NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification (TS) 5.6.5b, Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology
ML19023A547
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/23/2019
From: Balwant Singal
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
L-2018-LLA-0730
Download: ML19023A547 (3)


Text

NRR-DMPSPEm Resource From: Singal, Balwant Sent: Wednesday, January 23, 2019 4:12 PM To: 'Richardson, Michael'

Subject:

Acceptance Review - License Amendment Request to Revise Technical Specification (TS) 5.6.5b, "Core Operating Limits Report (COLR)" for Full Spectrum Loss-of-Coolant Accident Methodology (EPID L-2019-LLA--730)

By letter dated December 26, 2018 (Agencywide Access and Management System (ADAMS) Accession Package No. ML19003A204), Pacific Gas and Electric Company submitted a license amendment request for Diablo Canyon Nuclear Power Plant, Units 1 and 2, to revise TS 5.6.5b, Core Operating Limits Report (COLR), for adoption of Full Spectrum Loss-of-Coolant Accident (LOCA) Methodologies with the NRC-approved LOCA methodologies contained in WCAP-16996-P-A, Revision 1, Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology)."

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 520 hours21.667 days <br />3.095 weeks <br />0.712 months <br /> to complete. The NRC staff expects to complete this review by December 31, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov 1

Tel: (301) 415-3016 Fax: (301) 415-1222 2

Hearing Identifier: NRR_DMPS Email Number: 769 Mail Envelope Properties (BL0PR0901MB3169DB5D3648ED0982CF7A4586990)

Subject:

Acceptance Review - License Amendment Request to Revise Technical Specification (TS) 5.6.5b, "Core Operating Limits Report (COLR)" for Full Spectrum Loss-of-Coolant Accident Methodology (EPID L-2019-LLA--730)

Sent Date: 1/23/2019 4:12:16 PM Received Date: 1/23/2019 4:12:17 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"'Richardson, Michael'" <MJRm@pge.com>

Tracking Status: None Post Office: BL0PR0901MB3169.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3213 1/23/2019 4:12:17 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: