Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation
ML20038A564
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/01/1981
From:
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML111671019 List:
References
PROC-810701-02, NUDOCS 8111130181
Download: ML20038A564 (19)


Text

. .

a WISCONSIN PUBLIC SERVICE CORPOBATION l ECD NO. ECD 16.1 R E Y. 2 I

- Engineering Control Directive l Corporate Energency Response

  • Procedures l

_ _1 DATE 07/01/81 PAGE I CF 10 l l

^ O kf/

REVIEWED BY Y sn_o_ ~7 l l APPROVED BY -

' "J Date Assistant Manager Nuclearl Banager -

Power Date l Nuclear Power l

1. 0 Purpose This directive describes the response of the Corporate Nuclear Engineering Staff (CN ES) members to an activation of the Kewaunee Nuclear Power Plant's Radiological Emergency Response Plan (esergency plan).

2.0 Applicability This directive applies to the members of the CNES following their notification of the activation of the emergency plan.

3.0 Definitions 3.1 Emergency Director - The Plant Manager or his designated al t ernat e , is respcnsible for overall :upervision of emergency activities implemented within the f acility.

The Emergency Director will keep the Energency Besponse Manager inf ormed of changing plant /esergency conditions.

3.2 Emergency Operations Facility (EOF) - An area in the training building, serving as the center for interaction with state and local authorities, NRC emergency response activities and a general assembly area that may be used for special press briefings.

3. 3 Esergency Response Manager - The Assistant Manager, Nuclear Power or his designated alternate respcusible for direction and management of all emergency activities within the EOF and provide for additional of f-site resources required to respond to the emergency.

3.4 Radiation Protection Director - The Plant Se rvices Superintendent er his designated alternate.

3.5 Kevaunee County EOC - (416 Fremont Street, Algosa, W%)

Operations Center for the Kewaunee County Emergency l Go v ern ment orgs aiz a tion.

I 8111130181 811105 PDR ADOCK 05C00305 F pan

, WISCONSIN PUBLIC SERVICI CORPORATION l ECD NC. ECD 16.1 REY. :

I Engineering Control Directive l Corporate Emergency Besponse l l Procedures D ATE 07/01/81 PAGE 2 0F 10 l

___ l l 3.6 Manitovoc County ECC - (1025 S. 9th Street, Manitowoc,~

l WI) Operations Cen ter for the Manitowoc County Energency l Government organization.

4.0 Responsibilities 4.1 Emergency Besponse Manager 4.1.1 The Emergency Response Manager provides the overall direction of the Emergency operaticus Facility (EOF) af ter arriving at the plant site in response to a request f or headquarters staf f support.

4.1.2 The Energency Hesponse Manager is respcasible for the overall coordination of offsite support agencies and for assuring centinuity of resources for long term operation of the response organiza-tica.

4.1.3 The Emergency Response Manager determines the oztent of the CNES response required.

4.1.4 The Energency Response Manager will notify appropriate offsite agencies when the energency has been terminated.

4.1.5 The Emergency Besponse Manager will be immediate-ly inf ormed cf any change of emergency classifi-cation by the Emergency Director.

5.0 Reguirements The CNES response is keyed by the level of emergency classi-i fication determined by on-site personnel. Accordingly, the i following requirements are keyed to the energency classifica-tion (Reference Kevaunee Adninistrative Directive 12.2 for classification criteria) .

i l 5.1 Unusual Event l

l The role of the Emergency Response Manager is not I defined for an unusual Event, however, contact is l established with the corporate management via an infor-sa tion call from the Emergency Directcr to the manage-ment designee for the 3mergency Besponse Manager in

~

  • EISCONSIN PUBLIC SERVICE CCRfCBATION l ECD NO. ECD 16.1 BEY.

l Engineering Control Directive l Corporate Energency Besponse j l Procedures

~

_______--- l

-l D ATE 07/01/81 PAGE 3 CF 10 I

accordance with ACD 12.3, Unusual Event.

5.1.1 The management designee will advise the Public Information Department of t'ae condition and assist in the preparation of a public statement.

