident previously evaluated.
The proposed amendment changes the test' conditions for which surveillance Requirement 4.7.1.2.a.2 is performed and proposes no other significant change to the subject surveillance. Testing .
the turbine-driven emergency feedwater pump at a steam pressure below 900 psig does not adversely affect either the availability or the functional performance of the emergency feedwater system.
At the proposed steam pressure, the EFW pump remains capable of-developing sufficient brake horsepower to develop full operating conditions. As such, the proposed testing adequately demonstrates ,
the functional performance of the turbine-driven emergency feedwater pump.
(2) Create the possibility of a new or different kind of accident from any previously analyzed.
The proposed revised testing does not affect the emergency feed-water system initiation, system response time, or system functional performance. The proposed amendment changes the test conditions under which the turbine-driven emergency _feedwater pump will be tested and does not involve physical changes to the emergency feedwater system. As such, new or different accidents are not created.
(3) Involve a significant reduction in a margin of safety.
The functional performance of the emergency feedwater system functional performance is not changed as a result of the revised testing. As such, current margins of safety are maintained.