REV.. Jdne.18, 1982

~

,. ' Page 1 of 5 EMERGEllCY PLAll IMPLEMEllTlftG PROCEDURES

-Index-

, -lq r y4

,99 Procedure #

TITLE

-REVISION D,gE,

(

. EP-AD-1 Plant, Emergency Organization B

01-22-82 EP-AD-2 Emergency Class Determination A'

1 0-21 -81 EP-AD-3 Unusual Event A

12-21-81 EP-AD-4 Alert A

1 2 81 I

EP-AD-5 Site Emergency A

12-21 -81 s

l EP-AD-6 General Emergency A

17-21-81 EP-AD-7 Notification of Unusual Event C

04-16-82 EP-AD-8 Notification of Alert '

C 04-16:82 EP-AD-9 Notification of Site Emergency C

04-16-82 a

EP-AD-10 flotification of General Emergency.

C 04-16-82

' M EP-AD-ll Emergency Radiation C~ontrols A

1 2-21 -81

. V

' EP-AD-12 Personnel Ksserbly and Accountability B

04-16-82 EP-AD-1-3A -

Limited Area Evacuation 12-21-81 EP-AD-13B Emergency Asseably/ Evacuation 1 2 81

.EP-AD-13C Site Evacuatjon 12-21-81 EP-AD-14 Search and Rescue' 1 2-21-81 EP-AD-15 Recovery Planning 1D-21-81 EP-AD-16 Personnel Injury or Vehicle Accidents 1 2-2i-81 EP-AD-17 Communications B

06-18-82 EP-AD-18 Administration of lodine Blocking Agents 12-21-81 EP-ENV-1 Environmental Team Organization A

12-21-81 EP-ENV-2 Site Access f acili ty (SAF) Act'iva t' ion A

l/-21-81 8208020192 820713 PDR ADOCK 05000305 F

PDR

~

~

June 18,1982 Page 2 of 5

~..

%,h EMERGEliCY PLAN IliPLEMENTING PROCEDURES

-index-(cont'd)

Procedure !

TITLE REVISION DATE EP-ENV-3A Environmental Protection Director Acticns and Directions D

04-16-82 EP-Ef;V-3B Environmental Monitoring Team Actions C

05-21-82

~

EP-ENV-3C Primary Detennination of.X/Q A

04-16-82 EP-E!4V-3D Alternate Determination of X/Q A

04-16-82 EP-ENV-3E Manual Environmental Dose Projection B

02-18-82 Calculations EP-El1V-3F Protective Action Recommendations 12-21-81 EP-ENV-4A Sample. Acquisition, Portable Instrumentation Use B

05-21-82 EP-EUV-4B Sample Acquisition, Air Monitoring Devices B

05-21-82

.4 M ' EP-ENV-4C Sample Acquisition, Environmental Sampling Techniques B

05-21-82 EP-ENV-5A LCS-1 Operation A

1 2-21-31 EP-ENV-5B MS-3 Operation A

12-21-81 EP-ENV-5C SAM 11 Operation B

01-22-82 EP-ENV-5D PAC-4G Operation A

12-21 -81

~

EP-ENV-5E Reuter-Stokes Operation 8-19-81 EP-ENV-6 Data Analysis, Dose Projections. and Protec~tive Action Recommendations DELETED EP-ENV-6A Relocation of Site' Access Facility (Habitability) 12-21-31 EP-EhV-6B SAF Environmental Sample Analysis Relocation 12-21-81 EP-ENV-7 Site Access Facility Commnications

,12-21-81 EP-ENV-8 Total Populat ion Dose Estimate 12-21-81

(

4j e

  • 6

June 18, 1982 Page 3 of 5 EMERGEl;CY PLAll RPLrMErlTIflG PROCEDURLi.

index-g3 k.,j.7 (cont'd)

~

Procedure #

TITLE REVISDVJ DATE EP-EOF _1 Corporate Staf f Emergency Response Organization f

06-18-82 EP-E0F-2 Emergency Operations Facility (E0F) Activation C

02-18-82 EP-E0F-3 Corporate Response to an thusual Event E

06-18-82 EP. EOF-4 Corporate Response to an Aiert E

06-18-82 EP-EOF-5 Corporate Response to a Site Emergency E

06-18-82 EP-EOF-6 Corporate Response to a General Emergency E

06-18-82' EP-EOF-7 Comiaunications and Documentation D

05-21-82

~

B 02-18-82 EP-EOF-8 Relocation of E0F EP-EOF-9 Interface with Support Organizations-C 04-16-82 3,p.a$,

-EP-CP-1 Control Roca Emergency Organization 1 2-21 -81 A

2-18-82 EP-CP-2 Emergency Activation of Control Room EP-OP-3 Control Roan Canmunications 12 81 1

EP-.0 S F-l' Operational Support Facility (OSF) Organizat. ion A

1-15 "2 EP-OSF-2 OSF Activation A

05-21-82 EP-OSF-3 Work Rettuests During an Emergency A

1-15-82 EP-OSF-4 OSF Comunications A

04-16-82 l

EP-REl-1 Radiation Emergency Team (RET) Organization 8

12-21-81 EP-RET-2 Inplant RET B

12-21-81

.wg F

j s.-

.-3'

~

~

Page 4 of 5 June 18,1982 EMERGEliCY PLAff liiPLEMEf4TIflG PROCEDURES

'~

~

.Index -

(cont'd)

Procedure #

TITLE REVIS10f4 DATE EP-RET-2A RP0/RAF Activation B

'.05-21-82 EP-RET-2B Gaseous Effluent Sample and Analysis B

02-18-82 EP-RET-2C Containment Air Sampling and Analysis A

1 2-21-81 EP-RET-2D Emergency Radiation Entry, Controls and A

12-21-81 Implementation EP-RET-2E Handling of injured Personnel 12-21 -81 EP-RET-2F Personnel Decontamination A

3-19-82 EP-RET-3 Emergency Chemistry Team B

12-21-81 EP-RET-3A Liquid Effluent Sample and Analysis

'A 12 81 EP-RET-3B Post-Accident ReactoreCoolant ~ Interim A

1 2-21-81 Sampling Procedure

@ [P-RET-3C Post Accident Operation of the High Radiation 7

Sample Room 06-18-32

.EP-RET-4 Site RET.

BJ 12-21-81

-EP-RET-4A EOF Radiological Monitoring A

'1 0 81' EP-RET-4B Radiological Controls at Site Access Facility (SAF) 10-21-81 EP-RET-4C Site Radiological Monitoring 12-21-81 EP-RET-5 Plu:ae Pdojections A

12-21-61 EP-RET-5A Plume Projections (Backup Method)

A 12-21-81 EP-RE T-6 Dose Projection A

12-21 -31 EP-RET-7 RAF/RP0 Co:riunications 12-21-81 EP-RET-8 Contamination Control at the Two Rivers 12-21-81 Comaunity Hospital t

,

  • Page 5 of 5 June 18, 1982 EMERGEllCY PLAN IMPLEMENTIt1G PROCEDURES Index-(cont'd)_

Procedure #

TITLE-REVISION DATE-EP-SEC-1 Security Organization 1 2-21-81 EP-SEC-2 Security Force Response to Emergencies B

05-21-82 EP-SEC-2(a)

Manual Activation of Emergency Sirens DELETED l-29-82 EP-SEC-3 Personnel Accountability (initial and Maintaining)

B 04-16-82 EP-SEC-4 Dosimetry Issue at SAF 1 2-21-81 E.P-T SC-1 Technical support Center (TSC) Organization 12-21-81 EP-TSC-2 TSC Activ'ation B

05-21-82 EP-TSC-3 Plant Status Procedure A

02-18-82 Emergency Design Change, Major Equipment Repair 12-21-81'

(':;._ j) EP-T SC ;?;j EP-TSC-5 TSC, Communications 12-21-81

?

1 t

. yw.

F

'T 7--

v l

'WISC0f; SIN PUBLIC SERVICE CORPORAT10ft NO.

EP-AD-17 REV. B

.i' Kewaunee Nuclear Power Plant TITLE:,'Communica tions EMERGENCY PLAN IMPLEMEllTillG PROCEDURE ~

DATE:

PAGE 1 of 18 JUlj 181982 EVIEWED BY bt I' PM D G92A APPROVED BY /d

^

h 1.0 APPL.ICABILITY 1.1 Thi,s procedure describes the communication systems to be used during a plant emergency to:

I a.

Notify onsite personnel b.

Notify entergency response organization personnel c.

Notify Federal, State and local authorities d.

flotify private support agencies 2.0 PRECAUTIONS t

2.1 All incc.ning emergency comnunications should be transferred fro.a the.

Control Roon to the Technical Support Center (TSC) or plant switchboard as soon as possible af ter e.nergency declaration.

2.2 All messages sent and received shall be documented.

2.3 Messages should be rep ated to ensure understanding,'especially those

. containing numerical information.

2.4 Precede Green Bay pager transmissions with a "1".

~

3.0 REFERENCES

3. 12 System Description #44 - Communications.

3.2 XK-233 Gai-tronics 3.3 WPS P.O.12589 - Motorola Radio Paging Equipnent instruction Manual 3.4 National Warning System (NAWAS) Operations Manual 3.5 State of Wisconsin - Division of Emergency Government Warning Plan

~

and Standing -0perating Procedures 3.6 Procedures for the Emergency Broadcast System - East Central. Wisconsin EBS Operational Area 3.7 WPSC Public Infonnation Emergency. Rpsponse Plan 3.8 Fluor Power Services. Inc. Emergency Response' Plan e

kg,g e."

2

WISC0ftSitt PUBLIC SERVICE CORPORATI0ll 11 0.

EPkD-17 Kewaunee fluclear Power Plant TITLE:

Communications n EMERGEllCY PLAll IMPLEMEllTit!G PROCEDURE p5Q DATE: jut (18'isoc PAGE 2 of 18 i

p, J

3.,9 American fluclear Insurers (ANI) Accident flotification Procedu e 3.10 Wisconsin Telephone's Emergency Preparedness Plan in Support of a iluclear Incident 4.0 RESP 0ftSIBILITIES 1

4.1 The Emergency Director is responsible,for the following notifications.

4.1.1 The required initi al ' noti fication's.

4.1.2 Additional notifications to support personnel to aug unt the shift staff.

~

4.1. 3 Follow-up notifications of plant status, emergency escalation or de-escalation and close out.

4.2 The Emergency Response Manager is responsible for the following notifications.

f.

4.2.1 The required initial notifications of corporate respons:'

q 7-pe rsonnel.

4.2.2 Additional notifications to corporate, support personnel to.

augment the corporate response.

4.2.3 Follo.v-up notification of site conditions, ene gency t,.ulat l iq or de-escalation and close out. to of fsite authorities af ter Emergency Operations Facility (EOF) activation.

4.3 The Emergency Response Organization directors are responsible for not i fft n.,; t nh ' 11,n r m"el v I r...'.v i. - *>:

their groups duties and functions.

5.0 REQUIREMEf4TS 5.1 Onsite personnel are notified of -a plant emergency using tne D'n) telephone syst.v, and the 5-channel Gai-tronics int ra,il, int :' i : t i.:

sys teni.

The Control <toai and Technical Support Center are e.;..:i','ea with " Night Bells" for after hours incaning calls.

The ide at Me.e systeais is described in Syste:i Description.e41 Carnilm: it -

L': t

{.

systems have nan-interruptible power sources.

i t

.{

w.a e

__ a M

4 e

4

..r-.

WISC0tiSIN PUBLIC. SERVICE CORPORATION NO.

EP-AD-17 Kewaunce fluclear Power Plant TITLE:

Communications A EMERGEllCY PLAN IMPLEMEttTING-PROCEDURE DA E h 181982 PAGE 3 of 18 w

5.2 The required initial notifications are detailed in the respective energency class notification procedure:

EP-AD-7, Notification of Unusual Event

~

EP-AD-8, Notifica tion of Aler.

EP-AD-9, flotification of Site Emergency EP-AD-10, I:otification of General Emergency 5.3 The required initial notifications of corporate response per manel are detailed in:

EP-E0r-3, Corporate Res;,onw to an Unus:n1 Event EP-EOF-4, Corporate Response to an Alert EP-EOF-5, Corporate Response to a Site Emergency EP-EOF-6, Corporate Response to a Ganeral Einergency

/

5.4 Of fsite WPS Energency Response Organization personnel should be initially contacted by co:amercial tale,1lnne, if the p;rsaa..

r s.,,.

be contacted by telephone, or time does not permit making individual

$7 telephone calls, the person's pager should be activated.

Of f Le,

home telephone numbers, radio-pager activation instructions and twn.

digit pagar codes are contained in Table AD-17.1.

5.5 Initial notifications to the State of. Wiscon' sin 'and Kewaunes am' Manitowoc counties shall be made using the flM1AS telephone describra in Table AD-17.2.

5.6 Follow-up contacts to the State of 'elisconsin. Ketnunee and IDni'.oun Counties, and initial contacts to the U.S. Coast Guard, Irdt), n.:er hwi Nuclear Insurers or other support,agenti.es shalI be made usinq t he

~

l c0ct.;ercial 't a' dma sy3 ten.

Suppa rt a,,e.ici es toiep;:a..'

provided in Table AD-17.3.

5.7 Initial notification to the U.S. Nuclear Regulatory Co.amission.

Bethes.ta, M!1. will be through tha E.nargency Noti ficn ion 9.t.1

',1. a j

red phone.

ENS phones are located in the Control Roan and lechnical i

Support Center..The ceamercial t elephane backup niente i 4 5.8 Intra-company connunic'ations wil1 be through ring-doin gicenif s an.t the connercial telephone system.

Each Eniergency Respon:,e i icili t.r (ERf) is furnished with a plant telephone extension li.tini: and diagram detailing ring-down circuits available in that f a c i l r t.).

1 f

i

.,G g.%

l

. v-a

  • WISC0!! Sill PUBLIC SERVICE CORPORATIOrt,

NO.

' EP-AD-17 Kewaunce fluclear Power Plant TITLE: ' Communications

'N EMERGElCY PLAll IMPLEMErlTlfiG PROCEDURE JUI.i 181982 PAGE' 4 of 18 DATE:

l.

i 5.9 Communications with plant emergency teams and environmental monitoring teams will be using Motorola two-way radios and the plant transmitter.

Remote console stations are located in the Shif t-Supervisor's of fice, Radiation Protection Office (RPO), Emergency Operations Facility i

(EOF) and Site Access Facility (SAF)..Each base station has intercom capabilities with each of the other base stations.

The RP0 station maf be relocated in the Radiological Analysis Faciality (RAF) if RPO evacuation.is necessary.

Team designation and base station location should be used in all comnunications.

l 5.10 Each Emergency Response Organization director-should maintain a log i

detailing:

1 Changes in plant status or emergency dlassification a.

b.

Actions taken

/

c.

Important data received 2

d.

Any recommendations made L

5.11 Messages sent or received should be documented in a communicator's g

log with infornation on Form AD-17.

i i

e 6

e

-e' l

e

  • ^

EP-AD-17 JUN 181982 TABLE ~40-17.1

'34.

EMERGENCY CALL-LIST

-1 1.0, Tone and Voice Radio ' Pagers are assigned to Perso'nnel as shown with call numbers on the Emergency Call List.

2.0 Whenever it is necessary to contact a person on the Emergency Call List and he is not onsite, the home telephone number should be called first.

If he cannot be reached at home, contact should then, be attempted by susing the group call number. Tone and voice contact by pagers if effective within 15 mile radius of the transmitting station.

Only tone contacts can be made outside the 15 mile radius.

3.0 llow to Place a Page 3.1 Determine the two digit pager cnde for the party or group you uis'1 to contact from the Baergency Call List, ljtACK N.1:E Of;LY Located in the Shif t Supervisor's of fice'.

NOTE: The Black Phone only activates the Kewaunee transmitter.

This phone cannot he used to activatd the Green Bay trens.aitt 2r.

To activate the Green' Bay transmitter, go to step 3.5 - Plant CK, mJ Extension Phone.

i 3.2 pial the two digit pager co.ie for the party or group you wish to contact from pager assignment list.

~

3.3 Listen for the_ acknowledge (beeping) tone, indicating page being-transmitted.

3.4 When the beeping tone stops, speak your message to the called pa rty.

There is no allotuent time far calls on Llis phone.

Af ter message, hang up the phone.

PLANT EX1ENSION PHONES 3.5 Dial the tenninal _ access code on any plant extension.

Kewaunee site transmitter -

Green Bay tr3ns.aitter -

a.

When the tenninal answers and responds uitir a bee,i. 90 to step 3.6.

b.

If you hear a " busy", signal. hang up and t ry again.

e[o 9

D e

4 3

i EP-AD-17 JUN 181982 Page 6 of 18 TABLE ~AD-17.1

- EMERGEllCY CALL LIST'(cont'd)-

7 3.' 6 Dial the two digit pager code for the party or group you wish to contact from the pager assignment list.

