MONTHYEARML20117L7271996-09-0505 September 1996 Proposed Tech Specs 4.2-2 Re Steam Generator non-repaired Tube Insp & 4.2-3 Re Steam Generator Repaired Tube Insp ML20092K8131995-09-19019 September 1995 Proposed Tech Specs,Providing Revs to Clarify Purposes to Maintain Accuracy of TS & Reflect Revs to 10CFR20, Stds for Protection Against Radiation ML20091P1041992-01-27027 January 1992 Proposed Tech Specs Re Steam Generator Tube Sleeving ML20205H3401987-01-12012 January 1987 Rev 3 to Reactor Test Program,Kewaunee Nuclear Power Plant ML20125B4491985-05-31031 May 1985 Plant,Cycle II Startup Rept,May 1985 ML20108F4791984-08-20020 August 1984 Suppl to Kewaunee Nuclear Power Plant 1984 Integrated Leak Rate Test Rept ML20092K4191984-06-30030 June 1984 Cycle 10 Startup Rept,June 1984 ML20080B9871984-01-12012 January 1984 Emergency Plan Implementing Procedure EP-TSC-7, Reactor Vessel Head Venting Time Calculation ML20080B9721984-01-12012 January 1984 Rev B to Emergency Plan Implementation Procedure EP-RET-3C, Post-Accident Operation of High Radiation Sample Room ML20083F7161983-10-27027 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078L5791983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078F4801983-08-16016 August 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual event,EP-AD-8 Re Notification of Alert & EP-AD-9 Re Notification of Site Emergency ML20077Q0481983-07-26026 July 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-ENV-8 Re Total Population Dose Estimate calculations,EP-RET-5 Re Plume Projection & EP-RET-6 Re Dose Projection ML20077B6001983-07-15015 July 1983 Cycle 9 Startup Rept for June 1983 ML20078G4201983-06-21021 June 1983 Rev D to Procedure EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data) ML20078G4431983-06-21021 June 1983 Rev a to Procedure EP-RET-3D Containment Air Sampling Analysis Using Casp ML20078G4371983-06-21021 June 1983 Rev B to Procedure EP-ENV-3H Protective Action Recommendations ML20078G4331983-06-21021 June 1983 Rev D to Procedure EP-ENV-3G Manual Projection Calculation ML20078G3681983-06-21021 June 1983 Rev H to Procedure EP-ENV-3A Environ Protection Director Actions & Directives ML20078G4061983-06-21021 June 1983 Rev E to Procedure EP-ENV-3E Manual Determination of X/Q (Knpp Meteorological Data) ML20078G3981983-06-21021 June 1983 Procedure EP-ENV-3D Primary Determination of Meteorological Data ML20078G3941983-06-21021 June 1983 Procedure EP-ENV-3C Primary Dose Projection Calculation - Ibm Personal Computer ML20078G3501983-06-21021 June 1983 Rev C to Procedure EP-AD-11 Emergency Radiation Controls ML20077E0041983-06-21021 June 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-11 Re Emergency Radiation Controls & EP-ENV-3A Re Environ Protection Director Actions ML20078G3781983-06-21021 June 1983 Rev E to Procedure EP-ENV-3B EM Team Actions ML20069J5071983-03-10010 March 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Class Determination & EP-AD-11 Re Emergency Radiation Controls ML20069F8351983-03-0101 March 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedure EP-SEC-2, Security Force Response to Emergencies. Revised Table of Contents Encl ML20028D4811983-01-0303 January 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. Revised Index Encl ML20066E2691982-10-13013 October 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-2 Re Emergency Class determination,EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20062E0801982-07-0202 July 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. Revised Index Encl ML20058F6741982-06-18018 June 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room ML20054F3961982-05-21021 May 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use ML20052H8421982-04-16016 April 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20052B1051982-03-19019 March 1982 Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. Revised Index Encl ML20042B2491982-02-18018 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation.Revised Index Encl