5.1.2 The tsnagement designee vill assure that the Public Service Commission is advised of .the outage (Manager, Nuclear Power sakes notifica-tion).

i 5.2 Alert 5.2.1 The position of Energency Response Manager is l formally designated at this classificaticn.

1 5. 2. 2 The Energency Besponse Manager assures that I notification requirements for an unusual Event I have been completed. (Table 2) -

5.2.3 The Energency Response. Manager notifies the Public In formation Department o f the Alert condition.

5.2.4 The Emergency Response Manager notifies the La keshore Division Manager of the Alert Condi-l tion.

1 5. 2. 5 The Emergency Response Manager notifies the l Institute of Nuclear -Power Operations (INPO).

! 5.2.6 The Emergency Response Manager initiates the request for other company resources if conditions warrant.

5. 2. 7 Emergency Response Manager determines the need for CNES response. This determination say be based upon plant status or requests f rom the plant.

1 5. 3 Site Emergency l 5.3.1 The Emergency Besponse Manager assures that I notification requirements for an alert have been l completed. (Table 2) 5.3.2 The Energency Response Manager notifies the Public Information Departmen t of the Site Emer-gency condition.

..--._,,,,,_,-o,,_p..,--.....,,,.._3%,,, ..,.,_y,.y. ,w, ..,w_. m .m ..-,--,,y,

. WISCONSIN PUBLIC SERVICE CORPCR ATION l ECD 50. ECD 16.1 REY. 7 l

Engineering Control Directive l Corporate Energency Response f l Proced ur es <

_ _ _ _ l DATE 07/01/81 PAGE 4 CF 10 1 l __ _

5.3.3 The Emergency Response Manager notifies the lakeshore Division Manager of the Site Emergency condition. -

5.3.4 The Emergency Response Manager notifies the Institute of Nuclear Power Operations (INPO).

5. 3. 5 The Emergency Response Manager will meet with the Emergency Director u pon arriving at the site.

This briefing may be waived if the Emergency Besponse Manager has been briefed prior to this arrival, if the Emergency tirector is unavailable (and designates a briefing by an alternate member of the TSC staff) , or if conditions prchibit face-to-face centact.

5.3.6 The Emergency Besponse Manager activates the Emergency Operations Facility per ECD 16.2.

Prior to establishing operations from the f acili-ty, the Emergency Response Manager will contact the Radiological Protection tirector to assure unlimited habitability or establish a maxim um stay time. (Radiation monitoring will be establ-ished in the EOF) .

5.3.7 The Emergency Besponse Manager will verify the actions on the ECF activation checklist (Table 1) have been performed.

5.3.8 Upon adequate staffing of the ECF, continuing contact with off-site support agencies will be transferred to the EOF.

l 5. 3. 9 The Emergency Response Manager determines the l

need for CNES support.

[

5.3.10 The Emergency Response Manager may dispatch a l

representative to the Kewaunee or Manitcucc l

County Emergency Operations Cen ter (EOC) .

I S.4 General Emergency

{ l 5.4.1 1he Esergency Response Manager assures that 1

notification requirements for a Site Emergency l

l l have been completed. (Table 2) l

5. 4. 2 The Emergency Response Manager notifies the Public Information Department of the General Emergency ccndition.

i

w HISCONSIN PUBLIC SEBYICE CORPORATION l ECD NO. ECD 16.1 REY. ;

I Engineering Control Directive l Corporate Energency Response i Procedures' l

D AT E 07/ 01/ 01 P A GE 5 0F 10 l t

5.4.3 The Emergency Besponse Manager notifies the Lakeshore Division Manager of the G&neral Emer-l gency condition.

I 5. 4. 4 The Emergency Besponse Manager notifies the l Institute of Nuclear Power Operations (INPO).

