Page 1 of 5 REY.

January 15, 1982

~

EMERGENCY PLAN IP.PLE!4ENTING PROCEDURES

-Index-((_ -

Procedure #

TITLE REVISION

-._A_TE D

EP-AD-1 Plant Emergency Organization A

12-21-81 EP-AD-2 Emergency Class betermination A

10-21-81 EP-AD-3 Unusual Event,

A 12-21-81 EP-AD-4 Alert A

12-21-81 EP-AD-5 Site Emergency A

12-21-81 EP-AD-6 General Emergency

'A 12-21-81 EP-AD-7 tiotification of Unusual Event B

12-21-81 EP-AD-8 Notification of Alert ~

B 12-21'-81 EP-AD-9 Notification of Site Emergency B

12-21-81 EP-AD-10 Notification of General Emergency B

12-21-81 EP-AD-Il Emergency Radiation Controls A

12-21-81 EP-AD-12 Personnel Assembly and Accountability A

12-21-81 EP-AD-13A Limited Area Evacuation 12-21-81 EP-AD-13B Emergency Assembly / Evacuation 12-21-81

.EP-AD-13C Site Evacuation 12-21-81 EP-AD-14 Search and Rescue 12-21-81 EP-AD-15 Recovery Planning 10-21-81 EP-AD-16 Fersonnel Injury or Vehicle Accidents 12-21-81 EP-AD-17 Communications 12-21-81 EP-AD-18 Administration of Iodine Blocking Agents 12-21-81 EP-ENV-1 Environmental Team Organization A

12-21-81 EP-ENV-2 Site Access Facility (SAF) Activation A

12-21-81 k_

~~

8202110029 820204 PDR ADOCK 05000305 F

PDR

..._e-_..___:..._...

January 15, 1982 l

Page 2 of 5

('T.%'

EMERGENCY PLAN IMPLEMENTING PROCEDURES

-Index-(cont'd)

Procedure #

TITLE REVISION DATE EP-ENY-3A Environmental Protection Director Actions and Directions A

12-21-81 EP-ENV-3B Environmental Monitoring Team Actions A

12-21-81 4

EP-ENV-3C Primary Determination of X/Q 12-21-81 EP-ENY-30 Alternate Determination of X/Q 12-21-81 i

EP-ENY-3E Manual Environmental Dose Projection 12-21-81 Calculations EP-ENV-3F Protective Action Recommendations 12-21-81 EP-ENY-4A Sample Acquisition, Portable Instrumentation Use A

12-21-81 i

EP-ENY-4B Sample Acquisition, Air Monitoring Devices A

12-21-81

/'

EP-ENV-4C Sample Acquisition, Environmental

(

Sampling lechniques A

12-21-81 EP-ENV-5A LCS-1 Operation A

12-21-81 EP-ENV-58 MS-3 Operation A

12-21-81 EP-ENV-5C SAM II Operation A

12-21-81 EP-ENV-50 PAC-4G Operation A

12-21-81 EP-ENV-5E Reuter-Stokes Operation 8-19-81 EP-ENV-6 Data Analysis, Dose Projections and Protective Action Recommendations DELETED l

l EP-ENV-6A Relocation of Site Access Facility (Habitability) 12-21-81 EP-ENV-6B SAF Environmental Sample Analysis Relocation 12-21-81 l

EP-ENV-7 Site Access Facility Communications 12-21-81 EP-ENV-8 Total Population Dose Estimate 12-21-81 l

\\

Page 3 of 5 EMERGENCY PLAN IMPLEMENTING PROCEDURES

-Index-

{

,l (cont'd)

Procedure #

TITLE REVISION DATE EP-EOF-1 Corporate Staf f Emergency Response Organization A

12-21-81 EP-EOF-2 Emergency Operations Facility (EOF) Activation A

12-21-81 EP-EOF-3 Corporate Response to an Unusual Event A

12-21-81 EP-EOF-4 Corporate Response to an Alert A

12-21-81 EP-E0F-5 Corporate Response to a Site Emergency A

12-21-81 EP-E0F-6 Corporate Response to a General Emergency A

12-21-81 EP-EOF-7 Communications and Documentation A

12-21-81 EP-EOF-8 Relocation of EOF 12-21-81 EP-EOF-9 Interface with Support Organizations 12-21-81 EP-0P-1 Control Room Emergency Organization 12-21-81 EP-0P-2 Emergency Activation of Control Room