ML20049H4151982-01-29029 January 1982 Public Version or Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Sam II Operation & EP-EOF-4 Re Corporate Response to Alert.Revised Index Encl ML20040F9781982-01-15015 January 1982 Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency.Revised Table of Contents Encl ML20039H1491981-12-21021 December 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-3 Re Unusual Event & EP-AD-4 Re Notification of Unusual Event ML20038C3821981-10-21021 October 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Classification Determination & EP-AD-3 Re Unusual Event ML1116601091981-08-0707 August 1981 Proposed Amend 46 to Tech Specs 3.4,3.10,Table 3.1-2,Figures 3.1-1,3.1-2,3.10-7 & Pages 3.1-2,3.1.2a,3.1.2b,3.1-2,3.1-3, 3.1-6,3.1-7,4.2-2a,4.2-8 & 6-2 for Pressure Safety Isolation Valves & Normal Operation Heatup/Cooldown Limits ML20038A5641981-07-0101 July 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation ML20038A5761981-06-0303 June 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure ML20038A5631981-03-31031 March 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Acd 12.1 Re Emergency Organizational Structure,Acd 12.3 Re Unusual Event Notification & Acd 12.4 Re Alert ML20038A5661981-02-27027 February 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation & Public Info Plan ML19210C9981979-11-16016 November 1979 Proposed Amend 41 to Tech Specs,Changing Limit for Reactivity Anomalies for Comparison of Measured to Predicted Boron Concentrations to 1% Reactivity ML19256E0081979-10-19019 October 1979 Proposed Tech Spec Amend 40,adding Fire Protection Sys Committed to in Amend 23,deleting Mods Required as License Condition,Adding 5-man Fire Response Requirements & Correcting Inconsistencies 1996-09-05
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205H3401987-01-12012 January 1987 Rev 3 to Reactor Test Program,Kewaunee Nuclear Power Plant ML20080B9721984-01-12012 January 1984 Rev B to Emergency Plan Implementation Procedure EP-RET-3C, Post-Accident Operation of High Radiation Sample Room ML20080B9871984-01-12012 January 1984 Emergency Plan Implementing Procedure EP-TSC-7, Reactor Vessel Head Venting Time Calculation ML20083F7161983-10-27027 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078L5791983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078F4801983-08-16016 August 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual event,EP-AD-8 Re Notification of Alert & EP-AD-9 Re Notification of Site Emergency ML20077Q0481983-07-26026 July 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-ENV-8 Re Total Population Dose Estimate calculations,EP-RET-5 Re Plume Projection & EP-RET-6 Re Dose Projection ML20078G3981983-06-21021 June 1983 Procedure EP-ENV-3D Primary Determination of Meteorological Data ML20078G4431983-06-21021 June 1983 Rev a to Procedure EP-RET-3D Containment Air Sampling Analysis Using Casp ML20078G4371983-06-21021 June 1983 Rev B to Procedure EP-ENV-3H Protective Action Recommendations ML20078G4331983-06-21021 June 1983 Rev D to Procedure EP-ENV-3G Manual Projection Calculation ML20078G4061983-06-21021 June 1983 Rev E to Procedure EP-ENV-3E Manual Determination of X/Q (Knpp Meteorological Data) ML20078G3941983-06-21021 June 1983 Procedure EP-ENV-3C Primary Dose Projection Calculation - Ibm Personal Computer ML20078G3781983-06-21021 June 1983 Rev E to Procedure EP-ENV-3B EM Team Actions ML20078G3681983-06-21021 June 1983 Rev H to Procedure EP-ENV-3A Environ Protection Director Actions & Directives ML20078G3501983-06-21021 June 1983 Rev C to Procedure EP-AD-11 Emergency Radiation Controls ML20077E0041983-06-21021 June 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-11 Re Emergency Radiation Controls & EP-ENV-3A Re Environ Protection Director Actions ML20078G4201983-06-21021 June 1983 Rev D to Procedure EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data) ML20069J5071983-03-10010 March 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Class Determination & EP-AD-11 Re Emergency Radiation Controls ML20069F8351983-03-0101 March 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedure EP-SEC-2, Security Force Response to Emergencies. Revised Table of Contents Encl ML20028D4811983-01-0303 January 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. Revised Index Encl ML20066E2691982-10-13013 October 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-2 Re Emergency Class determination,EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20062E0801982-07-0202 July 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. Revised Index Encl ML20058F6741982-06-18018 June 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room ML20054F3961982-05-21021 May 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use ML20052H8421982-04-16016 April 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20052B1051982-03-19019 March 1982 Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. Revised Index Encl ML20042B2491982-02-18018 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation.Revised Index Encl ML20049H4151982-01-29029 January 1982 Public Version or Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Sam II Operation & EP-EOF-4 Re Corporate Response to Alert.Revised Index Encl ML20040F9781982-01-15015 January 1982 Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency.Revised Table of Contents Encl ML20039H1491981-12-21021 December 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-3 Re Unusual Event & EP-AD-4 Re Notification of Unusual Event ML20038C3821981-10-21021 October 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Classification Determination & EP-AD-3 Re Unusual Event ML20038A5641981-07-0101 July 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation ML20038A5761981-06-0303 June 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure ML20038A5631981-03-31031 March 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Acd 12.1 Re Emergency Organizational Structure,Acd 12.3 Re Unusual Event Notification & Acd 12.4 Re Alert ML20038A5661981-02-27027 February 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation & Public Info Plan 1987-01-12
[Table view] |
Text
.
, Page 1 of 5 ,
REY. March 19,1982 EMERGENCY. PLAN IMPLEMENTING PROCEDURES
-Index-
)
. Procedure # TITLE -
REVISION DATE EP-AD-1 Plant Emergency Organization B 01-22-82 EP-AD-2 Emergency Class Determination A 10-21-81 EP-AD-3 Unusual Event A 12-21-81 EP-AD-4 Alert ,
A 12-21-81 EP-AD-5 Site Emergency -
A 12-21-81 1
EP-AD-6 General Emergency ,
A 12-21-81 EP-AD-7 Notification of Unusual Event B 12-21-81 EP-AD-8 Notification of Alert . B 12-21-81 EP-AD-9 Notification of Site Eme'rgency B 12-21-81
~
EP-AD-10 Notification of General Emergency B 12-21-81 4
EP-AD-11 Emergency Radiation Controls A 12-21-81 5P-AD-12 Personnel Assenbly and Accountability A 12-21 EP-AD-13A Limited Area Evacuation 12-21-81 EP-AD-13B Emergency Assently/ Evacuation 12-21-81 EP-AD-13C Site Evacuation 12-21-81 EP-AD-14 Search and Rescue 12-21-81 EP-AD-15 Recovery Planning 10-21-81 EP-AD-16 Personnel Injury or Vehicle Accidents 12-21-81 EP-AD-17 Communications - 12-21-81 EP-AD-18 Adninistration of Iodine Blocking Agents 12-21-81 EP-ENY-1 Environmental Team Organization A 12-21-81 EP-ENY-2 Site Access Facility (SAF) Activation A 12-21-81 saseeeeee-s2e++e C7 * "" ;::;& 3&G ,
CK.'
82 04 3000R
March 19,1982
, - Page 2 of 5 ,
i -
EMERGENCY PLAN IMPLEMENTING PROCEDURES '
-Index-(cont'd) .
Procedure # TITLE REVISION DATE EP-ENY-3A Environmental Protection Director Actions and Directions -
C 02-18-82 EP-ENY-3B Environmental Monitoring Team Actions B 02-18-82 EP-ENV-3C Primary Determination of X/Q 12-21-81 EP-ENY-3D Altern' ate Determination of X/Q . 1,2-21-81 EP-ENY-3E Manual Environmental ' Dose Projection B 02-18-82 C'alculations EP-ENY-3F Protective Action Recommendations 12-21'-81 Sample Acquisition, Portable Instrumentation Use EP-ENY-4A A 12-21-81 EP-ENV-4B Sample Acquisition, Air Monitoring Devices A 12-21-81 EP-ENY-4C Sample Acquisition, 5nvironmental .
Sampling Techniques A 12-21-81 EP-ENV-5A LCS-1 Operation A 12-21-81 EP-ENY-5B MS-3 Operation A 12-21-81 EP-ENY-SC SN4 II Operation B 01-22-82 EP-ENY-5D PAC-4G Operation A 12-21-81 EP-ENV-5E Reuter-Stokes Operation 8-19-81 EP-ENY-6 Data Analysis, Dose Projections and Protective Action Recommendations DELETED EP-ENY-6A Relocation of Site Access Facility (Habitabili ty) 12-21-81 l EP-ENY-6B SAF Environmental Sample Analysis Relocation 12-21-81 l
EP-ENY-7 Site Access Facility Communications ,
12-21-81 EP-ENY-8 Total Population Dose Estimate 12-21-81 2-b
.- March 19,1982
EMERGENCY PLAN IMPLEMENTING PROCEDURES .
-Index-(cont' d)
Procedure # TITLE REVISION. DATE EP-EOF-1 Corporate Staff Emergency Response Organization C 02-18-82 EP-EOF-2 Emergency Operations Facility (EOF) Activation C 02-18-82 EP-EOF-3 Corporate Response to an Unusual Event C 02-18-82 EP-EOF-4 Corporate Response to an Alert .. C 02-18-82 EP-EOF-5 Corporate Response to a Site Emergency C 02-18-82 EP-EOF-6 Corporate Response to a General Emergency C 02-18-82 EP-EOF-7 Communications and Documentation C 02-18-82 EP-EOF-8 Relocation of E0F B 02-18-82 EP-EOF-9 Interface with Support Organi'zations B 02-18-82 EP-0P-1 Control Room Emergency Organization 12-21'-81 EP-0P-2 Emergency Activation of Control Room A 2-18-82 EP-0P-3 Control Room Communications 12-21-81 EP-OSF-1 Operational Support Facility (OSF) ONganization A 1-15-82 EP-OSF-2 OSF Activation 12-21-81 EP-0SF-3 Work Requests During an Emergency A 1-15-82 EP-OSF-4 OSF Communicat, ions 12-21-81 -
EP-RET-1 Radiation Emergency. Team (RET) Organization B . 12-21-81 l EP-RET-2 Inplant RET B 12-21-81
-[Page 4 of 5
'Na'r ch 19,1982
,_s EMERGENCY PLAN IMPLEMENTING PROCEDURES 5 -i - -Index-(cont' d)
TITLE REVISION DATE Procedure 8 EP-RET-2A RP0/RAF Activation A 12-21-81 EP-RET-2B Gaseous Effluent Sample and Analysis B 02-18-82 EP-RET-2C Containment Air Sampling and Analysis A 12-21-81 EP-RET-2D Emergency Radiation Entry, Controls and A 12-21-31 Implementation EP-RET-2E Handli~ng of Injured Personnel 12-21-81 EP-RET-2F Personnel Decontamination A 3-19-82 EP-RET-3 Emergency Chemistry Team ,
B 12-2,1-81 EP-RET-3A Liquid Effluent Sample a~nd Analysis A 12-21-81 ,
EP-RET-3B Post-Accident ReactoreCoolant Interim A 1 2-21-81 Sampling Procedure .
t EP-RET-4 Site RET B 12-21-81
~
EP-RET-4A EOF Radiological Monitoring A 10-21-81 -
EP-RET-4B Radiological Controls at Site Access Facility (SAF) .
10-21-81 EP-RET-4C Site Radiological Monitoring 12-21-81
~
EP-RET-5 Plume Projections A 12-21-81 EP~-RET-5A Plume Projections (Backup Method) A 12-21-81 EP-RET-6 Dose Projection A 17.-21-81 EP-RET-7 RAF/RP0 Communications 12-21-81 EP-RET-8 Contamination ' Control at the TWo Rivers 12-21-81 Community Hospital WWWWWWWWWWWWWWWWWW6 9
~ _ _ _ _ _ _ _ - _ . _ _ . _ . _ , . . . , _ , _ . _ . _ . _ . _ _ _ _ . , , _ _ _ . . _ , _ _ . . - _ _ _ ,. _ __ _ _ _ _ _ _ _ _
o , Page 5 of 5 ,
March 19,1982 EMERGENCY. PLAN IMPLEMENT 2NG PROCEDURES
-Index-
)
l - (cont' d) ,
Procedure # TITLE REVISION DATE EP-SEC-1 Security Organization 12-21-81
~
EP-SEC-2 Security Force Response to Emergencies A 12-21-81 EP-SEC-2(a) Manual Activation of Emergency Sirens 1-29-82 EP-SEC-3 Personnel Accountability (Initial and Maintaining) A 12-21-81 EP-SEC-4 Dosimetry Issue at SAF 12-21-81 EP-TSC-1 Technical Support Center (TSC) Organi.zation 12-21-81 EP-TSC-2 TSC Activation A 02-18-82 .