5.4.5 The Emergency Hesponse Manager determines the need fcr CNES response.

5.4.6 The Energency Response Manager provides the overall direction of the EOF including recommen-dations to the state tc initiate predetermined protective actions for the public.

i

. WISCC ESIN PUBLIC SERVICE CORPORATION l ECD NO. ECD 16.1 REY. ;

I __

Engineering Con trol Directive l Corporate Energency Hesponse l Procedures

- - _ l DATE 01/01/81 PAGE 6 0F 10 1 I _ _ _ _ _ - -

Table 1 - .

EOF Act ivation Checklist

1. Start Time:
2. Contact Radiation Protection Director and inform him of activation of the EOF and the need for radiation monitoring.
3. __

Activate EOF f ollowing approval from Radiation Protection Director.

4. Record EOF activation started in Log Bock.

I S. . _ _ _

Verify ventilatica systes is operating per ECD 16.2.

I 6. _

verify Ping 2A sonitoring system is operating per i ECD 16.2.

I 7. _

Verif y Communication capability with the Technical l Support Center.

I 8. _____

Verif y communication capability with the state and I county Emergency Cperations Centers.

I 9. .Verif y communictions with the Ccrporate of fice.

1 (Table 5) i 10. __

Notif y necessary corporate staf f and request that th l report to the site. List individuals contacted.

l 1

l

-. -.-- , _ . - , - , , , . . . - . _ . , . - . . . ~ - , - . . - - . - . . . . . - . , . . . , . . . . _ _ , . . . , , , , , . . , - . . , . - _ , - . .

WISCONSIN PU ELIC SERVICE CCRECHATI 03 1 ECE NO. ECD 16.1 REV. 2 i

Engineering Con trol' Directive l Corporate Emergency Response l Proced ures

__ ._ ___ i DATE 07/01/81 PAGE 7 0F 10 1 l

Table 2 .. .

Emecqency Response Managel Designee and Mternateg

1. Assistant Manager, Euclear Power (C. R. L uce a)
2. Manager, Nuclear Pcuer (C. W. Ciesler)
3. Nuclear Services Supervisor (K. H. Weinhauer)
2. egg.qnsibilitigg Accordino is Emeroency Classifigaj; igg l l Unusual l l Site l General I Ac tion to be taken i Even t l Alert IEmergency lEmergenc;
;  ; l l 1 1 I I l l Notif y Puilic Information i 1 11 1 1 J l I .

I I I i 1 Assure notification o f Public I 1 12 l 2 1 2 IService Commissicn of Wisc. 1 l l 1 1 I I i 1 1 I Notif y Institute of N uclear i

  • 11 1 1 l 1 1 IPower Operations (IN FO) l l l 1 1 I I I I INotify Lakeshore Division Manager i
  • 11 l 1 l 1 I l 1 1 1 l l Notify Support Staff I l As Needed 1 1 i i i l 1 Dispatch Representative to EOC l
  • l
  • 1 1 1 2 l (if requested) l l l l l 1 1 1 I IActivate the EOF i
  • 1*

1 1 1 2

1 - Initia te Action 2 - Ver ify lower event classification action perf ormed.

  • - No action necessary

,, . . , . .-- . - - . . , . . - - - - . . . . , - - - . _ - - _ - ~ . . . . . - - . _ .-...- -.

, HISCONSIN PUELIC SERVICE CORPOR ATI ON l ECD NO. ECD 16.1 R EY. 2$

1 __- ,

Engineering Control Directive l Corporate Emergency Response  !

l P ro cedures l

D ATE 07/01/81 PAGE 8 CF 10 _l 1

Table 3 ., , ,

Notification Phone List Corporate Nuclear Engineering Staf f

( Alphabet ically)

O f fice (4 3 3-) Home No. Pa cer No.

  • Drabels, B. E. ~l -

Giesle r, C. W. (1) 91 Luoma, C. H. ( 1) 92 ,

Morrison, J. N. -

Nalepka, D. S. -

Histau, D. J. -

Sauer, D. W. j -

i Schneider, D. P. -

Schrock, C. A.  !

( 1) 94 l

Thorgersen, J. G. l .

I Wallace, J. J. l i (1) 21 Weinbauer, K. H. ( 1) 93 Eill, D. J.