^12-21-81 EP-0P-3 Control Room Communications 12-21-81 EP-0SF-1 Operational Support Facility (OSF) Organization A

1-15-82 EP-OSF-2 OSF Activation 12-21-81 EP-0SF-3 Work Requests During an Emergency A

1-15-82 EP-0SF-4 OSF Communications 12-21-81' I

EP-RET-1 Radiation Emergency Team (RET) Organization B

12-21-81 EP-RET-2 Inplant RET B

12-21-81 e

i t

'P' age 4 of 5 1-15-82 EMERGENCY PLAN IMPLEMENTING PROCEDURES

-Index-(cont'd)

Procedure #

TITLE REVISION DATE EP-RET-2A RP0/RAF Activation A

12-21-81 EP-RET-2B Gaseous Effluent Sample and Analysis A

12-21-81 EP-RET-2C Containment Air Sampling and Analysis A

12-21-81 EP-RET-2D Emergency Radiation Entry, Controls and A

12-21-81 Implementation EP-RET-2E Handling of Injured Personnel 12-21-81 EP-RET-2F Personnel Decontamination 10-21-81 EP-RET-3 Emergency Chemistry Team B

12-21-81 EP-RET-3A Liquid Effluent Sample and Analysis A

12-21-81 EP-RET-3B Post-Accident ReactureCoolant Interim A

12-21-81 Sampling Procedure EP-RET-4 Site RET B

12-21-81 N#

EP-RET-4A EOF Radiological Monitoring A

10-21-81 EP -RET-4B Radiological Controls at Site Access Facility (SAF) 10-21-81 EP-RET-4C Site Radiological Monitoring 12-21-81 EP-RET-5 Plume Projections A

12-21-81 EP-RET-5A Plume Projections (Backup Method)

A 12-21-81 EP-RET-6 Dose Projection A

12-21-81 EP-RET-7 RAF/RP0 Communications 12-21-81 EP-RET-8 Contamination Control at the Two Rivers 12-21-81 Community Hospital emememememememememe l

I 1 !

'Page 5 of 5 EMERGENCY PLAN IMPLEMENTING PROCEDURES

-Index-(cont' d)

~

Procedure #

TITLE REVISION DATE l

EP-SEC-1 Security Organization 12-21-81 EP-SEC-2 Security Force Response to Emergencies A

12-21-81 EP-SEC-3 Personnel Accountability (Initial and Maintaining) A 12-21-81' EP-SEC-4 Dosimetry Issue at SAF 12-21-81 EP-TSC-1 Technical. Support Center (TSC) Organization 12-21-81 EP-TSC-2 TSC Activation 12-21-81 EP-TSC-3 Plant Status Procedure 12-21-81 EP-TSC-4 Emergency Design Change, Major Equipment Repair 12-21-81 EP-TSC-5 TSC Communications 12-21-81 1

l i

l I.

c

l l

WISC0!! SIN PUBLfC SERVICE' CORPORATION i

NO.

EP-OSF-1 REY. A I

Kewaunee Nuclear' Power Plant l TITLE: Operational Support Facility l

Emergency Organization e

EMERGEllCY PLAtl IliPLE!!EllTING PROCEDURE l

l l DATE: MN 151982 l PAGE 1 of 2 (v

I I

i REVIEWED BY

  1. a / / a,., ///. I M APPROVED BY [M

//

I I

1.0 PURPOSE This procedure establishes the emergency response organization for the Operational Support Facility (OSF).

2.0 APPLICABILITY The OSF Staf f will be fonned whenever the need arises to activate the OSF.

3.0 REFERENCES

3.1 Kewaunee fluclear Power Plant Emergency Plan 3.2 EP-AD-1, Plant Emergency Response Organization 4.0 RESP 0!1SIBILITIES 4.1 Support Activities Director (SAD) 4.1.1 Overall direction of the OSF.