EP-TSC-3 Plant Status Procedure A 02-18-82 EP-TSC-4 Emergency Design Change, Major Equipment Repair 12-21-81' EP-TSC-5 TSC Communications 12-21-81 e
t
., j -
', . WISCONSIN PUBLIC, SERVICE CORPORATION .l NO. EP-RET-2F REY. A I
Kewaune? Nuclear Power Plant i TITLE: Personnel Decontamination l
EMERGENCY PLAN IMPLEMENTING PROCEDURE 1 I l' DATEMAR 191982 l PAGE 1 of 4 I I i
REVIEWED BY
/M" APPROVED BY ,[ ,[
/ l 1.0 APPLICABILITY This procedure shall be implemented by the In-Plant and Site Radiation Emergency Teams (RET) whenever contamination of hands, general body, hair, mouth, or nostrils l is encountered as indicated by an alirm on ther personnel frisker or mouth or l nasal swabs above background levels. ,
2.0 PRECAUTIONS ,
l 2.1 The personnel frisker alarm should be set at 100 cpm above background.
2.2 Personnel decontamination, other than minor hand contamination, will be carried out oo.y under the direction of a Radiation Technologist. ,
2.3 In no case shall personnel with moutih or nasal contamination be permitted to eat, drink, or smoke, until approved by the Radiological Protection Diiector. The medical consultant will be contacted for all mouth or eye contamination problems.
3.0 REFERENCES
None ,
4.0 INSTRUCTIONS 4.1 Minor Hand Contamination l 4.1.1 Instruct the contaminated person to wash for not less than 2 minutes, l nor more than three minutes with Decon Hand Soap in tepid water.
Give special attention to areas between the fingers and around the i finger nails.
4.1.2 Re-s,urvey the contaminated area and repeat 4.1.1 as necessary, taking care not to break' the skin or spread contamination. Do not exceed three or four. times. N 4.2 Heavily Contaminated Hands NOTE: This method should be used only if Step 4.1 has been unsuccessful .
4.2.1 Scrub the . hands with a soft brush using a heavy lather and tepid water. Instruct the contaminated person to wash for not more than 2 minutes each time. Thorough rinses shall be done between scrubs.
4.2.2 Do not exceed three scrubs and take care not to abrade the skin.
Re-survey for further evaluation after each scrub. Apply lanolin or hand cream to prevent chapping.
- I
~ WI5CONSIN PUBLIC SERVICE CORPORATION ' NO. EP-RET-2F
~
l Kewaunee Nuclear Power Plant l TITLE: Personnel Decontamination
. I EMERGENCY PLAN IMPLEMENTING PROCEDURE 1. 1 i PAGE 2 of 4 DAT[dAR 1 9 1982 4.3 Titanium Dioxide 4.3.1 This method shall only be used with approval of the Radiological Protection Director (RPD).
4.3.2 Apply a liberal portion of titanium dioxide, a mild abrasive, in a water paste to the hands. Work this paste over contaminated area for at least 2 minutes. Use water sparingly to keep paste moist.
Rinse with tepid water and follow by washing thoroughly with soap, brush, and water. Be sure no paste is allowed to remain around the nail s. Re-survey and repeat as necessary.
4.4 Potassium Permanganate 4.4.1 This method shall only be used with approval of the Radiological Protection Director.
4.4.2 Mix equal volumes of a saturated solution of potassium permanganate (6.4gKMn04 to 100 ml water) and 0.2N sulfuric acid. Pour this over
- the wet hands rubbing the entire surface and using a soft hand brush for not more than two minutes. (NOTE: This application will remove a layer of skin it allowed to remain in contact with the hands too long; consequently, the times stated here should not be exceeded for any single application). Rinse with tepid water.
4.4.3 Apply a fresh Si, (5gNaHS03 to 100 ml water) solution of sodium acid sulfite (NaHS03) in the same manner as described above, using a hand brush and tepid water for not more than two minutes. (NOTE: This will remove the permanganate stain and skin layer if in contact with skin more than two minutes.) Rinse thoroughly and wash with soap and water.
1 4.4.4 Th.is pr,ocedure may be repeated several times, as long as the permanganate solution is not applied for more than two minutes during one washing.
l 4.4.5 Applications to other parts of the body may be facilitated, by the use of swabs or pads dipped in the solutions. (Use gloves when handling swabs or pads.) Lanolin or hand cream should be applied ,
after washing. DO NOT use near face or other body openings.
4.5 General Body Contamination 4.5.1 Instruct the contaminated person to shower in the " hot sh.ower" room.
Scrub contaminated parts of body with decon soap starting at the neck and working toward the lower extremities. Local areas of contamination will be dealt with as described in Section 3.3 and 3.4 above.
4.5.2 Save all towels, wash rags, etc., so they can be checked for contamination.
O
a l .
- WISCONSIll PUBLIC SERVICE CORPORATIO!! l NO. EP-RET-2F I
K;waunce fluclear Power Plant l TITLE: Parsonnel Decontamination I
. EMERGENCY PLAN IMPLEMEllTING PROCEDURE I I l' DATEMAR 191982 l PAGE 3 of 4
. I I 4.6 Hair Contamination 4.6.1 Instruct the contaminated person to wash hair in a sink with shampoo.
Do not use the shower for hair decontamination, as contamination can be spread to the rest of the body.
4.6.2 Check face and neck, as well as hair, for contamination. Repeat as required.
4.7 Mouth Contamination .
4.7.1 Flush
- the mouth with tap water. Ass'ume a-bent position to prevent swallowing the water. Do not allow the person to " gargle" the water.
4.7.2 Check the face, nasal areas, and throat for contamination.
4.7.3 Whole body count the ' individual to insure contamination is removed and has not spread to the G-1 tract. ,
4.7.4 . Cases of persistent contamination should be referred' to a physician trained in radiological emergencies.
4.8 Nasal Contamination 4.8.1 Instruct the person to blow his. nose repeatedly. Save the tissues for counting.
4.8.2 Dampen swab (one for each nostril'), insert carefully as far as possible, and then withdraw swab, twirling it inside of the nostril as it is withdrawn. Repeat until the swab shows no detectable activity.
l Run a swab on the GeLi for isotope identification.
4.8.3 Cases of persistent contamination should be referred to a physician trained in radiological emergencies.
4.9 Eye Contamination
! 4.9.1 Irrigate eyes with Aliclear eye lotion (sterile, isotonic solution) l only. Assume a bent position to preclude contamination spread.
4.9.2 After contamination is no longer detected on the frisker or contamination persists, perform a stationary whole body count of the head area.
4.9.3 Cases of persistent. contamination should be referred to a physician trained in radiological emergencies, j 4.10 Persistent Extremity Contamination 4.10.1 Place the bare hand or foot in a rubber or plastic glove or booty.
l Tape all openings shut.
T c l 7
~
.. 11SCONSIN PUBLIC SERVICE CORPORATION l NO. EP-RET-2F Kewaunee Nuclear Power Plant l TITLE: Pcrsonnel Decontamination I
~
EMERGENCY PLAN IMPLEMENTING PROCEDURE l- l
'! . I DAT51AR 191982 l PAGE 4 of 4 I I 4.10.2 Place near source of heat for 10 to 15 minutes or until the extremity is sweating profusely. Gloves can be worn for a few hours to utilize body heat.
4.10.3 As soon as the extremity is swea' ting profusely, remove covering and wash with soap and water immediately. Any delay will allow contamination to seep into the skin pores.
h I
4 4
e
--