MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1462021-02-0505 February 2021 Fer 2020 Ile ES-301-7 Operating Test Review Worksheet-Final ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 2023-08-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1642021-02-0505 February 2021 Ile Outline Review Comments 2023-08-16
[Table view] |
Text
2010 FERMI POWER PLANT INITIAL EXAMINATION OUTLINE SUBMITTAL
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Fermi 2 Date of Examination: AugusVSeptember 2010 Initials Item Task Description
- 1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 w
R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D . l of ES-401 and whether all WA categories are appropriately sampled.
T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
E N d. Assess whether the iustifications for deselected or rejected WA statements are armorxiate.
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients.
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number U and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.
0
- c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
- 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. w
- b. Assess whether the 10 CFR 55.41143 and 55.45 sampling is appropriate.
- c. Ensure that WA importance ratings (except for plant-specific priorities) are at least 2.5.
- d. Check for duplication and overlap among exam sections.
- e. Check the entire exam for balance of coveraae.
- f. Assess whether the exam fits the appropriate job level (RO or SRO).
Author 3 G O . k b a. ~ eser P r i n t a m ) h 1 Facility Reviewer (*)
NRC Chief Examiner (#)
NRC Supervisor I
lote: # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
Not applicable for NRC-prepared examination outlines