4.1.2 Direction and coordination of emergency activities performed by maintenance and support personnel.

l 4.1.3 Procurement of electrical and mechanical-equipment required for emergency maintenance operations.

4.1.4 Implementation of requests made by the Emergency Director for changes or modifications to systems or components required to i

stabilize plant conditions.

4.1.5 Evaluation of manpower, equipment and material necessary to support the emergency response organization.

4.1.6 Review of all work requests and the assignment of the proper priority levels for each request.

4.1.7 Planning and scheduling of all work in a manner to maintain plant safety systee reliability.

w i

l I

WISCONSYN PUBL!C !ERVICE 'CORPORATf 0N 1

NO.

EP-OSF-1 I

Kewaunee Nuclear' Power Plant-l TITLE: Operational Support Facility l

Emergency Organization EMERGENCY PLAN IMPLEMENTING PROCEDURE l

l l DATE: JAN 151982 i PAGE 2 of 2 4.2 Operational Support Facility Staff 4.2.1 Manning communication links as directed by the SAD.

4.2.2 ~ Assisting the SAD as required for evaluation of equipment and material necessary to support the emergency response organization.

4.2.3 Assisting the SAD in the review of work requests and the planning and scheduling of work as required.

4.2.4 Performing emergency repair on plant equipment and systems.

4.2.5 Assisting in search and rescue operations.

4.2.6 Provide manpower, equipment, and material necessary to support the emergency organization.

L 5.0 REQUIREMENTS 5.1 The OSF will be activated in accordance with EP-OSF-2, " Operational

.~

Support Facility Activation."

5.2 The SAD will keep the Emergency Director updated on the progress of modifications and emergency repairs being performed.

~

l 5.3 The OSF Staff will serve as the labor pool to provide assistance I

as required to the emergency organization.

5.4 The OSF Staff will perform emergency repairs and modifications as directed by the SAD.

~

l l

~

iflSCONSf H PUBLIC SERVICE CORPORATION l

NO.

EP-OSF-3 REY. A I

Kewaunee Nuclear. Power Plant l TITLE: Work Requests during an l

Emergency EMERGENCY PLAN IMPLEMENTING PROCEDURE i

l s,

l DATE: JMI 151982 lPAGE 1 of 4 i

REVIEWED BY

  1. f/ruw /#.I8au/4J APPROVED BY 8M o/

I I

1.0 PURPOSE r

The purpose of this procedure is to describe the requirements and processing of Work Requests in a declared Emergency condition.

2.0 APPLICABILITY i

This procedure is applicable to all situations requiring corrective maintenance during emergencies at the Kewaunee Nuclear Power i

Plant.

NOTE: Normal plant administrative control directives should.be used if time and conditions permit (see ACD 5.4).

Once the emergency conditions are terminated or recovery operations initiated, this procedure is not applicable.

3.0 REFERENCES

3.1 ACD 5.4, Work Request 3.2 EP-TSC-4, Emergency Design Change, Major Equipment Repair l

4.0 PRECAUTIONS 4.1 All work performed should follow the guidelines of the WPS Safety Rule Book.

4.2 All work performed must have prior approval of the Shif t Supervisor /

Event Operations Director (E0D) prior to commencing.

4.3 Any changes to maintenance precedures must be approved by the SAD and j

the Shift Supervisor /EOD.

1 5.0 RESPONSIBILITIES 5.1 Emergency Response Personnel

~

5.1.1 Any individual within the einergency response organization who recognizes a prcDien that needs corrective maintenance action, is responsible for informing his supervisor (originating super-(..

visor) of the problem.

- + -.

4 g

WISCONSIN PUBLIC SERVICE CORPORATION l

NO.

EP-OSF-3 I

Kewaunee Nuclear Power Plant l TITLE: Work Requests during an l

Emergency f

l.

J4ERGERCY PLAN IMPLEMENTING PROCEDURE l

l

\\

l DATE: JM 151982 l PAGE 2 of 4 I

I l

5.1.2 The originating supervisor is responsible for investigating the problem and ensuring that the problem is accurately described on a Maintenance Work Request (MWR).

5.2 Support Activities Director (SAD)

The SAD coordinates the maintenance work request program during emergencies to ensure all the necessary requirements (plant mode, materials, Radiation Work Permit, Emergency Design Change) are fulfilled prior to work commencing, during work performance, and upon work completion.

5.3 Maintenance Department Supervisors i

The Group Supervisor ensures that the maintenance action is performed correctly and documented.

5.4 Maintenance Department Personnel l

Maintenance Department Personnel are responsible for performance of maintenance required during the emergency.

N 5.5 Shift Suoervisor/ Event Operations Director The Shif t Supervisor / Event Operatons Director reviews maintenance actions to ensure that the plant safety level is not degraded.

5.6 Technical Support Center Director The Technical Support Center Director reviews maintenance actions for safety, licensing, and quality control considerations.

6.0 REQUIREMENTS 6.1 Emergency Response Personnel l

6.1.1 Recognize problem needing emergency maintenance action.

6.1.2 Inform their supervisor or the SAD of the problem and describe the required emergency maintenance action needed.

6.2 Support Activities Director 6.2.1 Designate the appropriate Maintenance Group Supervisor (i.e.

electrical, mechanical I & C) responsible for the work and

(-

l retest requirements, if known.

i

t I

WISCONSTN PUBLIC SERVICE CORPORATION l

NO.

EP-OSF-3

~l Kewaunee Nuclear Power Plant l TITLE: Work Requests during an 1

Emergency

(

. EMERGENCY PLAN IMPLEMENTING PROCEDURE l

l

('

l DATE: JM 151982 l

PAGE 3 of.4 1

6 2.2 Ensure problem is accurately described on MWR form.

l l

6.2.3 Determine requirements necessary to perfom job.

I a.

If a design change is required, an Emergeticy Design Change (EDC) ' Request shall be initiated by requesting supervisor I

and forward to the Technical Support Center Director in I

accordance with EP-TSC-4, prior to starting work.

I l

b.

List under " Comments" section references that must be used in I

performing emergency maintenance action. Add additional i

l reference listings as necessary.

l l

c.

Route copy 6 to the TSCD, retain copy 5.

I 1

6.2.4 Ensure that the Emergency Director (ED) and EOD understand the l

possible effects on plant conditions and/or parameters that l

I may occur due to the performance of this maintenance.

l l

6.2.5 Schedule the emergency maintenance work.

I 6.3 Maintenance Department Supervisors l

l 6.3.1 Brief maintenance personnel on plant conditions and potential l

hazards prior to commencing work.

I 1

6.3.2 For work in controlled areas, contact the Radiological Protection l

Director (RPD) to brief personnel on radiological conditions I

and potential hazards prior to commencing work.

I l

6.3.3 Route the completed MWR back to the SAD.

I l

6.4 Maintenance Department Personnel I

l 6.4.1 Obtain Shift Supervisor's/E00's approval prior to starting l

work. He retains copy 4.

I l

6.4.2 If the job covers a QA Type I exiponent, notify Tech Support 1

Center staff prior to starting work for possible QC support.

l l

6.4.3 Follow all procedural precautions and RWP instructions.

I

i dY 1

I WISCONSIN PUBLIC SERVICE CORPORATION l

NO.

EP-OSF-3 g

Kewaunee Nuclear Power Plant l TITLE: Work Requests during an l

Emergency 4

^

AERGENCY PLAN IMPLEMENTING PROCEDURE I

i l DATE: JAN 151982

-l PAGE 4 of 4 l

l l

6.5 Shift Supervisor Event / Operations Director I

l 6.5.1 Review MWR for retest requirements and so designate if known.

I t

l 6.5.2 Determine and initiate system lineups and tagouts required to I

do the job safely.

l l

6.6 Support Activities Director (After Work Completion)

I i

l 6.6.1 Check to ensure maintenance actions performed and documented I

correctly.

I i

l 6.6.2 Immediately inform the Emergency Director that the MWR is I

completed.

I l

6.6.3 Retain all MWR's until the emergency has been terminated or i

l recovery operations implemented, af ter which all MWR's will be l

put into the normal MWR route for processing.