WISCONSIN PUBLIC SERVICE CORPORATION l  !!0. EP-ENY-3B REY. E i

I Kewaunee Nuclear Power Plant l TITLE: 81 Team Actions l I k~'N I i 1

EMERGEtCY PLAN IMPLEMENTING PROCEDURE

(\j l DATE: PAGE 1 of 8 M 21 E

^

l REVIEWED BY l%[/#4 ado m l APPROVED BY d yW

/ I I

1.0 APPLICABILITY In the event of a Site or General Emergency, Enviromental Monitoring Team (EMT) Members will be activated. The Emergency Response Manager (ERM) or Emergency Director may activate the team during an Alert if conditions warrant.

E.0 PRECAUTIONS _/'

~

2.1 Check td'see if all equipment is operational prior to use in the field.

2.2 Ensure-all protective clothing / devices are inspected for ca"= prior to use.

3.0 REFERENCES

,n,

/ \ 3.1 EP-ENV-2, SAF Activation b 3.2 EP-ENY-7, Site Access Facility Communications 4.0 INSTRUCTIONS 4.1 EMT Coordinator Actions -

4.1.1 Upon pager activation or notification of EOF activation, report to the Site Access Facility (SAF) and assume the responsibility of coordinating the environmental monitoring teams.

4.1.2 Establish a comunications link with the Emergency Operations Facility (EOF) or the Radiation Protection Office / Radiological Analysis Facility (RP0/RAF) per EP-ENV-7, Site Access Facility Communications.

4.1.3 Establish EM Teams as personnel errive at SAF and give them each .

I a letter- (i.e. A,B,) designation for radio communication purposes.-

1 Infom the Envirormental Protection Director (EPD) of the designations I of the EM Teams. ,

4.1.4 Direct En Teams to assemble the needed equipment for the appropriate type of field monitoring assigned the team.

4.1. 5 Ensure each Environmental Monitoring Team has the following equipment:

a. Respirator for each team member
b. Anti-contamination clothing 8310120216 830929 PDR ADOCK 05000305 F PDR

I I

WISCONSIN PUBLIC SERVICE CORPORATION l 1:0. EP-ENV-3B I

Kewaunee Nuclear Power Plant I TITLE: EM Team Actions EMERGENCY PLAN IMPLEMENTING PROCEDURE I i

V l DATE:

I JUN 211983 I PAGE 2 of 8 I

c. Dosintry (high and low range pocket dosimeters and TLD's) .
d. Hand held radiation detection equipment 4.1. 6 Ensure that each team has the equipment specified for the EMT kit-(Table ENV-3B).

4.1.7 Report to the EPD when a team is available and ready for assignment.

I 4.1.8 Upon order frm the EPD, direct the designated teams to the appro-1 priate sample locations and inform them of tha type and quantity of I samples to be obtained.

4.1.9 Maintain Radio Contact with the EM Teams at all times ,

NOTE: Contact should be made every 15 minutes.

4.1.10 Track the EM Teams locations on the Field Map and record sample times and locations using Form ENV-3B.2.

3

\ l 4.1.11 Periodically request radiological condition updates from EPD and pass this information to the field teams.

4.1.12 Have the EM Teams report their pocket dosimeter readings during communication contacts.

4.1.13 Record EM Team Member's pocket dosimeter readings on Form ENY-3B.I.

4.1.14 Verify operability of counting equipment has been completed per EP-ENV-5A, B and C (Counting Equipment Operating Procedures) and if not, perform applicable checks.

a. Commence counting samples on the appropriate analytical instrument as soon as field samples return.
b. Log results on the applicable Counting System Worksheet, .

and sample activities in the appropriate columns of the Radiological Environmental Monitoring and Sampling Worksheet, Fom ENY-38.2.

1 4.1.15 Report sample analysis results to the EPD. -

NOTE: Repeat all communications transmitted, to assure accurate C 'N transmission of data.

l

l

' I 1 NO. EP-ENV-3B

- WISCONSIN PUBLIC SERVICE Q)RPORATION i

Kewaunee Nuclear Power Plant l TITLE: Di Team Actions l

l l EMERGErCY PLAN IMPLEMENTING PROCEDURE l DATE: JUN 211983 I PAGE 3 of 8 I I 4.1.16 As EM Teams return, direct the team members to resupply their equipment and await further direction.

NOTE: Ensure they have performed appropriate personnel frisking for contamination.

4.1.17 At all times keep the EPD informed of EM Teams availability. '

4.2' EM Team Actions 4.2.1 Report to the SAF and assume the responsibilities for conducting environmental monitoring.

4.2.2 Obtain personnel TLD and High and Low Range Pocket Dosimeters.

4.2.3 Assemble proper equipment and check for satisfactory operation in accordance with EP-ENV-4A, B, and C; Sample Acquisition Procedures.

f'; 4.2.4 When equipment is assenbled and operation checks have been completed,

! j report to the EMT Coordinator for direction and assignment.

4.2.5 Perform the following upon assignment from the EMT Coordinator:

a. Load equipment into the designated vehicle.
b. Check communications with EMT Coordinator by contacting the SAF:
1. Approximately every 15 minutes,
2. Any time that an increase of 4 times gtneral area radiation reading is found,.
3. Any time there is any confusion as to the dispatch order l

or whenever clarifying infonnation is needed. ,

c. Proceed to the designated area, obtaining general area radiation I

readings during transit and record readings in tog Book as weil I l as reading location.  :

d. Report to SAF by radio upon arrival at the designated monitoring site.

j

{ )

v

.. l

.. NO. EP-ENV-33 1

WISCONSIN PUBLIC SERVICE CORPORATION I

Kewaunee Nuclear Power Plant l TITLE: EM Team Actions l

l 1 (O- EMERGEtEY PLAN IMP!.EMENTING PROCEDURE 1 DATE:

1 JUN 211983 1 PAGE 4 of 8 I

e. Acquire the samples and readings as directed by the' EMT Coordinator, in accordance with EP-ENV-4A, B, and C, Sample Acquisition Procedures.

NOTE: Beta / Gamma measurements for the purpose of Plume Tracki'ng should be made over an approximately 30 second time . ..~.

span at approximately 3 to 4 feet above the ground.

I ' In the same location measurements at approximately 6 inches above the ground should be taken. If the 6 inch reading is lower in magnitude than the 4 foot measurement, the assumption should be that the predominant radiation source is the airborne Plume, and this should be noted and reported to the SAF (EMT Coordinator).

f. Maintain accurate records of samples taken and the time acquired.
7. When all samples have been collected, contact SAF by radio, and report conpletion. If no further samples are ordered at the present location, request direction from the EM Team Coordinator.

! 4.2.6 Upon return to the SAF, perform the following steps:

. a. Take collected samples to SAF monitoring station before transporting to counting room.

b. Decontamination instructions, if necessary, should be obtained from site RET Member.

NOTE: Care must be taken to prevent contaminating the entire SAF Area when teams rettrn to SAF from the field.

4.2.7 Replenish supplies.

4.2.8 Report to the EM Tean coordinator when ready for redeployment.

5 .

e 4

?._. . _ - _ - - - - . _ . _ - - _ - _ _ . _ _ _ . _ . . . - - _

: < i l  :' ;l l  : r llIIl1IIIIIIII iIIIIi!IIlIIIIIIII G

N EI MD IA TE k II iI I! 1I II iI iI JS Il i1 il II iI II iI li II G

N

%fo 1

EI MD V 25 I A N TE -

Emg e R iI II II iI Ii II iI II II iI iI 1I II II II

- II P qa G E P N EI MD I A TE '

R lI

Il II iI II II Ii II ii II II iI II iI iI iI -

E G '

T N .

A EI D MD IA TE _

R ii II iI II II iI II iI iI II II II iI II Il II ,

G N .

EI .

MD IA TE 4' G R II II II ii II iI II iI II II I1 1I O il 1l iI II L G -

N '

G EI '

N hD '.

I IA K TE R

C II II iI II II II iI I1 1I I1 1I A II iI iI II II R G T N EI G MD -

1 N IA e' I TE 8 D R II II 1I ii II iI 1I iI lI 1I Il iI 3 A il iI iI II

)- - E G N V R N N EI E R MD -

E IA M T TE _

R E R 1I ii II iI 1I 1I II i1 il iI O M Il iI iI II 1I II F I G S N O EI D MD -

IA .'

M TE A R 1I iI II iI II iI 1I 1I il ii iI II E Il iI II II T G N

M EI E MD IA TE R iI II iI iI II II Ii iI 1I 1I i1 il II I1 Il RO '

EN .

T EL MA II -

5R OE DS ii II Ii II 1I iI Ii iI iI 1I ii Ii II II ;

II II ME AD "

EO TC Il II II i1 I.i Il 1I 1I iI II II tI iI ii Il II

)/

. E

  1. M A

N

)II lllIIIl11lIilI111l!I1IIIlI1i1

< ' s1!  ;  ! ~ ' 4i1ill<' ,l!: li  !!:  ! :l  : 4!  ;!

i

IlliIIIIlIIIiIiiIiiIiIIIIilIlIII G

N EI MD IA IE R

8 Il Ii II II iI II iI il II iI ii II II iI II II G

f N 31o EI YZ6 MD IA _

N TE ENe R Ug 1l II II II iI I I iI II II iI iI iI II iI II II P JaP G E N EI MD IA TE R a

il II II II iI II i1 il II iI iI iI II II II II E G T N A EI .

D MD .

IA IE R

Il II II II iI II I1 Ii II iI iI II II II II lI G

N EI MD IA TE G R O il II II II II IIlI iI II 1I iI iI II II II II L G N

G EI N MD I IA K IE C R A II II II II i II ii Ii II iI iI ii II II II iI R G T N EI G MD 2 N IA I IE

/ 8 D R 3 A iI II II II il lI il ii I1 II II Il II II II i1

- (

UY N E

- E R

R EI MD G

N

- E IA M T TE R E R O M Il II II II Ii iI ii iI I1 il II Ii II II II i1 F I G S N O EI D MD IA M TE A R E il II II II ii iI Ii iI Ii il Il ii II II II Il T G N

M EI E MD IA TE R

Il II II II iI II il iI II ii il iI II II II Il RO EN T

_ EL MA II 5R 0E e DS

_ 1l I1 II II lI II ii iI II ii ii iI II 1I II Il 4E ND

_ EO

_ TC II I1 ;I II iI II Ii Ii II ii II iI II 1I I1 Il 3j p E M

A N

llll1IIIIiIIIiIiII IIII IIll I1Il

'EP-ENV-3B JUN 211983 Page 7 of 8 f'^

TABLE ENV-3B SAF E M TEAM KIT INITIALS

  • 1 PRM 7 uR meter ,
  • 1 FIC 6A ion chcmber i-

'~~

  • 1 E530 with HP-190 probe & survey tube _
  • 1 RAP-1 Lo Volune Sampler .

~

  • 1 RAP-1. Sample. Jumper _
  • 1 Staplex Hi Vol Sampler .
  • 1 Hi Band Two-way Radio _
  • 1 Emergency Generator 1 Flashlight with Batteries ~~_

A

    • 2 Full-face Masks With Particulate Cartridges 1 Stopwatch (Pocket Watch) _

1 Calculator 4 Marinelli Beckers in Plastic Bags _

12 Silver Zeolite cartridges' 12 4" Particulate Filters .

12 2" Particulate Filters 41 liter wide mot.th poly bottles filled with water _ ,

1 Pkg Swipes _,

1 Pkg Sample Labels 4 Garden Trowels l 3 Grass clippers _ _ ,_

16' Measuring Tape 4 Funnels __

4 Ladles

  • EP-Elly-3B UN 211933 y? age 8 of 8 TABLE ENV-3B (cont'd)

SAF E M TEAM KIT ,

3NITIALS 2 dz Small Ziplok Bags 10" x 12" _

2 dz poly bags 12" x 18", Clear .

- ~ :-~ -. .

3 Tweezers ___ _

1 Reflective Vests 4 Poly Bags, 33" x 40", yellow ____

1 Set EMT Area Maps (large sector map) .

2 Clipboards ,

1 Set Pens & Pencils i 12 pr Gloves & Liners 6 pr Canvas Booties i

i roll Tuck Tape _ ,

1 book of ENV Procedures and Spare Forms (EP-ENV-1, 2, 3B, 4A, 4B, 4C, SE & 7)

'b ,

  • NOT LOCATED IN SEALED TRUNK 3 -

p,y *--------w.w-gw-g+r,----e---- rq-g-