NOTE: This number must be preceded by a "1" when using the Green Bay transmitter.

.3. 7 Listen for the acknowledge (beeping) tone, indic'ating page being transmitted.

3.8 Uhen the beeping tone stops, speak your message to the called party.

You have about 20 seconds to talk, after which the terminal will hang up.

Replace the telephone receiver.

GREEil DAY EXTEllSI0il Pil0NES 3.9 Dial the Keaaunce Plant tie line 4

3.10 Then dial plant extensions:

/

j a.

For Kewaunee site transmitter -

b.

For Greer. Bay transmitter -

T.

[l4 3.11 When the terminal answers and responds with a beep, go to step 3.12.

If'you hear a " busy" signal, hang up and try again.

a.

3.12 Dial the two digit pager code for the party or group you wish to

~

contact from the pager assignment list.

NOTE:

This number must be preceded by a "1" for the r,reec Bay i

transmitter.

3.13 Liiten f ar tile a:snowle. iga (' uping) ta le, i:n.fic iti 1.; c.:; > luisi a

transmitted.

3.14 When the beeping tone stops, speak your message to: the. called party.

You have about 20 seconds to talk, af ter diicn the-terminal will hang up.

Replace the telephone receiver.

e j

( t-4 i-4 8

6

t EP-AD-17 JUN 18 Daz j

Page 7 of la TABLE AD-17.1.

EMERGENCY CALL LIST (cont'd)

~

g:9

,n

~

8, 4.0' Tone and Voice Pager Operation 4.1 Set the ON/0FF switch on' the bottom of the pager to the ON position (white dot visible).

The ' alert tone will sound to indicate battery I

condi tion.

If tone is absent, replace or recharge batteries'.

l 4.2 Press the reset touch bar on top of the pager.

This resets the pager to standby and eliminates the squelch noise.

)

4.3 Uhen you are paged and the alert tone is. heard, the voice message is heard autonatically.

Folloaing the alert tone, volume control can he adjusted for desired level.

4.4 Af ter a nessige, press the reset touch har to reset the unit, f

4.5 Key emergency response personnel and their-alternates should telephone

~ '

the plant at after. receipt of a pager signal / message to

/

confirm that contact has been made.

'd_

-l I

e t

i h

V e

F l

t e

e 4 % $g'+'.

l

+

L 6

e

--v ir w - -

w r,.m%----e-w-,

wm

,,v

,y-vvm---,,-,,

,n-,--

-r-m--

y

---mm-

.,,, =

EP-AD-17 Juli 1 8 1982 Page 8 of 18

('

TABLE AD-17.1 s,,[. j?

Ef4ERGErlCY CALL LIST (cont'd)

EXTEttS10tl fl0!iE Pit 0!'E PAGER CODE Key Director's Group Corp; rate Support. Group l

t i

[t :3. <

\\

l i

l t

EP-AD-17

~

JUN 181982 Page 9 of 18 TABLE AD-17.1

+?2

' ' ;)

EMERGEllCY CALL LIST (contd)

EXTEllSION 110ME Pil0NE PAGER CODE Operations Group 9

%C4

'.),

0 6

9 9

e x _,. -

4*

6 hI}

),pg Page 10 or 13 QlA e

2 TABLE AD-17.1

..a

-.'4' EMERGEllCY CALL LIST (cont'd)

EXTEllSI0ff HOME PH0fiE PAGER CODE Plant Supervisors /STA's Group

?

l r.~.

s.-

I o

l 4

N,

e j

l

1 EP-AD-17 JUti 181931 Page 11 of 18 TABLE AD-17.1

l.sh.
. Lg EMERGEllCY CALL LIST (cont'd) 3,r.

EXTEf1SION HOME PH0ftE PAGER CODE

, liealth Physics Group.

t t'

Chemistry Group

~ l' 6

Site Team l

I I

I p. 3, s ~,

b

EP-AD-17 Juri 181982 Page 12 of 18 TABLE AD-17.1 EMERGEftCY CALL LIST (cont'd) o

- :s EXTEftSI0ft 110ME Pil NE PAGER CODE Fire Teams l

4 b;*l MdClld fliCS f

l e

d

--?'4 4

I 9

E '- AD-17 J Jil 18 C

Page 13 of 18

-J' TABLE AD-17.1 E!4ERCEliCY CALL LIST (cont'd)

EXTENSIO!!

Il0:4E P110fiE PAGER CODE Electricians 1&C

}

~

5 0

l l

l i

e x;

    • h m

b

EP-AD-17 JUii 181982 Page 14 of 18

- p%

-r[. -

.- y d

TABLE AD 17.1 EMERGEtlCY CALL LIST (cont'd)

EXTENSI0ff HOME PH0!iE PAGER CODE Envi ronmental O

e e

/-

-J

,1_

e 9

e a

O e

f

~

I

P-AD-17 (JUN 1b u Page 15 of 18

~

TABL'E AD-l'7.2

' ' ' m.

^$y NAWAS OPERAT10ftS s-1.0 The black telephone and loudspeaker located in t.he Technical Support Center

~

are part of the flational Warning System.

Points throughout the state as shown in the following drawing can be accessed simultaneously by removing the handset.

Messages should be directed to Kewaunee County, Manitowoc County, the East Central Warning Center in Fond du Lac and Wisconsin Warning Center I in Madison.

2.0 Telephone operation is achieved by. removing the handset and depressing the PUSH-TO-TALK button on the inside of the handset.

Messages should be of the form:

"Kewaunee fluclear calling Warning Center 1, East Central Area, r+eme Cn; qty, ILni tetoc C'wnty.

Please acknowledge."

Wdit until each area has acknowledged before continuing. - If any area fails to acknowledge, request that Warning Center I ring that area and continue:

I, "Please take the following message.

Thisis(title) at the Kewaunee fiuclear Plant.

~

(Insert the desired message)

Relay this information to Emergency Government immediately.

Any return contacts or confiniing calls should ci through commercial telephone.

Please acknowledge receipt of message."

Each area contacted should acknowledge message.

G e

O g

AD-17 EP N } b 1982 NATIO?tAl. WARillNG SYSTEM - WISCONSIN JU TABLE AD-17.2 (cont'd).

Page 16 of 18 s.

~.

"F o f.,e O M,o O

=

V entitto u,.

^ <i9 e,ntoo

0..

EttOH O *****

s.'" p %g$*%

I 1

viv

~4 sn ova n u iu.

c.,

M*'m., /

(Tuacr

O....J',,g...,

.....c mcc L

i g %,1

',y....J....O cuocA v,.,

J

]

V

<p'.*.u i t t

j. o,,.

0 O

,.o.)g c

(.

net.Aow rua l

f.

g n

m~ ~

c...-

s...

r

...e.,m v.;

o s'

r OCONTO

.e 1 Af tC R '

s.

g.

(u,.. '.

.. /.

7-,, si ci c' =

0 **.,

j~7 ~

ouere %

]

]*]

c j

cv.w p[

{,l.;

    • f'U>.n. on :

.t,.ew u i

1s

.a a n

-.o

) -

O.,., '

c'.

s y

...... ' 1.n ru,.,. \\;

.., * *.., *'., ~.,L~uiEtm.....

  • *.c

.....ff

('

"Wc g.

, ;- l m ;,: f. _. _..

ety ;

(%

"L*.n.....

q)

~

s.,

.mo v1.a t waursen

}

o,Of.-(,I..[

ou,AG u;L

.!b kP'-,,].'Es'rsto 1 ? t e..' t -

"* '"' j Q

Q........o

'O

('o vq

~

0

,_r e

i

.O*~.g

\\

\\

~

.,u,,e w\\ pun

'^~'u'c*oc ;.

cu,g;

.~,< >.a s

~ ~ wao

,j, N1,j+./-C i,. 4)~...... > \\

...O

/,,

,,f"" i

o......

.e s

b

.,, </c,.a.,,;."..'..I....

y t < cw w t..tf 93,v4 o

i O

g

,,,,1,

{,1...........)....r3,

(_'.)

. [_

[

EC t

~ rue

  • idoc L

uu, co l

O

,. ~.n w,,,,

g.....-

""*")""

g b NUCLEAR PLANT r

s OP UlS.WARNI'lG CTR. 1 & l

. /**" h

,m

'4

@Wis.WARNINGCTR.111('V su r tw

>at i..y ny.

f,snawtrp0f.

)

v f

f C

..t.si./ uci c.v;'

C COUNTY NA'.s'AS WARNINGO....'

- ru u i

ye,%)1 nocs CTR.

O~~..Q c

OAREAWanNixaCENTER

... o cj s

"O O NON-NAWAS COUNTY WARNING CTR.

r..:s t.; %-

+

A WEATHER SERVICE OFFICE

..................... R AD 10 RE L AY Note: Warning Centers 1, 11. !!! & Milwaukee Weather 53rvice Office have ring-down capability

EP-AD-17 JUN 181982 Page 17 of 18 TABLE AD-17.3 Support Agencies - Commercial-Phone Numbers

?:l_%

I g

Oy

  • NOTE:, Long Distance Calls must be preceded by a (1)

American Nuclear Insurer's

(

1 Department of Energy Day

(

Night

(

East Central Area Of fice of Emergency Goveranent - Fond du Lac i

Fluor Power Services C.E. Agan, Director Of fice (

Home

(

T.L. Roell, Alternate Office

(

Home

(

Hazleton L.G. Huebner Office (

lo n

(

C., Karucut Of fice (

llo.ne

(

Institute of !!uclear Power Operati.ons (II!PJ)

(

.p

'2,

Kcwaunce County (Snerif f's Depart:nent)

. ",/

Kewaunee County Emergency Government (E0C)

.Manitowoc County (Sherif f's Department)

Manitowoc County Emergency Government Director Medical Assistance Two Rivers !!ospital Dr. Kaner U.ll. Hospi tal Dr. Larson i

!;ational 1;eather Service Of fice (dreen ' day)

NRC - Region 111 - Chicago Operations Of fice.

Point Beach fluclear Power Plant Public Service Commission of Wi'sconsin RAD Services, incorporated 1

State Police - Fond du Lac i

U.S. Coist Guard Day Night h"'??

Westinghouse Day gj t

Wisconsin Division of Emergency Government.

S 9

JUU 8 1982 Page )18 of lu FORii AD-17

_TELEPil0t!E COMMUf!! CAT 10!!S LOG SHEET e

.o

'N DATE:

Til4E:

IffC0filflG OUTG0lflG hi.

QSJ T0:

FROM:

n<

.B I4cssage:

s.

{

l r;-- a Sent by:

I Receiver! by:

_.-.~

_DATE:

TIME:

lliCOMIt;G OUTG0ING TO:

FROM:

_,l liessage :

1 t

-l i.

r$.A gs

~;

J Sent by:

Received by:

I i'

~

.~

._ i l

DATE:

l TIME:

l INCOMIfG OUTG0!t!G

__l TO:

ab.

FROM:

fiessage :

I l

I I

i I

4 i

I i

Sen: N:

f.e Received by:

g 9

+

i ~. <

. WIS,00ftSIN PUBLIC S:RVICE CORPORATION NO.

EP-RET-3C p

Kewaunee Nuclear Power Plant TITLE:

Post Accident Operation of the

!!igh Radiation Sample Room EMERGENCY PLAN IMPLEMENTATION PROC'EDURE

~

~

DATE: gg ig ggg PAGE 1 of 23 REVIEWED BY 1.i D ' tk. APPROVED BY i

1.0 PURPOSE 1.1 This procedure is to detail the requirements, considerations, and operation of the High Radiation Sample Roon during a post LUCA condi tion.

2.0 APPLICABILITY 2.1 This is.to det.iil tne procedures to i:e utilized for oi>i.cining:

a.

Diluted liquid sample of primary coolant, for Boron Analysi f and Isotopic Analysis (Sect 5.1).

b.

An inline sample for pH, conductivity, oxyge 1, and chloride analysis (Sect 5.2).

S 7) 2 c.

An inline sample of primary coolant for Ilydrogen Analysis.

and a dilute sample of gases, contained in Prinary Coalant, 1

for Isotopic Analysis (Sect 5.3).

i d.

An undiluted sample of Primary Coolant for off-site analysis (Sect 5.4).

e.

Containment Hydrogen Analyzer measurement (Sect 5.5).

f.

Containment Air Sample Panel operation (Sect 5.6).

j 3.0 PRECAUTIONS 3.1 Process an Emergency Radiation Work Pennit (see EP-AD-ll).

3.2 Contact Health Physics Dept for:

a.

Proper personnel dosimetry, b.

Proper radiation detection instrumentation.

l c.

Personnel for continuous HP coverage during satpling.

I d.

Remote area monitor readings in area of HRSR.

3.3 Utilize onsite communications with the Radiological Protection Director, as necessary, during'samplitig.

.4 e

--2-.

n

-,-.--------y

. ---.9 l

WISC0ftS!ft PUBLIC SERVICE CORPORATI0tl fl0.

EP-RET-3C Kewaunce fluclear Power Plant TITLE:, Post Accident Operation of the High Radiation Sampie Room Sf.,hEMERGEllCY PLAll IMPLE!4EllTATIO!! PROCEDURE

~

DATE: Jg;!l81982 PAGE 2 of 23 mw 4.0 REFEREllCES 4.1 Sentry llRSS Operating and Maintenance Manual

.4. 2 P,C-C-82, Baron Analysis - Curcumin Method 4.3 RC-C-?, pil Analyzer Oper & St i 4.4 RC-C-?, Conductivity Oper & "d 4.5 RC-C-?, Oxygen Analyzer (YSI) Oper & Std 4.6 RC-C-?, Oxygen Analyzer (Rexnord) Oper & Std 4.7 RC-C-?, Ion Cliromatograph Oper & Std 4.8 RC-C-?, Gas Chromatograph Oper & Std

/

5.0 PROCEDURE 5.1 Dilute Liquid Sample

<>A

~ ^

5.1.1 Proceed to llRSR,per HP/RPD recommendations.

5.1. 2 Check ventilation on in " normal" position and High Vacuum Lights indicate " normal" for the LSP and CAP.

5.1. 3 Check radiation levels in llRSR, and in maintenance area behind panels, if access is ' required.

~

5.1.4 Check the following Lab Equipment available anJ opJrational:

a.

Drying oven on a: $ 5C t o 6(1"C.

b.

Fume hood ventilation normal.

c.

Shielded aligoiter available.

d.

D1 water flush hoses connected to' LSP and supply valve on.

c.

Neu 24 nl diluted sanple tiottle, f.

Hand operated vacuum pump.

g.

Lights on in Diluted Sanple Port of LSP.

h.

LSP Sample Cask available with diluted sample bottle piston i ns t al led.

i.

Perfona valve lineup per Attachment al.

J.

Reach Rod for remote valve operation.

L.

All material required in sectiUn 4 ot~RC-C-82.

1.

Mul t i-channel a n aly.yr. av,a i l'ab le for count i ng.

m.

2 - 1 liter poly tiottles.

(M@

w.-

/

e

u.-

u.

.~

<m WISC0llSitt PUBLIC SERVICE CORPORAT10ti NO.

'EP-RET-3C Kewaunce fluclear Power Plant TITLE: ' Post Accident Operation of - tRrr High Radiation Sample Room 2

~ EMERGEllCY PLAtt IMPLEMEllTATIO!l PROCEDURE

'i DATE: JUN 181982 PAGE 3 of 23 j

I

. 5.1.5 Evacuate the diluted sample bottle to 15 inches of vacuum or more.

Install in sample cask and check cask for proper operation, c-3 5.1. 6 Install the sample cart under the diluted sanple part and s

position the bottle up on the needles.

5.T.7 Check level in dilution water reservoirs.

Fill to full mark as,

necessary.

5.1. 8 Have Control Poca Operator opn RC 42? and RC-4? ? (00:

<y p i n !

for RilR sample).

5.1.9 At tne Saaple Acqnisition Panel:

a.

For RCliL Sample: Open CC-314 1

4 Open RC-423-1 g

b.

For RHP. Sauple:

Open CC-316 i

pg Open RHR-81-A (81-B)

M4 Y

c.

For all Samples: Turn RC-437-1 (437-2) to DDT 1

5.1.10 At the Liquid Sampic Panel:

Open V-3, Open V-1.2 (V-1.1 for RilR) 5.1.11 Regulate Reactor Coolant (R!iR) flow using RC-VREL-1 unt il flow D

indicator RC-F1-1 indicates' between 35 to 40 inches of water.

Maintain this purge for a minimum of 5 minutes.

NOTE: A D/P of 35 to 40 inches of water on RC-F1-1 is equal to apprasi:ut el,1/P 90 : flo. r L.