(1) 86 Mike Kiefe r Jim Derbique Public Information Director .

La kes hore Division Man ager b Office: 433-1620 '

Cf fice: Internal Home: 468-1400 '

Office: External Home:

Green Bay Transmitter:

Kevaunee Transmitter: _-

  • When activa ting Green Bay transmitter, dial 1 before pager number.

NOT E: USE PUSH SUTTON PHONE WHEN USING PAGEH SYSTEM.

  • WISCONSIN PUBLIC SERVICE CCHECB&TI ON l ECC NO. ECD 16.1 REY. 2 s 5. ,. 3 l

Engineering Con trol Directive l Corporate Emergency Besponse ~

l Procedures

_ _ _ l D ATE 07/01/81 PAGE 9 0F 10 l l

Table 4

- - [glc.. -

SUPPORT AGENCIES - CC5EERCIAL PHCNE NUMBERS EJ 9 h ' :.,

NRC - Begion III - Chicago Operations Of fice 1 Wisconsin Division of Emergency Government 1 East Central Area Office of Emergency Government -

Fond du Lac 1 i

State Police - Fond du Lac I Kevaunee County (Sherif f's Departaent) 1 Kewaunee County Emergency Government (ECC) 1 Manitosoc County (Sherif f's Department) 1 Manitowoc County Emergency Government D irect o r 1 Department of Energy Day Night Point Beach Nuclear Power Plant 1 U.S. Coast Guard Day 1 Night i Med ical Assistance Two Rivers Hospital 1 Dr. Weld /Dr. Kaner 1 U.W. Hospi tal 1 Dr. Larscn 1 A me rican Nuclear Insurers 1

Hestinghcuse Day 1 Night 1 Fluor Power Services C. E. Agan, Director Office 1 Home 1 T. L. Roell, Alternate Office 1 Home 1 Public Service Commission of Wisconsin 1

,, VISCONSIN PUBLIC SERVICE CCRFCHATI ON l ECC NO. ECD 16.1 BEY. 2 :s4, I -

Engineering Control Directive l Corporate Emergency Response .,

l Procedures

-____-- I D ATE 0 7/01/ 81 PAGE 10 0F 10 l l

^'~~~'

l Table is - Ccntinued ,, ,

l Institute of Nuclear Pcwer Operations (INPO) 1 m.

0 e

s

WISCONSIN PUBLIC SERVICE CORPORATION ECD NO. 16.1 REY. 2 ENGINEERING CONTROL DIRECTIVE TITLE Corporate Emergency Response Procedure

. DATE 7/1/81 PAGE of Table 5 0FF SITE EMERGENCY TELEPHONE COMMUNICATIONS LINKS WPS  !

Corporate Nuclear DePaT****C Ext-g _

'____._l i .___

s

<D _______

a KNPP TSC EOF -

<- CR - . . - -

<P /

Ext. ,, -

o -

/

- ' Ext.

@ 4 .-

, Lakeshore Division Operations Bldg.

DEDICATED PHONE LINES SERVING KNPP EMERGENCY FACILITIES.

(Existing corporate tie lines not illustrated.)

Extension of G3 telephone system Extension of KNPP telephone system J Telephone jack

@ Telephone set

WISCONSIN PUBLIC SEFYICE CORPORATIO3 l ECD NO. 16.2 B EY. 0 l __

Engineering Control Directive l EOF Activation Procedure I

___ _1 DATE 07/01/81 PAGE 1 CF 8 l l

REVIEWED BY W ACsistant Manager 7-48/ l APPROVED BY l

~

Manager -

J I/

Date Nuclear Power Date l Nuclear Power I

1. 0 Purpose This directive describes how to 'ac tivate the Energency Operations Facility (ECP) when necessitated by the Kesaunee Nuclear Power Plant's Radiological Emergency Hesponse Plan (Emergency Plan) .

2.0 Applicability This directive applies to the Emergency Hesponse Manager following his notification of a need for activating the E0P.

