ML20117L7275 September 1996Proposed Tech Specs 4.2-2 Re Steam Generator non-repaired Tube Insp & 4.2-3 Re Steam Generator Repaired Tube Insp
ML20092K81319 September 1995Proposed Tech Specs,Providing Revs to Clarify Purposes to Maintain Accuracy of TS & Reflect Revs to 10CFR20, Stds for Protection Against RadiationHydrostatic
Fuel cladding
ML20091P10427 January 1992Proposed Tech Specs Re Steam Generator Tube SleevingHigh Radiation Area
Operating Basis Earthquake
Process Control Program
ML20205H34012 January 1987Rev 3 to Reactor Test Program,Kewaunee Nuclear Power PlantShutdown Margin
ML20125B44931 May 1985Plant,Cycle II Startup Rept,May 1985Shutdown Margin
ML20108F47920 August 1984Suppl to Kewaunee Nuclear Power Plant 1984 Integrated Leak Rate Test Rept
ML20092K41930 June 1984Cycle 10 Startup Rept,June 1984Shutdown Margin
ML20080B97212 January 1984Rev B to Emergency Plan Implementation Procedure EP-RET-3C, Post-Accident Operation of High Radiation Sample RoomGrab sample
ML20080B98712 January 1984Emergency Plan Implementing Procedure EP-TSC-7, Reactor Vessel Head Venting Time Calculation
ML20083F71627 October 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site EmergencyHealth Physics Network
ML20078L57929 September 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency
ML20078F48016 August 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual event,EP-AD-8 Re Notification of Alert & EP-AD-9 Re Notification of Site Emergency
ML20077Q04826 July 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-ENV-8 Re Total Population Dose Estimate calculations,EP-RET-5 Re Plume Projection & EP-RET-6 Re Dose ProjectionGrab sample
ML20077B60015 July 1983Cycle 9 Startup Rept for June 1983
ML20078G42021 June 1983Rev D to Procedure EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data)
ML20078G43321 June 1983Rev D to Procedure EP-ENV-3G Manual Projection Calculation
ML20078G44321 June 1983Rev a to Procedure EP-RET-3D Containment Air Sampling Analysis Using Casp
ML20078G43721 June 1983Rev B to Procedure EP-ENV-3H Protective Action Recommendations
ML20078G40621 June 1983Rev E to Procedure EP-ENV-3E Manual Determination of X/Q (Knpp Meteorological Data)
ML20078G39821 June 1983Procedure EP-ENV-3D Primary Determination of Meteorological Data
ML20078G39421 June 1983Procedure EP-ENV-3C Primary Dose Projection Calculation - Ibm Personal Computer
ML20078G35021 June 1983Rev C to Procedure EP-AD-11 Emergency Radiation Controls
ML20077E00421 June 1983Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-11 Re Emergency Radiation Controls & EP-ENV-3A Re Environ Protection Director ActionsGrab sample
ML20078G37821 June 1983Rev E to Procedure EP-ENV-3B EM Team Actions
ML20078G36821 June 1983Rev H to Procedure EP-ENV-3A Environ Protection Director Actions & Directives
ML20069J50710 March 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Class Determination & EP-AD-11 Re Emergency Radiation ControlsSafe Shutdown
Health Physics Network
High winds
Shutdown Margin
High Radiation Area
Earthquake
Fuel cladding
ML20069F8351 March 1983Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedure EP-SEC-2, Security Force Response to Emergencies. Revised Table of Contents Encl
ML20028D4813 January 1983Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. Revised Index Encl
ML20066E26913 October 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-2 Re Emergency Class determination,EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of AlertSafe Shutdown
High winds
Earthquake
Fuel cladding
ML20062E0802 July 1982Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. Revised Index Encl
ML20058F67418 June 1982Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room
ML20054F39621 May 1982Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use
ML20052H84216 April 1982Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert
ML20052B10519 March 1982Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. Revised Index Encl
ML20042B24918 February 1982Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation.Revised Index Encl
ML20049H41529 January 1982Public Version or Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Sam II Operation & EP-EOF-4 Re Corporate Response to Alert.Revised Index Encl
ML20040F97815 January 1982Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency.Revised Table of Contents Encl
ML20039H14921 December 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-3 Re Unusual Event & EP-AD-4 Re Notification of Unusual Event
ML20038C38221 October 1981Public Version of Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Classification Determination & EP-AD-3 Re Unusual EventSafe Shutdown
High winds
Met Tower
Earthquake
Fuel cladding
ML1116601097 August 1981Proposed Amend 46 to Tech Specs 3.4,3.10,Table 3.1-2,Figures 3.1-1,3.1-2,3.10-7 & Pages 3.1-2,3.1.2a,3.1.2b,3.1-2,3.1-3, 3.1-6,3.1-7,4.2-2a,4.2-8 & 6-2 for Pressure Safety Isolation Valves & Normal Operation Heatup/Cooldown LimitsSafe Shutdown
Shutdown Margin
Hydrostatic
ML20038A5641 July 1981Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation
ML20038A5763 June 1981Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization StructureSafe Shutdown
High winds
High Radiation Area
Earthquake
Stolen
ML20038A56331 March 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Acd 12.1 Re Emergency Organizational Structure,Acd 12.3 Re Unusual Event Notification & Acd 12.4 Re Alert
ML20038A56627 February 1981Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation & Public Info Plan
ML19210C99816 November 1979Proposed Amend 41 to Tech Specs,Changing Limit for Reactivity Anomalies for Comparison of Measured to Predicted Boron Concentrations to 1% ReactivityShutdown Margin
Emergency Lighting
ML19256E00819 October 1979Proposed Tech Spec Amend 40,adding Fire Protection Sys Committed to in Amend 23,deleting Mods Required as License Condition,Adding 5-man Fire Response Requirements & Correcting InconsistenciesFire Barrier
Hydrostatic
Fire Watch
Hourly Fire Watch