5.1.12 Upon completion of the purge:

Shut V.3 Open V-8.2 Open V-9.'l Open V-2 5.1.13 Regulate Reactor Coolant (or RilR) flow -usitig RC-vini.-2 until flow indicator RC-F1-2 indicates 18 to 22 inches of wat er.

ltiintain this purge for a i:iini,aua of 3 titinutds.

f;0TE: A D/p of 18 to.'? inches ol' water on RC-11-? is* equal to

,approun.t t ely.W c c.'nin fl ow r.it e.

'l+;, e t

N l

.f t

c

,-.e-1 m -

,r,

-.w-m, m

1--

.c

]

WISC0fiSitt PUBLIC SEitVICE CORPORAT10ll fl0.

EP-RET-3C Kewaunce fluclear Power Plant TITLE:. Post Accident Operation of the High Radiation Sample Room 1.EMERGEllCY PLAft IMPLEMErlTAT10fl PROCEDURE

.'3 DATE: JUN 181982.

PAGE 4 of 23

~

5'.l.14 Upon completion of the purge: Turn DV-1 to " Sample" Shut V-1.2 (V-1.1 for RilR) 1 e

5.1.15.._' Throttle open V-21 and add 24 ml of DI water, from the graduated reservoir to the sample bottle, then close RC-V-21.

5.1.16 Turn DV-1 to " Bypass".

~ '

5.1.17 Open V-4.

Observe Flush Water I' low Rate of 18-22 inches of water for a minimu.n o'f 3 minutes.

5.1.18 Upon co.ipletion of flush:

Shut V-4 Shut V-2 s

Shut '!-U. 2 Shut V-0.1 5.1.19 Have Control Roo, Operator shut RC-422 and RC-423 (not requiril j

for R'01).

5.1.20 At the Sample Acquisition Panel:

i

[7..j For RCHL Sa:nple: Open FPC-51 c'<>

- Open FPC-51-14 For RiiR Sample:

Shut RHR-81-A (81-B) -

i Open FPC-51 Open FPC-51-41 l

5.1.21 At the Liquid Sample Panel: Open.V-1.2 (V-1.1 for R!iR)

Open V-3

.0bserve Flush llater Flow Rate of' 35 to 40 inches of water as indicated on di-F1-1.

Mai ntai n f'.u>n ior b,:ii..at es ii i a performing step 5.1.22.

g i,

l w

5.1.22 Lower the diluted sample bottle into the. sample cask.

Close

'the cas( and install auxiliary shield.

Pl. ice ca.d nea r t a::ie hood.

5.1.23 Upep hyapletion of flushing:

Shut V-1.2 (V'-1.1 tor R!lR)

\\-

x Shut V-3 s

5.1.24 At the Sample Acquisition Panel:

x p

' ' ~

~

For RCHL Sanpie:

Shut 9C-4?.3-1 Shut frC-51-14 s

j (f.,;.,,

Shut. FrC-51

(

-. Shut CC-314 x

~

9 e

--,-4~

e

WISC0llSill PUBLIC S[itVICE CORPORAT10ri NO.

EP' RET-3C 1'

Kewaunce fluclear Power Plant TITLE:

Post Accident Operation of the High Radiation Sample Room EMERCEllCY PLAN IMPLEMErlIAT10ll PROCEDURE '

i

' n. A)

, [N DATE:

PAGE 5 of 23 l

M 18 G82 Typ For RHR Sample:

Shut RHR-81-A (81-B)

Shut FPC-51-41 Shut FPC-51 Shut CC-316 For all samples:

Turn RC-437-1 (or 437-2) to VCT 5.1.25 Using the shielded liquid aliquoter, transfer a l'.0 ml sample from the sample cask 'into a VYCOR evaporating dish.

NOTE: for Boron analysis of less than 2000 ppm, use an appropriate larger amount of sa.nple.

5.1.26 Continue the Boroh enalysis with stap 6.2 of RC-C-82.

s i

5.1.27 For Beta Gam.na analysis, transfer 1.0 al of coolant fri.u the cask to a liter poly bottle using the shield 2n liquid aliquoter.

Dilute to 1 liter.

f 5.1.28 froa the diluted I liter bottle. in' step 5.1.27, transfer 10 ml to another enpty. liter bottle.

Dilute to 1 liter.

Th i s so.1,:! a may be transferred to the nulti-channel analyzer for counting.

8 NOTE:

Total dilution is ( x 10 )

4 5.2 Inlin'e Sample for pH. Cond, Op and Cl i

5.2.1 Proceed to HRSR per HP/RPD reco:anendations.

1 5.2.2 Verify ventilation is ON in "n'onnal" position and high vacuuu lights indicate "nornal" for the LSP and CAP.

l l

S.2.3 Check radiation levels in URSR, and in naintenance area behind panels if access is necess.my.

5.2.4 Verify the following lab equip.nent available anJ operJtional, DI water flush hoses connected to L5r an.1 CA nith supply a.

valves open.

b.

Veri fy. valve lineup for SAP. LSP. and, CAP. p.'r M tachmut:

1.

c.

Reach Rod for Re. note Valve operat ion.

d.

Main Power switch at CS1P "on".

I l

e.

At the CMP, turn on the YSI chart recorddr, Jll meter, i

conductivity meter, and st. art IC unit for lase line.

~

f.

Check !!RSS calibration 1og I'or verir ication of la tias t perfernances, g.

Chec!, gas bot tles. (ara in and air),f er ad '.Na t,' 'inpply.

h?9 e

I e

+wv vv cc.--eor e - %

e r

v

WISC0fiSill PUBLIC SERVIC[ CORPORATI0rt fl0.

EP-RET-3C Kewaunce fluclear Power Plant TITLE:

Poi;t Accident. Operation of the High Radiation Sample Room El4El!GErlCY PLAll ll4PLE!4EllTAT!0!I PROCEDURE

- _.,k,

' y DATE: 'Jgjg 181982 PAGE 6 of 23

~

3 5.2.5 At the CAP: Turn V-6 to Liquid Sample Turn V-5 to Liquid Sampic 5.2.6 Have the Control Room Operator open RC-422 and RC-423 (not required for RilR sample).

5.2.7 At the Sample Acquisition Panel:

i For RCHL Sanple:

Open CC-314 Open RC-423-1 For RHR Saaple:

Open CC-316 RilR 81 - A (81 -B) for all saaples:

Turn i!C-437-1 (or 43/-2) t.u 1:!,I.

5.2.8 At the Liquid Sample Panel:

Open V-3

/

Open V-l.2 (V-l.1 tur Ril!)

i 5.2.9 Regulate Reactor Coolant (or R:ta) flo:t using R?.VREL-1 until flow indicator RC-FI-l indicates between 35-40 inches of water.

..s,q liaintain this purge for a miniuun of 5 minutes.

y ll0TE: A D/P of 35 to 40 inches of water on RC-F1-1 is equal to approximately 1/2 gpm flow rate.

5.2.10 Upon conpletion of the purge:

Shut V-3 t

Open V-2 Open V-7

. Turn V-22 t.o CAP

^i 5.2.11 Regulate Reactor Coolant (or Rl!R) flow using RC-VREL-2 until f l e.1 i i t i c.4 t.ir RC F 1 ' i rd ! e.s l a t o ~ iva.. f.v.

. Maintain this purge for a nininuin of 5 minutes.

fiOTE: A D/P of 18 to 22 inches of water on RC-F1-2 is equal.

to approximat ely 200 c-/nin flow rate.

5.2.12 Verify adequate flow rate to the CAP by observing the light s "on" tor bo'th 02 fl0W d'"1 li IIOW-l 5.2.13 Uhen the YS! 07 meter t. hart re.i.fing has stabilized:

Record the conductivity rea, ting.

l Record the teriperature Record 't he 0-readin 1 i

place the Lo'id/Injec'. switch on the IC' unit to "In, ject" t

f k.

I i

e I

g

~

WISC0flSlit PUBLIC SERVICE CORPORATI0il fl0.

.EP-RET-3C Kewaunee huclear Power Plant TITLE:. Post Accident Operation of the liiqh Radiation Sample Room sEMERGEllCY PLAll liiPLEliEllTAT10fl PROCEDURE f

{j DATE:

Jgfl 1 g.1982 PAGE 7 of 23 h

5.2.14 At,the Liquid Sample Panel:

Turn V-22 to Waste Shut V-1.2 (V-1.1 for,RilR)

Open V-4 5.2.15 Observe DI Water Flush to Waste as indicated on Flow Indicator RC-FI-2.

After 2 minutes:

Record pit reading Place the Load / Inject switch on j

the IC unit to " Load" l

5.2.16 Flush the CAP by turning V.-22 to CAP position.

Veri fy flush water flow by observing the lights "on" for both 02 Flow and IC Fl o.'

Centinue flush for 2 minutes.

110TE: Chloride res'ults should read out 5 to 10 minutes af ter-injection (step 5.2.13).

5.2.17 Upon completion of flush to CAP:

's At the LSP: Turn V-22 to Waste J.4 Shut V-7 c.M Shut V-2 Shut V-4 At the CAP: Turn V-6 to Op Cal Turn V-5 to Closed 5.2.18 llave Control Room Operator. shut RC-422 and RC-423 ('not required forRilRsample).

5.2.19 At the Sanple Acquisition Panel:

For RCitt Sample:

Open FPC-51 Open FI'C-51-14 For Riitt Saaple:

Shut RHR SI-A (81-B)

Open FPC-Si Open FPC-51 41 5.2.20 At the Liquid Sample Panel:

Open V-1.2 (V-1.1 for RiiR)

Open V-3

~

Observe flush water: floy rat a of 35 to.10 inches of wahit-as indicatoi on RC-F1-1.

?'aintain this flush for a mini.t.mi

,6 of 5 minutes.

l s

I.


w.


n e

~

WIS.C0!4Sitt PUBLIC SERVICE CORPORATIO!!

N0.

EP l(ET-3C Kewaunee fluclear Power Plant TITLE: Post Accident Operation of the High Radiation Sample Room f1 IMPLEMEllTAT10tl PROCEDURE *

'yty}MERGEtiCY PLAT {

PAGE 8 of 23 DATE: JWI 181982 s

5. 2.21 Upon completion of flushing: Shut V-1.2 (V-1.1 for RilR)

Shut V-3 5.2.22 At the Sample Acquisition Panel:

For RClit Sample:

Shut RC-423-1 Shut FPC-51-14 Shut FPC-51 Shut CC-314 For' R!lR Sanple :

Shut RHR 81-A (31-B)

Shut FPC-51-41 Shut FPC-51 Shut CC-31r,

~

for all samples: Turn RC-437-1 (or 437-2) to VCT 5.3 Hydrogen and Gascous Activity of Priuary Coolant 5.3.1 Proceed to KRSR per HP/RPD recoa.nud.itions.

5.3.2 Verify ventilation on in " normal" positioq and :iigh vacuua

  • j lights indicate " normal" for the CAP and LSP.'

5.3.3 Check radiation levels in HRSR, and in maintenance area behind panels, if access is necessary.

5.3.4 Verify the following lab equipment availa' ale ac.1 uparational:

a.

D1 water flush hoses connectei to lSP and CAP with supply valves apen.

b.

Veri fy valve lineup for. SAP, LSP. and CAP per At t.ach :. n! c1.

c.

4e ic'i ::aa fc: re :,,: 0

.i..o d.

Main power switch at tne CHP "on",

c.

Check the prograri in GC nini-co1ppl er an.1 i ite,; J,1:a in.

the HRSS Cal Log.

f.

Check Argon and Air Pres %re in la!' J1.1 it ' he '! ' i -

adequate supply.

9 10 c c tia s sa 1pl e l'ot t l e. wi "i <. epi vi. pre:v r!3 iw 01 '

in facd of LSP. using t he special nanaling tool.

h.

Veri fy multi-channel an.ily/er av.tilaale t er cc mt i i:.

5.3.5 Dry the expansian vessel:

Turn V,ll to " Argon in" Open.V 4 Peein V. 4,

Opt'fl V - I.I f

\\

WISC0ftSitt PUBLIC SERVICE CORPORATI0ft f40.

EP-RET-3C Kewaunce fluclear Power; Plant TITLE:' Post Accident Operation of the High' Radiation Sample Room I:ff}) EMERGEllCY PLAll IMPLEMEllTAT10tl PROCEDURE.

~

PAGE 9 of 23 9

4 DATE: JUN 181982 1

5.3.6 Adjust RC-VREL-2 as necessary to' obtain 20 psi on RC-G-3 for 1 minute. Observe flow indication on RC-FI-2 also.

3 i

5.3.7 Upon completion of Drying Expansion Vessel:

1 Turn V-11 to " Vent" position

' Shut V-9 Shut V-8.2 5.3.8 Ha.ve Control Roon Operator open RC-422 and RC-423 (not requir.nl for sarnple from RiiR).

i 5.3.9 At the Sanple Acquisition Panel:

For RClit Sample:

Open CC-314 Open RC-423-1 l

For Rita Sa.nple: Open CC-316 Open RHR 81-A (31-B)

For all sanples:

Turn RC-437-1 (or 437-2) to DDT i

5.3.10 At the Liquid Sample Panel:

Open V-3 Open V-1.2 (V-1.1 for RilR)

I 5.3.11 Regulate Reactor Coole.nt (R!iR) floy using RC-VREL-1 until fl.r.2 indicator RC-FI-l indicates between 35 to 40 inches of u.1f.ar.

Maintain this purge for a,minimuia of 5 minutes.

NOTE: A D/P of 35 to 40 inches of va*.er on RC-Fi-1 is. p:'l l

to approximately 1/2 9p.n flow rate.

I 5.3.12 Evacuate the Gas Exp. ins ioi. Vessel, se i,sie bo'.i.le eu.. t..o:..;;

Open V-13 Open V-15 Turn DV-2 to 12 o' clock posi;io't Open V-12 5.3.13 tlhan vacuun on RC-G-2.2 reatis 22 inches vacut.n or.gr.iator, turn DV-2 to 9'o' clock pos'ition.

5.3.14 tilien vacuuu on RC-G-2.1 reads 22 inches' of vacuin or preat est :

Shut V-15 q,,

Shut V-13

~

_-.-c.-..,-,y,

~.., _ _,..,.,.,

r.

WISC0rl51tl PUBLIC SERVICE CORPORAT10tl tio.

EP-RET-3C r.cwaunce fluclear Power Plant TITLE: ' Post Accident Operation of the High Radiation Sample Room e, EMERGEllCY PLAll !!1PLEtEtiTAT10fl PROCEDURE

'L'j DATE: 'JUN 181982 PAGE 10 of 23

.~

Shut V-10 Turn V-11 to Closed Shut V-12 NOTE: Observe vacuum reading on both gauges holding steady.

5.3.15 Open V:14 and observe about 1.0 psi on RC-G-2.2.

5.3.'16 Upon completion of purge (from. step 5.3.11):

Shut V-3 Open V-8.2 Open V-8.1 0l:en Y-2 5.3.17 Regulate Reactor Coolant (RHR) flod using RC-VREL-2 until flot[

indicator RC-F1-2 indicates 18 to 22 inches of ve. iter.

liain ta i n this purge for a minimaa of 3 minutes.

Il0TE:

A D/P of 18 to 22 inches of eter on RC-F1-2 i: equal to approxicately 200 cc/ min flow rate.

\\

5.3.18 Upon completion-of sample purge:

. Shut V-8.2 Shut V-8.1 Shut V-1.2 (V-1.1 for RilR)

Open V-9' Open V-16 (for 1 full minute)

'5.3.19 Upon co.npleiion of gas stripping, co.nnence LSP flush:

Snat -l o Shut V-9 Open V-8.2 Open V-8.1 Open V-4 Turn V-Il to " vent"' position 5.3.20 Obtain the diluted gas sanple by turning DV-2 to 12 o' clock position.

5.3.21 Observe pressure gauge RC-G-2.2 st.ibili.Tei at about 1 psi:

larn DV. to 9 o' clock.positien Shut. V-14 e

WISC0flSlit PUBLIC SERVICE CORPORAT10ft 11 0.

EP-RET-3C Kewaunce fluclear Power Plant TITLE:

Post Accident Operation of the High Radiation Sample Room

-EMERGEflCY PLAll IMPLEMEflTAT!0ft PROCEDURE DATE: JUU 181S82 PAGE 11 of 23

{.j 5.3.22 Remove the diluted gas sample bottle from the LSP and place l

entire assembly in fume hood for later transport to multi-channel analyzer.

5.3.23 At the CMP, operate the GC mini-computer to draw a vacuum on all 4 sample loops.

5.3.24 At the LSP open V-15 and allow the gas sample to transfer to the GC.

5.3.25 Operat2 t'n GC unit to obtain 4 s3nples for hyd m!..n d or ;i, tion.

By selective attenua* ion, starting with a high value, detennitie the hyd 9:a conc ntration.

5.3.26 Have Control Roon Operator shut RC-422 and RC-423 (not required for RHR sample).

5.3.27 At the Sample Acquisition Panel:

c;,

For RCHL Sample: Open FPC-51

' - /s Open FPC-51-14

.: e For P.HR Sample:

Shut RHR 81-A (31-B)

Open FPC-51 Open FPC-51-4.1 5.3.28 At the Liquid. Sample Panel:

Shut V-4 Shut V-2 i

Shut V-8.1 Saut V-S.2 Open. V-3

' ':: }

Ope n !-1. " ('l-1.1 :

l Observe flush water flow rate of 35 to,40 inches of.ater on RC-F1-1.

Maintain this flush for a mini,mun of 5 minutes.

5.3.29 At the completion of flushing:

Shut V 1.2 (V-l.1 tar RilR)

Shut V-3 5.3.30 At the Sample Acquisition Panel:

For RCHL Samples:

Shut RC-423-1 i

Shut FPC-SI-14 Shut FPC-51 Shut CC-314

[mq i

N.<

l s

v a


,,n

-e y

l

,. WIS,00!ist!{ PUBLIC SERVICE CORPORATI0rt fl0.

EP-RET-3C Kewaunee fluclear Power Plant TITLE:

Post Accident Operation of the High Radiation Sample Room EMERGE!!CY PLAll lMPLEMEflTAT10!{ PROCEDURE

~

.s DATE: JUil 181982 PAGE 12 of 23

.j;@c)

For RHR Sample:

Shut RHR 81-A (81-B)

Shut FPC-51-41 Shut FPC-51 Shut CC-316 For all samples:

Turn. RC-437-1 (or 437-2) to VCT.

5.3. 31 At the LSP flush the c'xpansion vessel:

Open V-8.2 Open V-9 Turn V-ll to "DI Water" position Allo.i systen to flusn for 2 minutes.

5.3.32 Upon co.1pletion of flush:

Turn V-ll to " Argon" position W blow expa ision vessel dry 5.3.33 Upoq conpletion of drying expansion vessel:

[h Turn V-ll to Close M?

Shut V-9 Shut V-8.2 5.3.34 Remove radioactive gases from gas system:

Open V-10 Open V-13 Open V-15 Turn V-ll to " vent" position Open V-12 Evacuate system for 1 full minute.

5.3.35 Upon evacuation of gas system:

Shut V-12 Turn V-11 to " closed" position Shut V-15 Shut V-13 Shut V-10 5.3.36 Transport dil uted gas bot tle 'a.i. ult i-channel anal.. c. r in analysis.

m

_s.

WISC0!iSlfi PUBLIC SERVICE CORPORAfl0ll flo.

EP-RLI-3C Kewaunce fluclear Power Plant TITLE:. Post Accident Operation of the liiqh Radiation Sample Room EMERGEllCY PLAfl IMPLEMEllTAT10!1 PROCEDURE

'N DATE: JUN 18-1982 PAGE 13 of 23

-3

-lN)

,1 5.4 Undiluted Liquid Sample 5.4.1 Proceed to HRSR per llP/RPD recommendations.

5.4.2 Check ventilation on, in " normal" positio.n and high vacuum lights. indicate " normal" for the LSP and CAP.

5.4.3 Check radiation levels' in HRSR, and in maintenance area behimi panels, if access is necessary.

5.4.4 Check the following lab equipment available and operationa!:

a.

DI water flush' hoses connected to LSP and supply velve open.

b.

Check velve lineup per Attachment fl.

c.

Reach rod for remote valve ope. ration, d.

thw undiluted liquid sample bottle avai.leble.

e.

flew undiluted liq'uid flush bottle, with special teol, available.

f.

Sanple cask available with undiluted sample piston instali.d.

9 Light on in undiluted sample port of LSP.

9' y.a 5.4.5 Install undiluted sample bottle in cask and check for praper

. operation.

5.4.6 Install the sample cask under the undiluted saniple port and position the bottle up en the needles.

5.4.7 Have Control Room Operator 'open RC-422 and RC-423 -(nut requir d for RHR sanple).

5.4.8 At the Sa,ple Acqui sition Panel :

For RClit Sample:

Open CC 314 Open RC 423-1 For RHR Sample: Open CC 316 Open RilR 81-A (81-B)

For all samples:

Turn RC-437-1 (or 437-2)' to DDT.

5.4.9 At.the Liquid Sample Panel:

Open V-3 Open V-1.2 (V-1.1 for RilR)

WISC0flS!!i PUP,LIC SERVICE CORPORATI0il' fio.

EP-RET-3C Kewaunee fluclear Power Plant TITLE:

Post Accident Operation of the Iligh Radiation Sample Rnom EMERGEflCY PLAN IMPLEMEflTAT10fl PROCEDURE DATE:

M 181982 PAGE 14 of 23 5.4.10 Regulate Reactor Coolant (RilR) flow using RC-VREL-1 until flow indicator RC-FI-l indicates between 35-40 inches of water.

Maintain this purge-for a minimum of 5 minutes.

NOTE: A D/P of 35-40 inches of water on RC-FI-l is equal to approximately 1/2 gpm flow rate.

5.4.11 Upon completion of the purge:

Shut V-3 Open V-2 Open V-7 5.4.12 Regulate Reactor Coolant (RiiR) flow using RC-VREL-2 until 'flos indicator RC-FI-2 indicates 18 to 22 inches of water.

!!a intain 1

this purge for a raiai.m1 of 3 minutes.

fl0TE: A D/P of 18 to 22 inches of' water on RC-F1-2 is equal to approximately 200 cc/ min.

5.4.13 Upon completion of the purge: ' Turn V-19 to "sartpl 2".

~ q Observe flow into/thru sample bottle to waste.

Purga time y,i required only to insure bottle is full.

e-5.4.14 'Upon completion of sample fill:

Turn V-19 to " bypass" t

Shut V-1.2 (V-1.1 for RilR) i Open V-4 5.4.15 While systen is in D1 water flush, return undiluted sample to cask, close lead top, and r'emove cask froia lab. -Install auxiliarf shield.

l NOTE: 01 water flush shoulii' he perforne.1 f,r a ninim:ri V 3 minutes before gaing to step 5.4.iu.

5.4.16 Place undiluted sample flush bottle, and special flush tool into position.

l Turn V-19 to " sample" Allow system to flush for an additional 3 minutes.

l 5.4.17 Upon c'ompletion of sample flush:

Turn Y-19 to " bypass" l

Shut V-7 l

Shut. V-2 l

5.A.18 Have Control Room shut RC-422 and RC-423 (not raluired for RilR sauple).

l

- W

0.

i l

WISC0HSitt PUBLIC SERVICE CORPORAT10fl.,

fio.

EP-RET-3C 4

I Kewaunee fluclear Power Plant TITLE:

Post Accident Operation of the High Radiation Sample Room

El4ERGE!!CY PLAft Il4PLE!4EllIAT10fl PROCEDURE DATE:

PAGE 15 of 23 JUll 181982 i

/

~ ~

I 5.4.19 dt the Sample Acquisition Panel:

For RCllL Sample: Open FPC-51 Open FPC-51-14 For RilR Sample: Shut RilR 81-A (81-B)

Open FPC-51 Open FPC-51-41.

5.4'.20 At the Sample Acquisition Panel:

Open V-1.2 (V-1.1 for RllR)

Open V-3 Observe thish. tater flox rate of 35 to 40 in:.h.n of ui:er, c:.,

indicated on F1-1.

11aintain this flush for a minimuri of 5

r. e f. n.

5.4.21 Upon completion of flushing:

Shut' V-1.2 (V 1.1 for RitR)

Shut V-3 0

5.4.22 At the Sample Acquisition Panel:

For RCill Sraple:

Shut RC-423-1 C..-

Shut FPC-51 Snut FPC-51-14

, ~y 1

Shut CC-314 For RilR Sa.nple:

Shut FPC-51-41 4

Shut FPC-51 i

Shut CC-316 For All Sr7 es: Turn RC 437-1 (437-2) to VCT, 1

i 5.5 Containment flydrocen Monitor 1 A 3 IB Operation Pr.'ce ture 5.5.1 Proceed to llRSR per HP/RPD re'commendatio1s.

5.5.2 Check ventilation on in " normal" position.

5.5.3 Check radiation levels in HRSR and maintenance area behind panels, if access is necessary.

5.5.4 Cneck to nake sure remote panels are in stand-by and 'uv S.'.!

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> wanuup time.

i

-5.5.5 Insure heat tra'cing is energized and operational.

5.5.6 t' heck moni tar select ion at Sauple Acquisit ian Panel

!> Hmd '

it is not sampling same loop as the Chi'.

4 F

-.--.w-a

.-.,-,,-.,.-,,,-+_..,,m..,-,.--n.-

--.-~v--

-.,,-.n., -.,.

-. =. _

}

  • .
  • WISC0 tis!!! PUBLIC SERVICE CORPORATIOrl NO.

EP'-RET-3C Kewaunee fluclear Power Plant TITLE:

Post Accident Operation of the Iligh Radiation Sample Room b El4ERGEllCY - PLAll liiPLE!4EllTAT10ft PROCEDURE '

{

?(G DATE:

JUN ig jggp PAGE 16 of 23 l

1 5.5.7 Call Control Room to open valves RBV-14-3 and RBV-16-1 and RBV-14-1, for 112 Analyzer A.

3 5.5.8 Call Control Roo;a to open valves RBV-14-4 and RBV-16-2 and RBV-14-2, for il2 Analyzer B.

5.5.9 Push the " remote select'or" pushbutton to gain access at the remote panel.

1 5.5.10 Switch analyzer to Scn,ile ide.

Al l oa l J ai na'.m f.;r.a. /,12 purge time.

5.5.11 Read sonple in percent hydrogen of f remote panel meter.

1 l

l'0T E :

If problems are encountered with selected an,ilyzer, to

]

to SAP and after checking status of CASP switch to other analyzer, and repeat procedure.

5 7-5.6 Containment Air _Samole ' Panel Operation

(" ' ?

5.6.1 Proceed to llRSR per llP/RPD recommendations.

5.6.2 Check ventilation on and in "nonaal" posi. tion and high vacuuo lights indicate "norr.al" for the LSP and CAP, an:i CASP.

5.6.3 Check radiatio'n levels in llRSR and in:aaintenance area behinJ panels if access is required.

5.6.4 Insure that fl2 supply regualtor is set at 150 psi and bottle j

contains at least 500 psig.flg.

5.6.5 Insure that when selecting sa:aple loop A or H that either hydrogen monitor is not operating or' loop selected is opposit.2 that being used by monitor.

}

5.6.6 Verify that CASP and CASP Control Panels are energized and

~

opera t i ona.l.

l S

---.-nnn-,nc-a

.s-w-

y,.

g

_ - - ~., -

---.,n.

,,p--,r, ae,

WI.SC0flSIll PUBLIC SERVICE CORPORAT10ft N0.

'EP-RET-3C

~

Kewaunce fluclear Power Plant TITLE: ' Post Accident Operation of the liiqh Radiation Sample Room

[.BMERGEt:CYPLA!!IMPLEMEllTAT10ftPROCEDURE DATE: JUll 181982 PAGE 17 of 23

]-ly 5.6.7 Place the four sample carts in the four sample positions and lock in place.

Check carts are properly locked in by trying to pull away.

NOTE: Only Sample Station 1 can be used for lodine Ana' lysis.

5.6.8 Call Control Room and verify Dom.e Fans l A and IB are operational.

5. 6'. 9 llave Control Room Operator open I set of the following valves:

Loop A

_ Loop B RBV-14-1 RBV-14-2

! '! 3 P.'"l -l M RtiV-16-1 RBV-16-2 5.6.10 Connect local pressure transnitter to cart selected for sampli ng.

5.6.11 CASP two ninute pre-sample back flush:

SV-10 Open

~

SV-6 Open

'SV-5 Open Insure flow monitor on CASP is indicating flow.

5.6.12 Three minute sample capture:

SV-5 Cldsed AV-2 Open Far Sanple Statica 1 - AV-1 and S'.-l.c Ope:.

For Sample Station 2 - SV-2.1 and SV-2.2 Open For Saa;ile Station 3 - SV-3.1 and SV-3.2 Open For Sample Station 4 - SV-4.1 and SV-4.2 Open Open manual inlet and outlet values and close manual bypass valve on saiple cart selected.

Check pressdre tra ts:ii: Ler for indication of negative press, insure CASP Flow Meter is still indicating flow.

5.6.13 Fifteen second flask eiluilibration:

SV-6 Closed

('#'

Flow Monitor on CASP should 90 out.

Pressure Iransaitter should ' reach stability (N0ll:, Eilual to-contaisii:ient pressure).

'WISC0ftS!!i PullLIC SERVICE CORPORATIO!!

NO.

EP-RET-3C Kewaunce fluclear Power Plant TITLE:

Post Accident Operation of the High Radiation Sample Room EMERGEllCY PLAft !!4PLEMEriTAT10!i P.ROCEDURE n

?,,

DATE: JUN 181982 PAGE 18 of 23 1

1 3

. x; C

5.6.14 Three Minute Residual Sample Gas Removal:

~

Close Manual inlet and outlet valves, open bypass valve and close corresponding solenoid valves for station selected in step 5.6.12.

Flow Mon.itor on CASP should still be out.

After 3 minutes open SV-6.

5. 6 e l 5 Initial fif teen second post sample back-flush:

AV-2 Closed Flou Monitor should indicate flow.

5.6.16 Second fi f teen second post sample back-flush:

SV-5 Opm Flow Monitor should indicate flow.

5.6.17 Three minute sample f'lask line flush:

SV-5 Closed Open corresponding solenoid valves for sample st'ation selected in step 5.6.12 and flush for three minutes.

Flow indicator should indicate flow.

f; 5.6.18. Af ter flush is completed, close the following valves in order solenoid valves for station selected in step 5.6.12:

SV-10 Closed SV-6 Cl osed 5.6.19 Call Control Rooni and have ' containment isolation valves selected in step 5.6.12 closed.

CAUT I0ti:

Make sure correct set is clum d to avoid da uging hydrogen monitors.

5.6.20 After cart is removed, reset " Active / Inactive" indicator lights to Inactive mode.

~

l l

p

~

c

=,_

'EP-RET-3C JUtl 181982 Pa9e 19 of 23

^

I Attachment 1

~

' ;g '

P VALVE LINEUP SilEET.

l

~.

Sample Acquisition Panel j

FPC Sample Flush Line Iso.

'CLOSE FPC-51 -41 RilR Sample Flush CLOSE RHR 81-A RilR SMPL 1so A Aux Cool CLOSE kilR 81-B RilR Smpl Iso B Aux Cool CLOSE F

RPC 51-14 RCill Snpl F1usti CLOSE RC-423-1 RCitL Smpl CLOSE FPC-51-31 M/B Demin Inlet Flush CLOSE L D-71 M/B Demin Inlet Iso CLOSE 3

LD-75 M/S Demin Inlet Smpl CLOSE g.,

FPC-51 -21 M/B Demin Outlet Flush CLOSE N

(Di'j LD-81 M/B Domin'0utlet Iso CLOSE LD-85 M/B Demin Outlet Smpi CLOSE FPC-51 -12 Pzr Stm Sp Sapl Flush CLOSE.

RC-403-1 Przr Stm' Sp Smp1 CLOSE FPC-51 -13 Pzr Liq Sp Smpi Flush CLOSE RC-413-1 Pzr Liq Sp Supl CLOSE j

CC-314 Rx Cool llRS lix CC Flow CLOSE CC-316 RilR liRS lix CC Flow

~ '

CLOSE MGR-545 VCT Gas Sp Smpl Iso A CLOSE

{

MGR-545-1 VCT Gas SP Smpl Iso B CLOSE RC-437-1 Smpi Purge Divert h TO VCT RC-437-2 ~

Snpl Purge Divert B 2

IO VCT

.y.;i A

e G

4.-

____-,,_,__m._--.

,.__..mm,,,

~-

EP-RET-3C-JUN 181992 Page 20 of.23

' Attachmerit l' (cont'd).

.' gu.7 h

~

Liquid Sampie Panel

' SHUT.

V-17 Open Grab Sample Y-6.1 -

Rem Smpl Bomb Inlet SilVT V-6.2 ~

Rem Snpl Bomb Outlet SliUT V-5.1 Rem Smpi Bomb Inlet Iso Sil0T V-5.2 Rem Snpl Bomb Outlet Iso.