3.0 Definitions 3.1 PI NG 2 A - The Ping 2 A is a combination microprocessor and cart mounted sampling system. It is used to seasure particulates, iodine and noble gases present in the EOF environment.

l l

4. 0 Respo nsibilities 4.1 The Emergency Besponse Manager is responsible for verif ying that the ventilation systes is in recircula-tion if necessary.

l 4. 2 The Emergency Hesponse Manager is responsible f or verif ying that the Ping 21 radiation monitor is operat-l l ing.

5.0 Hequire me nts Upon notification of a need to activate the Emergency opera-tions Facility the Emergency Response Manager must perform or verify performance of the following activities:

HISCONSIN PUELIC SERVICE CORPCHATION l ECD No. 16.2 REY. 0 i -

Engineering Control Directive l EOF Activation Procedure

______ 1 DATE 07/01/81 PAGE 2 CF 8 ]

_ _ _ 1 5.1 Activation of Ventilation System (Secirculatics)

If airborne contamination is detected, or if meteorolog-ical conditions are such that the EOF would be in a release plume (i.e., vinds off the lake) , place the EOF ventilation system in the recirculation mode by perf cIn-ing the following:

a) Close fresh air damper (upper) b) open recirculation damper (lower) i c) Turn fan on.

5.2 Activate Ping 2A radiatica monitor a) Verify that data in all the files ( 1-- 6) is as required on calibration worksheet (Table 1) . This is done by pressing the f cllowing keys:

1) Elue FILE key
2) Black number key (The number of the channel you want. Start with cne ( 1) for s}stes s ta r t-up )
3) Black INTER key - If the data is nct as required by the calibration sheet, go to Attachment 1 (Ping 2A operation procedure) and edit the files as necessary. If the files are correct, continue on to part b.

b) The PING 2A is now on lire and ready to gc. Now i turn the keyboard key on and press PUMP ON then ENTER.

6.0 References

1) BC-HP-56 (PING-2A Operation and Calibration) Dasis for A ttac hme nt 1.

I

{

WISCONSIN PUBLIC SERVICE COBPOR ATION l ECD NO. 16. 2 REY. O Engineering Control Directive l EOF ActivatiEn Procedure I

l DATE 07/01/81 EAGE 3 CF 8 l 1

Table 1 ,

CALIBB ATION EORKSHEET F 001 FBIL EX F Of4 FAIL EX 017 FBRT 01 BKGHD 02 FC 02 CPM r 03 CAL.CONSTAHT +8.562-06 08 FIX.BKG.SUB. +0.80E+08 04 BKGli CH4 2 la ALT ALM SET' +1.00E+96 05 BKG91 FACTOR +1.13E+00  !! TN BLN E%/fD +1.00E+86 06 BKG82 CH4 6 16 LOGGED 7 YES -

07 BKGl2 FACTOR +2.94 E-02 ,

08 FIX.BKG.SUB. +3.01E+0b 09 HI ALM SET +1.06E-02 10 ALT ALM SET +5.40E-03 11 TH ALM C%/M3 +5.00E+01 13 FLOW ECC/33 +6.00E+04 16 LOGGED? YES F 002 FAIL EX F 005 FBIL EX -

81 a PART -

01 P GAS - - -

02 CP?! -

02 F0/CC '- -

03 CAL. CONSTANT +1.00E+00 03 CAL. CONSTANT +8.00E-08 04 BKGli CH3 .- 0 04 BKGt! CHI 6 05 BKGli FACTOR +o,coz+60 05 BKG81 FACTOR +2. 40E-02 06 BKGl2 CHt 0 06 BKG12 CHI B 07 BKG82 FRCTOR +0.coz+00 07 BKG82 FACTOR +0.00E+00 08 FIX.BKG. SUS. +.o.cozwo 08 FIX.BKG.SUB. +2.60E+0!

09 HI ALM SET +1.00E+06 09 HI ALM SET +1.00E-05 10 ALT ALM SET +1.00E+06 '10 ALT ALM SET +5.00E-06 11 TN ALM E%/?O +1.00E+06 11 TH ALM E%/70 +5.00E+01 13 FLOW ECC/?G +6.00E+04 13 FLOW ECC/M3 +6.00E+04 16 LOGGED? YES 16 LOGGED? YES i

l F 003 FAIL EX 006 HORMAL i

01 IODIHE 01 3 AREA 02 FC 02 MR/HR 03 CAL. CONSTANT +2.43E-05 03 CAL. CONSTANT +1.15 E-03 04 BKGil CH8 4 08 FIX.BKG.SUB. +3.20E+01 05 BKG81 FACTOR +1.40E+00 09 HI ALM SET +4.00E+00 l

06 BKG42 CH8 ~ 0 10 ALT ALM SET +2.00E+00 07 BKG82 FACTOR +0.00E+00 U TH ALM C%/70 +5.00E+00

08 FIX.BKG. SUS. +0.00E+00 16 LOGGED? YES l 09 HI ALM SET +1.00E-02 l 10 SLT ALM SET +5.00E-03 11 TH ALM C%/?D +1.00E+02 ~

13 FLOW C:C/M3 +6.00E+04 16 LOGGED? YES

- - - . ,u-,, y - m- r - . , , - . . - , - - - - - , - - . - - - - - - . - - +- s -

WI$CONSIN PUBLIC SERVICE CCB ECEATION l ICL No. 16.2 887. 0

. 1 Engineering Control Directive l EOF Activation Procedure I

_ _ _ _ l DATE 07/01/01 PAGE 4 0F 8 l

__ l _

Attach me nt 1 PING 2A Edit and Operation Precedure 1.0 Purpose and Descripticn 1.1 The Ping 2A is a combination sicrcprccessor and cart mounted sampling system. It is used to measure particu-lat es , iodine a nd noble gases in the Energency Opera-tions Facility environment. To accoaplish this it takes data f rom six channels. The particulate filter is sonitored by a Beta Scintillation Detector f rom one side and a solid state Alpha Detector on the ocher side. The beta detector is used for channel one. Channel two comes from the Alpha Detector. Chancel two is used for the background channel to subtract out a factored amount of alpha measurerent f orm the beta seasurerent. Tcgeth-er channels one and two are used for the airborne particulate measurement.

1.2 The iodine measurement is a combination of the readings from channels three and four. The charcoal cartridge is monitored by a 2 x 2 inch NaI Gamma Detector. The NaI Cetector provides an Input intc tuc separate (SCA) single channel analyzers (C ha nnels 3 a nd 4) . Channel three is calibrated to the 364 kev energy of I-131. The other SCA (Channel 4) is calibrated to an energy above the I- 131 energy to provide a seasure cf the background in the Iodine vindow. ,

1. 3 The gas chanber is sonitored by a heta detector which l provides an input into channel five. Background for this channel is derived from the area monitor (channel j six). This channel is also used for a source cf a l background subtraction for the particulate measurement

! cn channel one.

2.0 Operation 2.1 Each channel has a file of units, calibration constants, background factors, alarm set peints, and other data which the microprocessor uses to arrive at a very accurate unit of measuremen t. By using the keyboard and the latest calibration work sheet we can program these i files to meet our needs.

i l

' EISCOMqIM PU BLIC SERVICE CORPOB ATION l ICD No. 16.2 R E Y. 0 .

I Engineering Control Directiva l EOF Activatica Precaduce i

__ 1 DATE 07/01/81 P AGE 5 CF 8 I I __

2.2 Turntag Systez on 2.2.1 Remove front access cover from control console.

a) Locate switch on the wire coming from the 12 volt DC battery. Turn this switch cn.

b) Plug into 120 vol t AC.

c) Replace access cover.

2.2.2 Insert keybcard key and turn to the right. You will get the yellow KB Enable light.

2.2.3 In the following crder press the following keys on the keyboard:

a) Elue FILE key (upper keyboard) .

b) Number 0 key (lower keyboard). ,

c) Black ENTEH key.

This allows you to set the day and time.