SilUT 1-V-REL-1 RC Purge Throttle TitROTTLEU V-3 RC Purge Stop

_ Sl!UT

?-REL-2 RC t ;rge tu '.:ane Ta TiiR J ) I I.L.,

V-7 Smpl Bomb Bypass SliUT V-2 RC Purge to Waste Stop SiluT V-1.1 RiiR Supl Iso SHUT-

c. p.3 f[1 V-1.2 RCHL/Pzr Smpl Iso SHUT 4

V-1. 3 (Spa re)

SilVT V-1.4 (Spare)

SHUT '

V-1.5 VCT Gas Sp Smpi Iso

. SilVT 4

V-4 DI L'ater Flush 1s0 SilVT V-S.1

, Press Smpl Bomb Inlet

SituT l

V-8.2 Press 'Smpl Bomb Dutlet SiluT I

V-9 Expansion Vessel Inlet SliUT V-16 Argon Gas Strip Purge SilVT V-18 RC Purge /Backflush PURGE V-19 Undiluted Liq Supl BYPASS RC Purge Waste / CAP WASTE V-22 l

EP-RET-3C JUN 181932 Page 21 of 23

, (cont'd) h Liquid Sample Panel (cont'd)

DV-1 Diluted Liquid Sample BYPASS V-ll Expansion Vessel Outlet SilVT DV-2 Diluted Gas Smpl BYPASS

.V-10 Expansion Vessel Vacuum SilVT V-13 Dil Gas Smpl V5c SifuT V-14 Argon Purge to Dil Gas Sapl SilVT 7-15 Ga:. 5apl to GC Sr!U I V-12 Argon to Eductor Silu r "3

3d Liquid San.nle Panel (Denin Sect)

DV-l.1 CVCS Demin Inlet Iso SilVT DV-1.2 CVCS Demin Outlet Iso SilUT C7-1.3 (Spa re)

SiluI 37-3

. D1 1:3ter Fluon RUI D?-2.1 CVCS Demin Inlet Smpi Siluf DV-2.2 CVCS D2 min Outlet Supl Sil]T DV-2.3 (Spa re)

S lVT e

m e

( erk s

e

E '-RET-3C CUN 18 IS' 2 d

Page 22 of 23

. (cont'd)

CASP Control Panel AV-1/SV-1.2 Smpi Pos #1 Inlet /0utlet CLOSE SV-2.1/SV-2.2 Smpi Pos #2 Inlet /0utlet CLOSE SV-3.1/SV-3.2 Smpi Pos #3 Inlet / Outlet CLOSE SV-4.1/SV-4.2 Smpi Pos #4 Ir[let/ Outlet Cl.0SE SV-5 Sapl Bypass CLOSE SV-10 Nitrogen to Eductor CLOSE AV-2 Return to Containuent Cl.0S F.

SV-6 Eductor Suction Iso CLOSE

?.

(At Sample Acquisition Panel)

RBV-27-2 Cont Air Sapl, A Iso CLOSE RBV-27-3 Cont Air Smpi B Iso

'CLOSE 8

s 9

~

'EP-RET-3C

' M11 t r Page 23 of 23 Attacinent 1 (cont'd)

o..

1

"' Chemical Analytical Panel V-2 IC Smpi Outlet OPEN

. V-5 IC toop Select SilVT V-6

_02 Loop Select 02

. Cal i

V-7 02 Analyzer Select YS1 V-8 0'2 Loop Outlet OPEN V-9 02 Anal Cal Supply SiluT V-10 Inst Air Supply OPEN j

V-11 DI Hater Supply OPE:'

I V-12 Nitrogen Supply OPEN V-la Argon Supply to GC

,,0 PEN j

V Cal-3 Supply OPEN V-17 02 Cal Tk Recirc SilVT

/

V-18 02 Cal Tk 6cain SIIUT V-19 Cal-3 Drain SHUT s

J j

V-20 pli Cal Tk 2 Drain Sil0T V-13 1C Inject Port SitVT V-16 pH Cal TL 2 Supply SHUT t

V-25 pil Cal ik 1 Drain SIIUT V-27 pilCal Tk1 N2 Supply VENT i

V-23 pli Cal TL 2 N2 Supply VENT V-29 Cal-3 N2 Supply VENT 1

V-30 pil Cal Tk Select CAL - l.

V-26 pil Cal Tk 1 Supply StiUl f

V-24 Of Cal ik t ill SilUi

\\'

l s

,,y w- %.

--n~-

"'" ' " ' ' ~ "" '

J WISC0ftSitt PUBLIC SERVICE CORPORATI0li NO.

EP-E0F-7 REV. D Keviaunce fluclear Povier Plant TITLE: Communications and Documentation EMERGENCY PLAll !!4PLEMErlTiflG PROCEDURE m

l

p;i DATE

PAGE 1 of 3 g 211982

. Q.* h s...

r

?EVIEWED BY h(f//fsu./*

M2

~d APPROVED BY C/

e ppt w

/

1.0 APPLICABILITY This procedure provides for the testing of communication circuits and documentation of records in the Emergency Operation Facility (EOF) upon activation.

~

2.0 PRECAUT10'S 1

2.1 Ensure that coia:inication lines are ediblished an1 b2ing mintiinef l

as reqaireit.

2.2 Ensure that appropriate records and logs are started arid maintained as reqaired.

3.0 REFERET:CE'S 4

3.1 EP-AD-17, Comaunications

.hkd 3.2 Kewaunee Nuclear Power Plant Emergency 91an 4,. 0 INSTRUCTIONS 4.1 Emergency Response -Ilanager l

4.1.1 Assign the necessary EOF staff' member (s) to nan EOF vo;na inication links.

i i

4'.l.2 Mcit,tain a lo; record of ai!! sijoificant evnt; aqJ a:tions.

j NOTE:

The following is a list of inform.1 tion that should be considered for docunentatio'n in this log:

1 i

a.

Date and time b.

Nanes of. personnel as'sdning key positions in the enerjency respan'se organization c.

Plant status and canditioqs d.

14ajor steps tasen duri1.J the e.ner.jency e.

Important data received (i.e., results froa dose projections and release calcalations, results fron,.

l radiation suiveys. etc.).

N-9 g---.-n

-__,r.,

,WISC0fiSitt PUBLIC SERVICE CORP 0RATI0ft N0.

EP-EOF-7 Kewaunee fluclear Power Plant TITLE: Communications and Documentation i

.. s*MERGEfiCY PLAll IMPLEMErlTillG PROCEDURE ~

PAGE 2 of 3 DATE: MAY 211982 I 6 u

}

f.

Infonaation exchanged with Federal, State, local and private organizations (i.e., protective action recommendations, class of emergency, projected doses, recontnended emergency act' ions, request for any needed support, etc.).

i g.

Time of closcout or ' reclassification of the emergency.

4.2 EOFConnunicator(s[

4.2.1. Maintain a Communication Log Sheet containing information r:ceirri f co an1 sant to nUpr E ncy n y 6<.conu Far.i f itie e.

and other support organizations.

(See fora LUi-7, lelepitoaa Communications Log Sheet.)

i 4.2.2 Inform the Emergency Response Manager of all infor;ution received from members of the Emergency Response Organization or support organizations.

i

.m n.,

k T ;]

I e

e 9

e l

l l

l i

l 6

~~

1

(

EP-EOF-7 IAAY 21 1982 Page 3 of 3 FORM EOF-7 TELEPit0tlE COMMutilCATIONS LOG $ltEET

.z n::}

DATE:

TIME:

INCOMillG OUTG0iNG Phone Circuit Used:

T0:

FROM:

Message:.

I a

......_.......I I Received by:

. _. = _

r DATE:

TIME:

It!COMll!G OUTG0ING Phone Circuit Used:

I T0:

FROM:

t Ilessage:

G' q

,,.s; qq 9

l Received by:

,l

.i 1

i l

DATE:

TIME:

l INCOMING OUTGOIt!G [ Phone Circuit' Used:j i -

TO:

FROM:

i Message:

l i

i i

l

_. = _ -

=-=_-

z,

. wa.

l i

l Received bv:-

= _ - _ _ _ - - - -.........

e w

,-a 3

v

- - _ -. ~. _

j a.

NO.

EP-EOF-1 REV. E ___

WISC0tiSIti PUBLIC SERVICE CORPORAT10ft TITLE: Corporate Staff Emergency Kewaunce fluclear Power Plant.

Response Organization IMERGEliCY PLAft IliPLEMEriTIf;G PROCEDURE DATEjgg 18 $82 PAGE 1 of 7

,y.

REVIEWED BY j f # b I3

^!b APPROVED BY [ 4) j gh /

ec

/

(

1.0 PURPOSE This procedure describes the response of the Corporate Staf f members to an activation of the Kewaunee lluclear Power Plant Emergency Plan.

^

2.0 APPLIC ABl_ L11Y_

This procedure applies to members of the Corporate Staff following their oxi ficnion of ' % ac'.ivs'. ion of the Ewrjency Pl an.

i i

3.0 REFERE!1CES 3.1 Emergency Plan Implementing Procedures (EPIPs).

3.2 Wisconsin Public Service Corporation fluclear Emergency Public 9

Information Plan.

(?M

3. s 3.3 Kewaunee Nuclear Power Plant Emergency Plan.

4~.0 RESP 0tlSIBILITIES

'~

4.1 Emergency Response Manager (ERM) 4.1.1 If warranted, activates and provides the overall direction of the'Euacgency Response Organization and the Energency Operations Facility (EOF).

4.1. 2 Determines the extent of the corporate response required (Table EOF-1.2).

j 4.1. 3 Ensures that a desginate for each position of the corporate emergency response organi zation (Table EOF-1,1) is notified.

4.1.4 Establishes communications in accordanc'e with EP-EOF-l.

Connfonications and Documentation.

4.1.5 Ensures of fsite radiological accident assessment is being performed and evaluates recommended protective actions with the Environmental Protect. ion Director (EPO).

4.1.6 Provides information via corporate management to the Publis p( s3 intormation Director (Plu) for disspmination to the public.

i e

,w,q-,

-w

,w~.

,,<.e--

- - -,- -. -- - --.---w

.-------n-

WISC0liSill PUBLIC. SERVICE CORPORAT10f!

NO.

EP-EOF-1 Kewaunce fluclear Power Plant TITLE:

Corporate Staff Emergency Response Orqanization EMERGEllCY PLAll IMPLEliErlT!ftG PROCEDURE

- ;;4 4.1.7 flotifies appropriate offsite agencies of emergency status of the plant and any change in status as required in notification procedures (EP-E0F-3,4,5,6).

4.1.8 Directs the Admin / Logistic Director (A/LD) to provide for needed assistance and support frota ftSS suppliers, other utilities, AE/ Consultants, and Federal, State and local agencies and other WPS personnel.

4.1. 9 Responsible for ensuring anSulance and medical services for accidents involving eaergency response personnel diich may occur outside tne protected area.

4.2 Enviru nn&Protec ti:n Diroc'.or 4.2.1 Directs the radiological environhental survey and monitoringf evolutions.

4.2.2 Informs the E N of of fsite dose para":eters and dose pr3dictioqs and reco.ii.nends appropriate protective actions to be Laken to

.. A the ERM.

  • =)

4.2.3 Assuaes the rasponsibilities delineated in EP.EtiV-1, Environ-

~

mental rionitoring Team Organization.

4.2.4 Perfonas the actions delineated in EP-Etiv.-3A, Environnental Protection. Director Actions and Directives.

4.3 Admin / Logistic Director (A/LD) i

,4.3.1 Coordinates the procurement of needed supplies and equipnent.

4.3.2 Performs the actions to catain a,1ditional.nanpo.ter as necessary froa support agencies.

4.4 Public Information Director (PID) 4.4.1 Disseminates infonnation on plant condi~tions to the public.

4.4.2 Carry out assigned respon'sibilities is described in R.'f. 3.2.

NOTE:

The corporate staf f response is based on the classification of the energency event as determined by onsite, personnel.

4

\\ $d)

V 4

o j

1 4

.. =

WISC0!lSIfl PUBLIC SERVICE CORPORAT10ft t0.

EP-E0F-1 i

Kewaunce fluclear Power Plant TITLE :

Corporate Staff Emergency Response Organization 4

.' zu Et4ERGEllCY PLAll !!iPLEf4EllTitlG PROCEDURE

d M DATE: JUN 181982 PdGE 3 of 7

%;t;y 5.0 REQUIREf4EilTS

~~

J l

5.1 Unusual Event a

5.1.1 The ER!i is notified by the plant staff of the emergency condition i

and, following verification, performs notifications in accordance with EP-EOF-3, Corporate Response to an Unusual Event.

5.1. 2 The PID issues routine news releases to infona the public as neco sary.

5.2 Alert 5.2.1 The ibus, upon notification and veri fication of tiie e. net ynqj event, calls the Energency Director to determine the severity of the cuergency ev.ent.

A detonaination of whether or not to activate EOF will be made.

  • 4ith this determiaution in mind, perfonn applicable notification in accord'ance with EP-EOF-4, Corporne. Response to an Alert.

i t.1 5.2.2 If warranted, the ER:4 uill proceed to the Sita A cess facility

.7 and activate the EOF in accordance with EP-EOF-2, Emergency Operations Facility Activation.

5.2.3 The A/LO, when notified by the ER!i that the EOF is being i

activated, performs applicable required notifications in j

accordance with EP-EOF-4, Corporate Response to an Alert, and then proceed to the E0F via the SAF.

l 5.2.4 Tne EPD, khen notified by the ERi4 that the EUF is being activated, perfonns applicable required actions in accnrdance with U-Dr.'-M, Ewir.m.ie ital Pron;Uo, Dir r:Wr fu '. i c t.

Directives.

5.2.5 The PID, when notified by the ER!i will initiate PID notifica-tions in accardance with Ref. 3.2 and then procee.1 to ami activate the Joint Public Information Center (JPIC) if requestad.

5.2.6 The ERi1 determines the aucunt of corporate response needed (Table EOF-1.2).

j 5.2.7 The ERM, upon being notified by.the Emergency Director of the close out tron the e,nergency event, coanences deactivat iJa of E0f.

(#-a x

es 4

e

WISC0!! Sill PUBLIC SERVICE COR."0 RAT 10ft N0.

EP-EOF.

Kewaunce fluclear Power Plant.

' TITLE : ' Corporate Staff Emergency Response Orqanization A

EMERGEfiCY PLAff IMPLE!4Ef1TIriG PROCEDURE

[43 DATE:

n:p) dliN 181982 PAGE 4 of 7 y

5.3 Site Emergency 5.3.1 The ERM, upon notification and verification of a' Site Emergency, will perform notifications in accordance with EP-EOF-5, Corporate Response to a Site Emergency.

5.3.2 If not previously activated, the ERM proceeds to the SAF and performs EOF activation in accordance with EP-EOF-2.

, 5.3.3 ERM upon completion of. EOF activation contacts.the Elaergency Director or his representative in the TSC to obtain an -

update on the condition of the cuargency and assume offsite not i fico t f or re;ponsi5ility.

5.3.4 The A/LD, when notified of the Site Emergency, parforms appli-cable required notifications in accordance with EP-EOF-5,

/

Corporate Response to a Site Emar9ency, and then proceeds to the EOF via the SAF.

x 5.3.5 The EPD, when notified of the Site Emergency, performs M

applicable required actions in accordance with EP-ENV-3A, Environmental, Protection Director Actions and Directives.

5.3.6 The PID, when notified of the Site Emergency, activates the JPIC and makes notifications in accordance with Ref. 3.2.

5.3.7 The ER'1 reco:cends to State and local governuents protective action that needs to be t.aken as a result of the event.

5.3.8 Ine ER!i will pra/ide information via the corporate mana leuent to the Public Information Director.

5.3.9 The ERM, upon being notified of the close out fron 'the emergency event, commences deactivation of EOF or recovery operations per EP-AD-15, Recovery Planning, if applicable.

5.4 General Energency 5.4.1 The CRM. upon notification and verification of a General Emergency, wi'll perform notifications in accordance with EP-EOF-6, Corporate Response to a General Emergency..

i 5.4.2 The ERM proceeds to the SAF arid performis EUF activation in l

accordance wi th LP-Edf.-2, fp'rdency Operations f acili ty Act i v.it ion.

Mc4 i

N y

~ ' '

WISC0i(SItt PU15LIC SERVICE CORPORATI0rt -

.t10.

.EP-EOF-1 Kewaunee fluclear Power Plant TITLE:

Corporate Staff Emergency Response Orqanization

- EMERGEllCY plait IMPLEMEllTlf1G PROCEDURE DATE: 3;1g)ggp PAGE' 5 of 7 5.4.3 The ERM provides the overall direction of the EOF, including recommendations to the State to initiate pred 2tennined protective actions for the public.

5.4.4 The A/LD, when notified of the General Emergency, perfonas notification in accordance with EP-E0F-6 and then proceeds to the EOF via the SAF.

~

5.4.5 The EPD, when notified of the General Emergency, perf orms applicable required actions in accordance with EP-Elr/-3A, Environmental Protection Director Actions and Directives.