Besponse will be:

EN T ER DAY TIME You will respond with number of day (1-365) l and hour of day. (Ex. . __. )~Dc nct worry about a space between day and' time. It will -

respond as follows:

III IIII LOG TIME IIII ENTER 24 HB LOG TI5E You will respond with the time you want it to prin t out. Most of the time we use 0700 (0700 then INT E R) . It will respond with:

LOG TI53 0700 4 HH INTERVAL 7 With this you will either answer with a yes

(+/cn) or a no (-/o f f) scst of the time we vill answer with no. (-/o ff then ENTER) It will say:

NO Now we are ready to EDIT files 1-6 with the channel para:eters that we want.

EISCC M SIN PUBLIC SERVICE CORPCHATION 1 ECD NO. 16.2 BEY. 0

  • I Engineering Control Directive l EOF Activation Procedure i

_ l D ATE 07/01/81 PAGE 6 0F 8 l

_____ l 2.2.4 Turn keyboard off, yellow KB EN ABLE light eff.

2.2.5 Turn EDIT key to the right, two yellow lights on (ED IT , ENABLE, KB EN AELE) .

2.2.6 Press the following keys:

a) Elue FILE key.

b) Black number key (The number of the channel you want. Start with 1 for systen S t a r t- u p) . .

c) Black ENTER key.

You will ncy get a print out of the current file f ec the channel you called up in step c) above. Using this file data and the calibration work sheet ycu will now edit this file the way you want it. You can either change all or part of the data in the file.

2.2.7 To start to edit the file dc the following:

a) Press the Black EDIT key, b) Next call up line one by pressing 01 then E NT E B.

c) You will now get a list of responses on the printer. Respond by calling u p the line no.

of the response you wan t (example: 02 for beta particulate) then ENTEB.

2.2.8 Now you will get another list of responses for whatever units you want the channelto print out in. Respond by again calling up the line no. of the response you want (exa m ple: 02 f or uc.) then ENTER.

2.2.9 Now edit the other lines in the file the way you want them to be from the calibra tion work sheet.

Use the following rules:

a) Press the EDIT b) Then call up the line number of the line you want to change (e xa mple : 03 for line 3 of the file). Now enter the informaticn you

~

SIS' CON 5IN PUBLIC SERVICE CCHECSATION l ECE NO. 16.2 REY. 0 o-  !

. Engineering Control Directive l EOF Activation Procedure I

i DATE 07/01/81 PAGE 7 0F 8 1 4

vant to change. (See Ncte 4 below) See example below for the prcper response; 03+3.49-06 then ENTER What you have just said is: Change line 03 to be + 3. 4 8 E- 06. Use this format to make all cther line changes. See rules belcw for other changes:

1) Always use a ( +) sign in frcot of ca.

constants, and bkg. factors,

2) Ekg. CBf changed in following; 042 then ENTER you just said change line 4 to be ch. 2.
3) When it asks for a yes cr nc; yes =

+/on and no = -/off.

4) When entering a number for cal, constants of Bkg. factors, Press the next highest number. E x: +3.49=06 f or 3.4 8 E=06 2.2.10 Af ter you h ave all the lines in the file changed to the way you want them do the following:

Turn the EDIT key back to the left one position.

This adds everything tc the file yo u ch ang ed.

You will get a printout of the file with the things on you cha nged. Do this for cil the files (one through six) when you first turn the PING 2A l cn. If you want to just edit a file this is not l

needed.

2.2.11 The PING 2A is now on the line and ready to go.

Now turn keyboard key on and press PUMP ON then l ENTES.

i l

2.3 Turning Systes off

1) Bemove fron access cover f rca control l console.

l

2) Inset keyboard key and press PUMP OFF then E NT E B.
3) Pull plug for console.

l

~

EIdQOISIN PUBLIC SERVICE CORPORATION I ICD MO. 16.,2 REY. 0 l

?~

- Engineering Control Directive l EOF Activation Procedure 1

i DATE 07/01/81 PAGE 8 0F 8 l 1

4) locate and turn off battery switch.
5) Pull plug for sample cart. - -

_. . . _ . . _ _ _ __ _