5.4.6 The PID, when notified of the General Emergency, activates.

x the JPIC and makes notifications'in accordance with Ref.

f 3.2.

5.'4. 7 The ERM, upon being notifitd'of the close out from the emergency event, contnences deactivation of EOF or recovery e

q);

operations per EP-AD-15, Recovery Planning, if applicable.

s.,f e

O e

6 9

f l

l s

e e

P e

~.

=.

8 q

EP-E0r-1 udN 181932 Page 6 of 7

'f' is N.

., @Q

.w.

TABLE E0F-1.1 s

CORPORATE EMERGE!!CY ORGAf112ATION

'CORRELATI_0ft BETWEEll fl0RMAL AfiD EMERGEf!CY ORGAf1IZATI0ft TITLES i

s i

~

EMERGEilCY NORMAL ORGAtlIZATI0tl TITLE ORGAfilZATION TITLE PRIllCIPAL

~

ALTERilATE

~

l 'M On' erg'ency Response Manager-Nuclear

~1. V. P. Nuclear Power Manager lower

- 2. fluclear Services Supv.

1

'3; Nuclear Licensing and 4

m Systems Supervisor T.s JM ie a r ".fm i n i !.r u t i.

1

~

o Supervisor c

.w s

Environmental Prot.

Environmental Supervisor l'.

Environ. Biologist Di rector

2. Environmental Analyst

.3

.'l 3

3 Administrative / Logistics Nuclear Services l'. Nuclear Design Change

, Director Supervi sor Supervisor'

2. Nuclear Technical 7

x k

Review Supervisor

.?

3. Power Plant-Design h

(~

4. Nucissir Administrativ:'

' Sapervi sor N

i Supervisor s

'3 A

^

Public Infonnation Nuclear Infonnation

1. Advertising and Public Director Coordi nator Infonnation Director.
2. Public Af fairs-Director 3.3, s

t N,

3 ig g

s s

GEk I

4

?

l s' N

P-EOF-1 Ull 181982 Page 7 of 7 TABLE EOF-1.2

^ *f,j EOF EliERGEftCY CALL LIST.

tiame Office #

110me Il Pager Code

?

Addi L iO!1dl pef'50litiel i:1.ly be resjui! Sled I r Ja n ;.le i b' S' ll't by t o r t '..t s' ; I t h,j the TSC Director.

k w

em

WISC0!1 Sift PUBLIC SERVICE. CORPORATI0ft NO.

EP-EOF-3 REV. E p,

Kewaunce fluclear Power Plant TITLEi Corporate Response to an Unusual Event N EMERGEftCY PLAll lMPLEMEllTlflG Pl?0CEDURE fj DATE: Jg i g g PAGE 1 of 3 hfoD2Ala //'

8, Mde,(/

AlPROVED BY

[/f(

L,r) W i

REVIEWED BY i

i 1.0 APPLICABILITY 1.1 This pro,cedure is to be implemented upon the declaration of an Unusual Event, or at the request of the Emergency Response 11anege r.

,e 4

2.0 PRECAUTIO':S 1

j 2.1 If an emergency class escalation occurs during the notifications, proceed to the notification procedure for thc new emergency classifi-cation.

';D 3.0 REFERE!!CES 3k 24' 3.1 EP-EOF-1, Corporate Emergency hesponse Organization 3,2 EP-AD-17, Communications 3.3 EP-AD-15, Recovery Planning

~

4.0 If1STRUCT10NS 4'.1 Emergency Response Hanager (ERM) Actions 4.1.1 Initial Actions and I;otifications i

a.

If notified by pager, confirm contact with a telephone call to b.

Notify a designate for each of the corporate emergency positions.

Telephone contact should be utilized, per l

Form E0F-3.1.

NOTE: Contacts made for information purposes only.

O e

o s' 11 0.

EP-EOF-3 WISC0ftS!ff PUBLIC SERVICE CORPORATI0ri Kewaunce Nuclear Power Plant TITLE: Corporate Response to an Unusual Event

~

Md4ERGEflCY PLAN I!4PLEMENTING PROCEDURE A

PAGE 2 of 3 D.TE: JUIl181982

.' O' Determine the need for corporate staff response.

This c.

determination may be based upon plant status or requests from plant personnel.

4.1.2 Unusual Event Close Out Upon notification o'f Unusual Event close out from the a.

Emergency Director, notify the previously contacted emergency position designates of the e.nergency close out and document on Form EOF-3.1.

4.1. 3 Final Conditions j

A higher class of emergency has been declared by the a.

Emergency Director and one of the following procedures is being implemented:

1.

Corporate Response to an' Alert, 'EP-EOF-1 2.

Corporate Response to a Site Emergency, EP-EOF-5 k{'jp 3.

Corporate Response to a Gen'eral Emergency, EP-EOF-6 b.

The Unusual Event has been. closed out 'and no recovery operations are required.

The recovery phase criteria have been met and the c.

emergency organization is shif ting to a recovery mode, by implementing the recovery procedure, EP-AD-15,

, ecovery Planning.

R 4.2 Public Information Director (PID) Actions 4.2.1 Upon notification from the'ERf4, perform normal press release actions in suppurt of the Unu'sual Event.'

l e

[a x

9

EP-E0F-3

.JUN 181982

,p Page 3 of 3 FORM E0F-3.1

~

J

.4.1.1 Initial Notification of Corporate Emergency Personnel b.

PUBLIC INFORMATION DIRECTOR OFFICE #

HOME #

INITIALS ll Designate Contacted Time ENVIRONMEllTAL PROTECTION DIRECTOR Time Designate Contacted l

ADMlldLOGISTICSDIRECTOR m

l55

-w;<

Designate Contacted TIME l

NUCLEAR ADilINISTRATIVE SUPERVISOR Morrison, J.

Time Contacted 4.1.2 Notification of Emergency Closeout TIME INITIALS

a. Public Infonnation Director l

Environ.:; ental Protection Director j

Admin /Logistles Director l

l Nuclear AJninistrative Supervisor

\\

l

{"

i s

WISC0ftS!!! PUBLIC SERVICE CORPORATION tt0. -

EP-E0F-4 REV. E 3,

l' Kewaunce fluclear Power Plant TITLE: Corporate Response to ALERT-EMERGEflCY PLAll IMPLEMEflTitiG PROCEDURE DATE: JUN1g.'1982 PAGE 1 of 15 kEVIEHEDBY J/ /4 A /b O ' d...d u /[

APPROVED BY ~

f)/4At b 1.0 APPLICABILITY 1.1 This procedur~e is to be implemented up.on the declaration of an Alert, or. at the request of the Emergency Response Manager.

2.0 PRECAUT10f!S 2.1 If an emergency class escalation occurs during the notification, immediately implement the notification procedure for the neu emergency classificStion.

2.2 All pages should be sent on both transmitters to ensure maxinun area coverage - Kewaunee transmitter (plant ext

.), Green Bay transmitter (plant ext 315 or Green Bay ext 2.3 All Green Bay pager transmissions must have the pager number preceded by

_.g:jg a (1).

p

3.0 REFERENCES

3.1 EP-EOF-1, Corporate Emergency Response Organization 3.2 EP-AD-17, Communications 3.3 EP-EOF-2, Emergency Operations Fa' cili ty ' Activation 3.4 EP-EOF-9, Interface 'with Support Organizations 3.5 EP-ENV-3A, Environmental Protection Director Actions and Directives 3.6 EP-ENV-38, Environmental Monitoring Team Actions l

3.7 EP-AD-15, Recovery Planning 1

3.8 Nuclear Emergency Public Information Plan 4.0 INSTRUCTIONS

^

4.1 Energency Response Mananer (ERM) Actions-NOTE:

Notifications may be pertornled by a communicator designated by tne ERM.

,. _,:3

e :

t l

l

j 1

NO.

EP-EOF-4 WISCONSIN PUBLIC. SERVICE.CORPORATIO!!

Kewaunee Nuclear Power Plant TITLE: Corporate Response to ALERT

..hEMERGENCY PLAN.!MPLEMENTING PROCEDURE

'DATE: ~ d,UN 181982 PAGE 2 of 15 g

4.1.1 Initial Actions and Motifications Upon notification and verification of an Alert a.

condition, contact the Emergency Director to see if EOF activation is necessary.

NOTE:

If notified. by pager, confira contact with a telephone call to

~

b.

Notify a designate for each of the corporate energency positions and,brief designates on plant status per form EOF-4.1.

Phone contact should be used if time permits.

NOTE:

If unable to contact one person from each group by using hone or office telephone. numbers, activate the.pager' system per attached Table EOF-4 or call Syste.a Operating at and provide your name and title and the nanes and titles of the individuals you wish to paje.

Al so

?>

provide a brief -(20 seconds) message to be broadcast over the ggj pagers.

System Operating personnel will attempt to ccntact these individuals via the paging system.

c.,1f the decision is not to activate the EOF proceed to Step 4.1.1.j.

d.

If the EOF is to be activated:

1.

proceed to the SAF and activate the EOF in accordance with EP-EOF-2 and, 2.

as necess.1 y conm' a : !i!ional gers.' *e' v < t if1 EOF using phone nunbers listed in procedure LP-t0F-1, Table EOF-1.2.

t 3.

following conpletion of EP-EOF-2 continue this procedure with Step 4.1.1.e'.

If TSC has not already riade Lae initial Aler; noti!1;dtions, e.

noti fy th'e State and local govertrients us i ng tne ";.','. 45 phone and document the contact on For.:t E X - 1.1.

s.-

i i

WISC0!1Sitt PUBLIC SERVICE CORPORAT10!1 il0.

-EP-EOF-4 Kewaunee fluclear Power Plant TITLE: Corporate Response to ALERT lh.) EMERGEllCY PLAtl !!4PLE!4EllTIriG PROCEDURE

' DATE: ' JUtl 181982 PAGE 3 of 15

^

3 The following statement should be given:

Kewaunee fluclear calling Wisconsin Warning Center 1, East Central Area, Kewunee County, and Manitowoc County.

Please acknowledge.

Wait until all four areas have acknowledged, then continue.

If any area fails to acknowledge, ~ask War.ning Center 1 to ring that area.

All areas please take the foll3uing message:

This is (title) at the ':rawnee thclear Plant.

An inciden-hes occurred at our facility and we are declaring an Alert at (time) on (date).

Tnere (has/has not) been a radiological release.

No off-site con-sequences or evacuation of residents is expected.

The State Radiological Response Teaa and key response personnel saould be be notified.

Prepare to activate Emergency Operations Centers.

CN,a V

We will keep you informed of the situation.

Any confirming calls or return contacts should be. through co.nmercial telephone.

To repeat: Kewaunee Nuclear Plant is declaring an Alert (time) on (date).

Please relay this information to Energency Government immediately.

Please acknowledae receipt of this messace.

f.

If the TSC has not already made the initial Alert notification notify the United Statas Coast Guard using coamercial telephone lines with the text of the previous., message and document the contJct On Foni EJF-4.1.

9 Evaluat s of f si te radiological condi tions wi th th.' n'!). W.

and E0, and recommend protective actions, if warranted, to State and local authorities, per EP-ENV-5. Protective m.iot Reco:nmenJ $ t ions,

h.

Contact the.TSC and complete Fona EdF-4.2 and prokide st.atus aplates to support at;encies at 'iatual ly.tr.'

upon intervals.

v.44 s

e

WISC0!!Siti PUBLIC SERVICE' CORPORATION N0.

EP-E0F-4 Kewaunce fluclear Power Plant.

TITLE: Corporate Response to ALERT EMERGEllCY PLAll IMPLEMENTING PROCEDURE c.

DATE: -

JUtl 181992 PAGE 4 of 15 y

1.

Brief the EOF staff periodically on the status of the emergency and pertinent plant conditions, j.

flotify the Institutue of Nuclear Power Operations (INPO) and inform them of the Alert condition, per Form E0F-4.1.

k.

Notify American Nuclear Insurers (ANI) and infona them of the Alert conditions per Fona EOF-4.1.

1.

As necessary, perform any additional support organization notifications per EP-EUF-9, Interface with Suppart Organi za tions.

4.1.2 Alert De-escalation to an Unusual Event a.

Noti fy the corporate emergency directors of' the emergency class change, per Form EOF-4.1.

b.

flotify the Institute of fluclear Power Operations (IMPO) of the emergency class change per Fonn E0F-4.1.

,!M

^ 'l c.

Notify American Nuclear Insurers (ANI) of the emergency class change per Form EOF-4.1.

s d.

If the E0F is activated, notify t'he support agencies with the NAUAS phone of the emergency class chahge and docu': tent the contact on Form EOF-4.1.

The following statenent should be given:

l' I

Kewaunea :...cie3r calling,isconsil Wcraing Centar 1, L1,t Cen:.ral Area, Kewaunee County, and Manitowoc County.

Please acknowledge. l l

WJ-it until all four areas have ackno.vledged, then contima?.

If any area falls to acknowledge, ask Warning Center 1 to ring that area.

O O

(~_.O q

\\_;<

=

9 5

,-,--.y

_y

I WISC0llSill PUBLIC SERVICE CORPORAT10rl NO.

EP-EOF-4 Kewaunce Nuclear Power Plant TITLE: Corporate Response to ALERT' 3

EMERGErlCY PLAll IMPLEMEllTIflG PROCEDURE DATE:

j[yl 181932 PAGE 5 of 15 This is (title) at the Kewaunce Nuclear Power Plant. Conditions have iinproved and we have de-escalated the Alert to an Unusual Event at (time) on (date).

.To repeat: The Alert has been de-escalated to an Unusual Event at (time) on (date).

Relay this infonnation to Emergency Governuent immediately.

Please acknowledge receipt of this' message.

__l e.

flotify the United States Coast Guard using co.nmercial telephone lines wit'i the text of the previo.as.qenvje.ui!

document the contact on Form E0F-4.1.

4.1.3 Alert Close Out h.

Notify the corporate energency directors of the emergency close out per Form E0F-4.1.

Jyg b.

Notify the Institute of Nuclear Power Operations (IrlPO) of the emergency glose out per Form EOF-4.1.

c.

Notify knerican Nuclear Insurers (ANI) of the e.nergency close out per Form E0F-4.1.

d.

If the E0F is activated, notify the support agencies using

~.

the flAUAS phone of the emdrgency close out and document the contact',on. Form E0f-4.1.

~

The following statement should be given:

Kewaunee Nuclear calling Wisconsin Warning Center 1, East Central Area, Kewaunee County, and Manitowoc County.

Pleasa acknowl?. ige.

Wait until all four areas have acknowle.1 ed, then continue.

9 if any area fails to acknowledge, ask Warning Center 1 to ring that area.

l

(<m

\\

I

WISC0flSIft PUBLIC SERVICE'CORPORAT10ft NO.

EP-E0F-4 Kewaunee Nuclear Power Plant.

TITLE-: Corporate Response to ALERT

^%

EMERGEllCY PLAN IMPLEMEllTING PROCEDURE 3

DATE:

JUN 181982 PAGE 6 of 15 This is (title) at the Kewaunee Nuclear Power Plant.

ilehave closed out the Alert at (time) on (date).

To repeat:

The Alert has been closed out at (time) on (date).

This verbal close out will be followed with a written summary within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Relay this infon.ution to Energency Govern ient innedi.itely.

Please acknowledge receipt of this message.

e.

Notify the United States Coast Guard using commercial telephone lines with the text of the previous message and document the contact on Form EOF-4.1.

f.

Perfona EOF deactivation in accordance with Section 4.2 of EP-EOF-2, Emergency Operations Facility Activation.

4.1.4 Final Conditions (one of the following) a.

A higher class of emergency has been declar'd by the e

Emergency Director and one of the following procedures is being implemented:

1.

Corporate Response to a Site Emergency (EP-EOF-5) 2.

Corporate Response to a General E:aergency (EP-ECF-6)

D.

T'ie Alert hds 5.:ca reclas ;i t ied.-; a1 ?in.. ;a l :., cu ',.i n i EP-EOF-3, Corporate Response to an unusual Lvent, is being impl e.nen t ed.

c.

The Alert has been close.1 out.in 1 no ruovery over.d io'is are required, d.

The recovery phase criteria have been met and the energencj organi.'.it ion is shi f ting to a recovery mo.te. Sy i ns tment i'y EP-AD-15, Recovery Planning.

e a

f + 4.e.. *, efs I

a

,1WISC0riSIrlPUBLICSERVICE. CORPORATION NO.

EP-EOF-4 Kewaunee Nuclear Power Plant TITLE: Corporate Response to ALERT EMERGENCY PLAN IMPLEMENTING PR.0CEDURE g

DATE:

JUN 181982 PAGE 7 of 15

(-

4.2 Public Information Director (PID) Actions 4.2.1 Upon notification froa the ERM, perform nonnal press release actions in support of the Alert condition.

4.2.2 IfrequestedbytheEkM,activatetheJointPublicInformation Center per reference 3.8.

4.3 Environmental Protection Director [EPD) Actions 4.3.1 Perform actions in accordance with EP-ENV-3A, Environmental Protection Director Actions and Directives.

4.4 Environmental Monitoring Team (EMT) Actions 4.4.1 Perform actions in recordance with EP-ENV-3B, Envirannental Monitoring Team Actions.

4.5 Admin / Logistics Director (ALD) Actions

d 4.5.1 If notified by pager, confina contact with a telephone call to

. the SAF at J.

4.5.2 If informed of EOF activation by the ERM, contact a recorder per Form E0F-4.3 and proceed to the EOF via the SAF.

4.5.3 Obtain necessary administrative support froa the list on Form E0F-4.3 and inform th' m of where they should report.

e 4.5.4 Perfonn the actions necessary to obtain additional manpower, supplies a nd e.;ui;t ent. as retpiec.m! Sy the fir: ' i wea '.mce with EP-EOF-9.

1 S

e A

. m

P-C0F-4

,{.y I 8 l'IU2 Page 8 of 15

~

jf$)

Table E0F-4 PAGING SYSTEM OPERATION s.

A.'l' Tone and Voice Radio Pagers are assigned to personnel as shown with call numbers on the Emergency Call List.

A.2 Whenever it is necessary to contact a person on the Emergency Call List and he is not on site, the home telephone number.should be called first.

If he cannot be reached at home, contact should then be attempted by using the person's individual call number.

A group of individuals may be contact'ed by using the group call number.

Tone and voice contact by pagers is ef fective within a 15 mile radius of the transmitting station.

Only-tone contacts 'an be made outside the 15 mile radius.

c A.3 llow to Place a Page 3.1 Determine the two digit pager code for the party or group you wish to contact from the pager assignment list.

PLANT EXTENSION Pil0NES

??g 3.2 Dial the tenninal acces's code on any plant extension.

a Kewaunee site transmitter -

Green Bay transmitter -

a.

When the terminal answers and responds with a beep, go to step 3.3.

b.

If you hear a " busy" signal, hang up and try again.

3.3 Dial the two digit. pager code for the party or grou,).>ou.vis;i to contact from the pager assignment, list.

NOTE:

This number must be preceded by a "1" when using the Green !!ay -

trans,ni tter.

3.4 Listen for the acknowledge (beeping) tane, indicatin : ;'a.: ' Se in9 transmitted.

3.5 When the beeping' tone stops. speak your message to the called l'irty.

You have about 20 seconds to talk.

Your all otte 1 ti.ie has es,' Ire I when you hear the "Dusy" tone returned to the telephaiv.

lia n., di'

  • te phone.

G

EP'-E0F-4

~

JUll181982 Page 9 of 15 T,q

. TABLE E0F-4 (cont'd)

/

,a..

GREEli BAY EXTEf1510ft PH0flES 3.6 Dial:

a.

For Kewaunce site transmitter -

b.

For Green Bay transmitter -

3.7 When the terminal answers and responds with a beep, 90 to step 3.3.

a.

If yo'u hear a " busy" signal, hang up and try again.

3.8 Dial the two digit pager code for the party or group you wish to cuntaci. fra a the pa f:r is s t y:.ient li st.

110TE:

This nu:nber must be preceded by a "1" when using the Green fiay transmitter.

3.9 Listen for the acknowledge (beeping) ' tone, indicating page being transmitted.

I'

' ~

3.10 Uhen the beeping tone stops, speak your message to the called party.

You have about 20 seconds to talk.

Your allotted tine has expired when you hear the " busy" tone returned to the telephone.

Hang up t.he phone.

ee e

I 5%['

a.P-,

=a....

.a.

-+e a

EP-EOF-4 Jllfl181982 Page 10 of 15 i

FORM E0F-4.1-19 4.1.1 initial Actions and flotifications b.

Notification of. Corporate Emergency Personnel PUBLIC IflFORMATIO!1 DIRECTOR Office #

Home #

Initials 1

Designate Contacted TIME EttVIRf;0!'.EitTAL PROTECT 10!i DIRECTOR Designate Contacted TIME admit!/ LOGISTICS DIRECTOR Designate Contacted TIME,

l NUCLEAR ADMllllSTRATIVE SUPERVISOR I

Time Contacted I

e.

NAWAS contact :

Agency Time initials Warning Center 1-East Central Area Kewaunee County

,s.5g Manitowoc County v3,

~

i

't e+r--

..EP-EOF-4 JUN 18 i'Jd4 Page 11 of 15 FORME 0F-4.1'(cont'd)

a tE55 f.

Notification of United States Coast G0ard: Day Night Contact Time Initials J.

Notification of INP0:

Contact Time Initials' k.

Notification of Aftt:

Contact Time Initials 4.1. 2 Notification of Emergency Class De-escalation a.

Public Information Director Time Initials Enviraruntal Protection Director Tina I n i '. i e l ~

~~

Admin / Logistics Director Time Initials

^-

l Nuclear Administrative Supervisor Time Initials b.

If1P0 Contact Time Initials (gD:n w

c.

ANI Contact Time Initials d.

NAWAS

Contact:

Agency Time.

Initials Warning Center'1 East Central Area Kewaunce County Manitowoc County Notification of United States Coast Guard:

e.

Day Night Contact Time Initials

(..,. 3

.ab.

4

EP-EOF-4 JUN 181902 Page 12 of 15 FORM E0F-4.1 (cont'd)

.ify 9-4.1.3 Notification of Emergency Closecut a.

Public l'nformation Director Time Initials Environmental Protection Director Time Initials Admin / Logistics Director Time Initials

.l Nuclear Administrative Supervisor Time In,i tial s

.b.

INP0 Time Initials Contact c.

ANI-Time Initials Contact d.

NAWAS Contact :

Agency Time initials Warning Center 1 East. Central Area y

Kewaunce County 9) 9 Manitowoc County

, e.

Notification of United States Coast Guard:

Day Night i

Contact Time Initials f

i j

I

.f*

i

=

EP-E0F-4

~

JUN 181982 Page 13 of 15 FORM E0F 4.2 m.

CHECKLIST FOR STATUS UPDATES TO SUPPORT AGENCIES jfg

?;jP, s

~

A.

Identi fication:

Date Time Name of Person Making Report Licensee Facility Af fected B.

==

Description:==

Date of Event Time

]

Description of What llappened C.

Consequences of Event:

(Complete depending on type of event)

Inj uri es Fa t a l i t i es _ _ _,_, _, _

Contamination (personnel)

(property) 4 l

Overexposures (known/possible) l Safety Hazard (describe - actual / potential)

Of f, site Radiation Levels Meteorology (wind speed)

From (direction) f Weather Conditions (rain, clear, overcast, temperature) s D.

Cause of Event:

i i

i E.

Recomunded Protective Actions:

Classification of Emergency Press Release Planned (Yes/No) t 6

  • *:<* 4 l

4

.e e

EP-E0F-4 JUN 181982 Page 14 of 15

~

Form E0F-4.2 (coht'd)

+

Wisconsin Emergency Operations Center (E0C)

Contact Ilme Initial l

l State Patrol ' Fond du Lac, or East Central Area E0C (if activated)

Contact l

_j i

l

___l lime I

i i

Initial l

Kewaunce County Sheriff, or

/

Keaaunce County E00 (if activated)

Contact l

l l

_ lime j$

1nitial Mariitowoc County Sherif f, or

'Manitowoc County E0C (if activated)

Contact lime Initial i

l l

l U.S.Coastduard-Day lii ght Contact i

Initial l

e i

+

~

e e.

EP-EOF-4 JUli 181982 Page 15 of 15 Form EOF-4.3

^ rh

~

4.5.2 Contacting a Recorder:

flame Office g liome #

Contact

Time Initials 4.5.3 Obtaining Mainistrative Support Ti:,e Initials
one llore 4 6

D:

~

m

  • e d1%b

WISC0!! Sill PUBLIC SERVICE CORPORATION N0.

EP-E0F-5 REV. E Kewaunce Nuclear Power Plant TITLE:

Corporate Response to a Site Emergency

[EMERGEi!CYPLAftIMPLEMENTINGPROCEDURE DATE: JUN 1 g 1982 PAGE 1 of 14

~

ys b

REVIEWED BY htad7/m d) d

d. /

APPROVED BY d as/M h ec

/

1.0 APPLICABILITY 1.1 This procedure is to be implemented upon the declaration of a Site Emergency or at the request of the Emergency Response Manager.

2.0 PRECAUTIONS 2.1 If an emergency class escalation occurs during the notification, immediately implenent the notification procedure for the ne.-s emerryn y classi f ica tion.

2.2 All pages should be sent on hoth transmitters to ensure maximua are' coverage - Kewaunce transmitter (plant ext

, Green Bay transmitter (plant ext 315 or Green Day ext ~

J.

2.3 All Green Bay pager transmissions must have the pager number preceded by Kig a (1).

~d

. ear

3.0 REFERENCES

3.1 LP-E0F-1, Corporate Emergency Response Orga6ization 3.2 EP-AD-17, Communications 3.3 EP-EOF-2, Emergency Operations Facility' Activation 3.4 EP-E0F-9, Interface 'with Support Organizations 3.5 EP-ENV-3A, Environnental Protection Director Actions and Directives 3.6 EP-ENV-38, Environmental Monitoring Team Actions 3.7 EP-AD-15, Recovery Planning 3.8 Nuclear Emergency Public Infonnation Plan i

4.'0 INSTRUCT 10::S i

l 4.1 Emeroency Response Manatier (ERM) Actions NOTE:

Notifications may be perfornied by a connunicator desi yut ed by the ERM.

.g.)

l I

,.WISC0!!Siti PUBLIC SERVICE CORPORATIO!!

N0.

EP-E0F-5 Kewaunce fluclear Power Plant TITLE:

Corporate Response to a Site. Emergency El4ERGEtlCY PLAll liiPLE!4EllTiti

G. PROCEDURE

DATE:

PAGE 2 of 14

.f'}

g yg.

.4.1.1 Initial Actions and Notifica.tions a.

Upon notification and verification of a Site Emergency condition, contact the Emergency Director.

It0TE:

If notified by pager, confirm contact with a telephone call to No' ify a designate for each of the corporate emergency b.

t positions and brief designates on plant status, per Form EOF-5.1.

Phone contact should be used if time pe nni t s.

It0TE:

If unable to contact one person fro.a each group by usi ng home or of fice telephou numbers, <i.-tiv.it o the pager sjsta.1 per attocnea Table

'...n

,.1 e:

call System Operating at and provide your name and title and the na.nes and titles of the individuals you wish to pay.'.

Also provide a brief (20 seconds) message to be broadcast over the pagers.

Systeci Operating F.=rsou 21 will attempt to contact these individuals via the MM paging systen.

. :/

c.

Activate th'e E0F by:

1.

proceeding to the SAF and ' activating the EOF in accordance with EP-EOF-2 and, 2.

as necessary, contact additional personnel ~ to stat f the EOF with phone numbers li'sted in procedure EP-E01 -l.

Taa1e EOF-1.2.

3.

folla. ting ca cletie : of 'li'-E X -2 c.ntion v -

wi th. Step 4.1.4.d.

d.

If TSC has not already made the initial Site Emergency notifications, notify the State and local ga.vrnoent s using the NAMAS phone and document the contact on Form EOF-5.1.

The following statement should. be given:

I I

^

'rca, Kewaunee ?,uclear calling Wisconsin Warning Center 1, East Central i

Kewaunee County, and Manitowoc Counts.

I' lease acknowledor.

%5 Wait until'all toar areas have acknowledged, then cont 1000 I' an)

~~-

area fails to acknowledge, ask '4rning Center 1 to ring that area.

I

  • WISC0flS!!1 PUBLIC' SERVICE CORPORAT10ft NO.

EP-EOF-5 Kewaunee fiuclear Power Plant TITLE:

Corporate Response to a

. Site Emergency

^

EMERGEllCY PLAfl IMPLE!4EtiTIflG PROCEDURE

'DATE: JUN 181982 PAGE 3 of 14 All areas please take the following message:

This is (title) at the Kewaunee fluclear Plant.

An incident has occurred at our facility and we are declaring a Site Emergency at (time) on (date).

There (has/has not) been a radiological release.

flear-site con-sequences are expected.

The State Radi6 logical Response Team and l

key response personnel should be notified.

Activate Emergency l

Emergency Operations Centers.

l We will keep you infonned ' f the situation.

o c.

Any confiraing. calls or return contacts should be thrungh com e cial j 2

telephone.

l To repeat:

Kewaunee iluclear' Plant is declaring a Site Emergency

(

(time) on (date).

Please relay this infon:iation to Energency l

Govern.aent in.r.ediately.

i i

-]

Please acknowledge receipt of message.

l-e e.

If the TSC has not already made the initial Site Daerger cy notification, notify the United State.s Coast Guard using commercial telephone lines with the text of the previous message and document the contact on 'Fona EOF-5.1.

f.

Evaluate offsite radiological conditions with the EPD, RPO, and ED, and reco. wand protective actions, i f warr.mted, to State and local authorities per EP-GiV-3F, Proteu:.ive

, Action Recommendations..

9 Provide. status updates to support agencies at ciutually agreed upon intervals..

h.

Not i fy the ins ti tutue of Nuclear PS.cr 0,iera t im:s ( '.".)'

and inforin them of the Site Emergency condition, per foru E0f-5.1 i.

Notify American Nuclear Insurers ( ANI) a? ! inforn t hei of the Site Emergency condition per form L01-5.1.

j. As necessary, pertona any additional sop;> ort orgarii.ation not i f ic.i' iens p'r f r-! 1r.a. :nter: ace ui:- %,i, e > :a o : q ;,

k.

Provide information via the correrate mana:.'ient t0 the (1.,,,.,

Public Inton: tat.lon Utreetor, m

e D

WISCONSIrlPUBLICSERVICECORPORA[10N NO.

EP-E0F-5 4

Kewaunee.lluclear Power Plant TITLE: ' Corporate Response to a Si te' Emergency E14ERGEllCY PLAll !!4PLEI4ENTitlG PROCEDURE PAGE' 4 of 14 hsh

(~.:2 DATE:

d,0N181982 1.

If requested, dispatch representative to the County Emergency Operations Center.

m.

Brief the EOF staff periodically on the status of the emergency and pertinent plant conditions.

4.1. 2 Site Emergency De-escalation to an Alert or Unusual Event a.

Notify the corporate emergency directors of the emergency class change, per-Form E0F-5.1.

b.

Notify the Institute of !!uclear Power Operations (INP0) of the emergency class change per Form EOF-5.1.

c.

!!otify American iluclear Insurers (ANI) of the emerge.ncy class chan.;e par Forn EOF-5.1.

~

d.

If the EOF is activated, notify the support agencies using the llN.fAS phone 'of the emergency class change per Form EOF-5.1, and document the contact on Fonn EUF 5.1.

The following statement should be given:

-( - > - ?

Kewaun65~kuclear cailing Wisconsin Warning Center I, tast Centraf drea 4

Kewaunee County, and Manitowoc County.

Please acknowledge.

~

!!ait until all four areas have acknowledged, then continue.

If any area fails to acknowlege,. ask.1!arning Center 1 to ring that are

-l This is (title) at the Kewaunee N0 clear Power Plant. Conditions have improved and we have de-escalated the Site Emereency to an Alert / Unusual Event at (time) on (date).

To repeat:

Ine Site Emergency has been de-escalated te an Alert / Unusual Event at (time) on (date).

Relay this information to Emergency Government immediately.

Please' acknowledge receipt of this message.

Notify the United States Coast Guard using coixiercial

~

e.

telephone lines with toe text of the previans wssay and docune.nt the contact on Form EOF-5.1.

O

. pp.= 9 f

e 4

e

WISC0llSIfl PUBLIC SERVICE.CORPORATI0tl N0.

EP-EOF-5 Kewaunce Nuclear Power Plant TITLEi Corporate Response to a

' Site Emergency

> ~. EMERGEllCY PLAll_IMPLEMEllTIriG PROCEDURE

~

PAGE 5 of 14 d.N.)

DATE: JUN 181982

. r,.

4.1.3 Site Emerqency Close Out a.

Notify the corporate emergency directors of the emergency close out per Form E0F-5.1.

b.

Notify the Institute of Nuclear Power Operations (IrlPO) of the emergency close out per Form E0F-5.1.

c.

Notify A>nerican flu' clear Insurers (AllI) of the emergency close out par Form EOF-5.1.

d.

If the EOF is activated, n'atify the support agen:i.s M.! y the !!AWAS phone of the emergency close out and document the contact on Forn EOF-5.1 The following statement should be given:

Kewaunee Nuclear calling llisconsin llarning Center 1, East Central Area, Kewaunce County, and Mani tor oc County.

. m.g

-[

Please acknowledqe.

.W llait until all.four areas have acknowledged, then continue.

If any area fails to acknowlege, ask Warning Centar 1 to ring tot ar; This is (title) at the Kewaunee Nuclear Power Plant. We have closed out the Site Emergency at (time) on (date).

To repeat: The

  • Site Emergency has been closed out at (tii.ie) on (date).

This verbal close out will be followed with a written su:nmary within l 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, j

Relay this inforaation ta Energency Government intnedia'.ely.

Fler.a i

l acknowledge receipt of this messace.

j e.

Noti fy the United States Coast Guard using commercial telephone lines with the text of the previous.tiessa.ie dnd d0cument the contact on form EOF-5.1.

f.

Perform EOF deactivation in adcordance with Section 4.2 of f r-l'Of-2. faergenO. Oper,a! ions f acili ty Act iv it ia'i

.C6%

y--

>1e

.e

-y m

o

~

-g.

_y

.WISC0!iSIriPUBLICSERVICEC.0RPORATibri 11 0.

EP-EOF-5 Kewaunce fluclear Power Plant TITLC: ' Corporate Response to.a Site Emergency c,MERGEriCY PLAfi IMPLEMEllTI!tG PROCEDURE r

DATE: JUN 181982 PAGE ' 6 of 14

~]j 4.1.4 Final Conditions (one of the following) a.

A General Emergency has been declared and EP-E0F-6, Corporate Response to a General Emergency is being implemented.

b.

The Site Emergency has been reclassified as:

1.

Unusual Event; EP-E0F-3, is being implemented.

2.

Alert; EP-E0F-4, is being implemented.

c.

The Site Emern?ncy has been closed out and no r.: cove y operations are required.

d.

The recovery phase criteria have baen stieL,ind t;ie c.e.:rger. /

organization is shif ting to a recovery mode, by implementing EP-AD-15, Recovery Planning.

4.2 Public Information Director (PID) Actions '

4.2.1 Upon notification frc'n the ERM, perforn normal press release (t,)

actions in support of the Site Emergency condi'. ion.

.~ /

4.2.2 Activate the Joint Public Infonaation Center per rderence 3...

4.3 Environmental Protection Director (EPD) Actions 4.3.1 Perfora actions in accordance with. EP-EilV-3A, Envirannental Protection Director Actions and Directives.

4.4 Environmental Monitoring Team (EMT) Actions

4..:.1 Perfr actio"; in !ccardaic: zi t h E:'-ZMV-Ti, 9crn e :e

'l Monitoring Team Actions.

4.5 Admin / Logistics Director (ALD) Actions l

l 4.5.1 If notified by pager, confirm contact with a telephone call to the SAF at i

4.5.2 If informed of E0f activiation by the ERM contact a recorded per for.;i LOF-S.3 and proceed to the COI via the SAF.

4.5.3 Obtain necessary ad.:iinistrative support from the li;t on Form f 0F-5. 3 a nd i n forn.the i of where !.h.'y shaald eport.

p.dQ 4.5.4 Perfony t he act ions necessary to obtain additional,nanpower.

('

supplies and equipuent as requested by.the.LRM in accordance with EP-L0f-9. I' terf ace with: Support Organizations.

n

EP-EOF-5 gh/hl4 1

4 m

-s TABLE E0F-5.1 l

PAGING SYSTEM OPERATI0fl i

A.1 Tone and Voice Radio Pagers are assigned to personnel as shown with call numbers on the Emergency Call List.

A.2 Ilhenever it is necessary to contact a person on the Emergency Call List and he'is not on site, the home telephone aunber shoul.d be called first. -

7 If he cannot by reached at home, contact should then be attempted by using the person's individual call nunber.

A group of individual's may be cont. acted by using the group call njuber.

Tone and voice contact by pa, prs is ef fective within a 15 mile radius of the transmitting station.

Only i

toqe co-P.W,s en be mde out3id2 th? 15 mile erlins.

A.3 llow to Place a Page 3.1 Determine the two digit pagar code for the par.ty or tjroup you t,isti to i

contact from the pager assignment list.

PLANT EXTEUSION P110MES 3.2 Dial the terminal access code on any plant extension.

Kewaunee site transmitter -

Green Bay transmittei' -

i a.

Ilhen the terminal answars and responds with a bec.7, go to step 3.'3

~

{

b.

If you, hear a " busy" signal,. hang up and try again.

3.3 Dial the two digit pager code for the party or. group you wish to contact froa the pager assignment list.

i NOTE:

This nuciber.:iast be preceded by a "1" when using the Green IUy 1

transmitter, i

~

3.4 Listen for the acknowledge (beeping) tone, indicating page being transmitted.

j 3.5 When the beeping tone stops, speak your ytessage to the called party.

~

.)ou have about 20 seconds to tall.

Your alIotted time has e\\pired when yau hear the "nusy" tone retur.ned to the telephone.. 11.0 1 : '8;'

u phone.

eg0a kl -

,+r

EP-EOF-5 JUN 181992

.)

Page 8 of 14 TABLE EOF-5.1 (cont'd)

CREEll BAY EXTEl;SIO!1 pit 0!;ES 3.6 Dial:

a.

For Kewaunee site transmitter -

b.

For Green Bay transmitter -

3.7 1 'ien 't :

t ~ r:.:i n 11 a ns !e rs a:: j resi o id s i' S

!' c?,

')

a.

If you hear a " busy" signal, hang up 'and try again.

3.8 Dial the tao digit pager code for the piirty or grnup you wisa to cont.act from the pager assignment list.

J

'n I;0TE:

This number raust be preceded by a "1" when using the Green Bay fy transmitter.

v 3.9 Listen for the acknowledge (beeping) tone, indicating page being transmitted.

3.10 When the beeping tone stops, speak your message to the called party.

You have about 20 seconds to talk.

Your allotted tiue has expired when you hear the " busy" tone returned to the telephone.

Hang up the phone.

a, wwa.m

,,,,eo,.

.e-e n am, me*

W9

=

e

-ens.

uniemump e.

- use 3-k t**s r

s

.,,..,p,,

..e s

EP-EOF-5 JU! 1 s ng>4 Page 9 of 1

-k FORM E0F-5.1

.4

. g, 4.1.1 Initial Actions and flotifications

~

b.

Notification of Corporate Emergency Personnel g

s PORLIC IttFORMATIO!! DIRECTOR Office #

Home #

Initials

~

.s Designate Contacte)1' TIME El;Vig:0",El:TAL PROTECTIO:i DIRECTOR A

L Designate Contacted

_ TIME s

??%,

admit / LOGISTICS DIRECTOR s

.,p

~

Designate Contacted TIME l

NUCLEAPs ADf11tilSTRAT VE SUPERVISOR ~

s 1 s s.

Time Contacted s

a d.

NAWAS contact:

Agency Time Initials W<rning Center 1 East Central Area Kewaunee Cotinty Manitowoc County

7.,.y

\\

\\m s

1

EP-C0F-5 JUN 181902 Page 10 of 14 FOR!i E0F-5.1 (cont'd)

~

~

~

sY3 Notification of United States Coast Guard: Day I

j -

e.

Night Time Initials Contact h.' Notification of IllP0:

Time Initials Contact

~

Notification of Aill:

1.

Time Initials Contact 4.1. 2 t;otification of Emergency Class Oc-escalation-Time Initials Public Information Director

~

Initials

~~

a.

Time Environmentei Protection Director I ri t i c i :, ~~~~ ~~

Tir:e Atiin/Lc31stics tirect:r

- ~~~~

l Nuclear Administrative Supervisor Time ~~~~~ ~ Initials b.

IliP0 Time Initials i

Contact

,3 i

c.

Afl1 M.y-)

Time Initials Contact Initials d.

IIAUAS

Contact:

Agency Time Warning Center 1 East Central Area Kewaunce County i

lianitowoc County Notification of United States Coast Guard:

e.

Day

.L i

Night Time Initials Contact I

4 e Y.,,

6 i

EP-E0F-5 JUfl 161932 Page 11 of 14 FORM E0F-5.1 (cont'd)-

+

4.1.3. Notification of Emerqency Closcout a.

Public Information Director Time Initials

~

Environmental Protection Director

' Time Initials Admin / Logistics Director Time Initials l

Nuclear Administrative Supervisor Time Initials b.

IllP0 Contact Tiine Initials c.

ANI Tiine Initials Contact d.

NAWAS

Contact:

Agency Time Initials Warning Center 1 a

East Central Area

5 Kewaunce County Manitowoc County Notification of United. States Coast Guard:

Day -

c.

Night -

Time' Initials Contact 4

e o

O f

  • Q'

\\

~

4 m

""W

  • +-u'--m,-g.__,

.m EP-E0F-5 t

~

JUN 181982 Page 12 of 14 7

.~

FOR!i E0F-5.2

.z*ig l

M,'

CilECKLIST FOR STATUS UPDATES TO SUPPORT AGEr!CIES 1

A.

Identification:

),

Date Time Name of Person fiaking Report l

Licensee Facility Af fected B.

==

Description:==

7 Date of Event Time i

Description of What !!appened C.

Consequences of Event:

(Complete depending on type of event) 4 Injuries Fa t a l i t i es,_,_

i j

4 Contamination (personnel)

(propeity)

Overexposures (knoun/possible)

Safety }lazard (describe - actual / potential) j

)

Of f-site Radiation Levels lieteorology (wind' speed) from;(direction) 1 Weather Conditions (rain, clear, overcast, temperature)

D.

Cause of Event:

E.

Recommended Protective Actions:

,i.

Classification of Ener[ency

~

Press Release Planned (Yes/tio)

O 1

h hetj N

i i

EP-EOF-5 JUli 181982 Page 13 of 14

~

I FORM EOF-5.2 (cont'd)

~

Nisconsir) Emergency 0perations Center (E0C) l 9

Contact i I

\\

line

)

Initidl l.

l j

1

\\

State Patrol fond du Lac, or East Central Area EOC (if activated) l l

_L

_C_ontact I I

-____ L _= =-- - ______ L _..-

li +

Tro tial l l

j i

i Kewaunee County Sheriff, or Kewaunec Couaty E00 (if activated) 1 Contact _]

l Tine 1,_

initial l j

i Manitowoc County Sheriff, or Manitowoc County E0C (if activated)

I I

Contact '

I

_ _ = -

li 10 L __

U.S. Coast Guard Day Night Contact !

l I

l lir10 Initial l

j j

l

  • s

.EP-EOF-5 JUI! 181982 Page 14 of 14 FORii E0F-5.3-f..,

. ( :.7'-

4.6.2 Contactinq a. Recorder:

flame Office #

llome #

Contact Time.

Initials 4.5.3 Obtaininq Mministrative Support Tine Initials fiame Jhm #

l

,33 1

l d

=_ _-

1<

~

' WISC0liS!!! PUBLIC $[RVICE -CORPORATI0tt NO.

EP-EOF-6 R E V.

E__

Kewaunce Nuclear Power Plant TITLE : Corporate Response to a General Emergency

{6 EMERGEliCY PLAll IMPLE!4ENT! fig. PROCEDURE l

h DATE: d@l 1 g 'jg;;

PAGE' 1 of 14 REVIEWED BY >x/Amd3 /

A.

d APPROVED BY __ [ /[ f jgq d f

"' & /

e l

J 4

1.0 APPLICABILITY 1.1 Th-is procedure is to be implemented upon the declaration of a General Emergency or at the request of the Emergency Response Manager, l

l 2.0 PRECAUT10"S i

2.1 All [itgy. should Se ser.t on both trarunitter; to on : P' v:i,ri r

coveraga - Ke:iounee transpitter (plant ext

), Green (i.j t ra n:.i. i i....

J (plant ext 315 or Green Bay ext 1

2.2 All Green Bay pager transmissions must have the pager ny.aber preced;i by i

a (1).

4 3.0 REFEREl!CES

4 l

3.4 EP-E0F-9, Interface with Support Organizations 3.5 EP-ENV-3A, Environlaental Protection Director A:t ions and.Jired i.es 3.6 EP-EtiV-3B, Environmental 11anitoring Teau Actions

~

3.7 EP-AD-15, Recovery Planning l

l 3.8 Nuclear Emergency Public Information Plan 4.0 INSTRUCTIONS t

4.1 Emergency Response Manaaer (ERM). Actions l

NOTE: Notifications may be performed by.a communicator designated l

by the ERM.

j

?!*

l I

l

. ', _ WISC0ftSIfl PUllLIC SERVICE CORPORATIOft fl0.

EP-EOF-6 r.ewaunce fluclear Power Plant TITLE:' Corporate Response to a General Emergency b.

EMERGEliCY PLAll IMPLEMEftTlfiG PROCEDURE DATE: dl)ll 181982 PAGE 2 of 14 4.1.1 Initial Actions and tiotifications a.

Upon notification and verification of a General Emergency condition, contact the Emergency Director.

110TE:

If notified by pager, confirm contact with a telephone call to b.

flotify a designate-for each of the corporate emergency positions and brief designates on plant status per Fonn EOF-6.1.

Phone contact should be used i f Limo pe nni t s.

fiOTE :

If unable to contact one person foi e i:'t u r.r m

e home or of fice telephone numbers, activate tiie p. jet sys te:n per attached Table I;0F-6.1 or call Systeu Oper.:'.-

ing at and pro /ide your om and t.itle and the names and titles of the indivi h.als you wish to page.

Also provide a brief (20 secnnds) message to be broadcast over the pagers.

Sys tea Oper, : -

ing personnel will attempt to contact these individuals y '. g via the paging system.

y t

/

c.

Activate the EOF by:

l.

proceeding to the SAF and activating the EOF in accordance wi th EP-EOF-2 and, 2.

as necessary, contact addi.tional personnel to staf f tne EOF with phone numbers listed in procedure Ep-Euf-1, Tab ie _EUF-l.2.

3.

folloui ig co'pleti.r; of t '-Evr -J sn. i with Step 4.1.1.d.

d.

If TSC has not already made the initial General Emergency l

notifications, notify the State and local iforor: con: s using the NAWAS phone and document the contact on form EOF-6.1.

The following stateuent should. be given:

I I

Kewaunce Nuclear calling Wisconsin Warning Chnter 1, East Cent ral \\rea,l Kewaunee County. and Manitowoc County.

Please actnowled :o.

I i

(.- A Wa i t unt il. al l tour areas have acknowledged, then cont inue, it any area fails to acknowledge, ask War.ning Center 1 to ring that area.

WISC0tiSIll PUBLIC SERVICE CORPORAT10ft-N0; EP& EOF-6 Kewaunee fluclear Power Plant TITLE: Corporate Response to a General Emergency 4.tE!4ERGEllCY PLAll !!4PLEf4EllT.It:G PROCEDURE AU.h DATE; gjN 1 8 1982 PAGE 3 of 14 All areas please take the following message:

This is (title) at the Kewaunee fluclear Plant.

An incident has occurred at our facility and we are declaring a General Emergency at (time) on (date).

There (has/has not) been a radio' logical release.

flear-site con-sequences are expected.

The State Radiological Response Team and key response personnel should be noti fied.

Activate Eni r.;ency Operations Centers.

'..L: uill keep you inforued of tiie si tua tion.

l' Any confirming calls or return contacts should be through commercial !,

telephone.

To rep' eat: Kewaunee !!cclear Plant is declaring a General Fmerenncy (time) on (date).

Please. relay this infonnation to Euergency

y. ;.3 Government immediately, i.

Please acknowledae receipt of nessace.

e.

'If the TSC has not already made the i.nitial General Emergency notification, notify the United States Coast Guard using commercial telephone lines with the text of the previous message and document the contact on Fonn EOF-6.1.

f.

Evaluate offsite radiologidal condi;ians 'eith tac M, and ED and recommend protective actions, if warranted, to

. State aFf loc al v:t i ari t i es. Te:

P-ET.' 3F. P ' < r 1z' Action Recommendations.

g.

Provide status updates to support agencies (using Tonn E0F.6.2) at mutually agreed upon intervals.

h.

Notify the Institutue of Nuclear Power Operat ions il4PO) and irlfora thea of the General Ene'r3;ency conm '. io.'.. r Fonn EOF-6.1.

i.

Notify American Nuclear Insurers ( ANI) and intonn t her:i of the General Energency condit ion per Ton:i 10F-6. l..

,i.

As' nec es sa ry, pe rt on:t a n.i addi t ional. s uppo rt org.in t..i' li".

not i f icat ions per LP-lot -9, Interf ace with Support

(,,

Organi/ations.

O e

a

WISC0!1 Sill PUBLIC SERVICE CORPORATIO!!

il0.

EP-EOF-6 Kewaunce fluclear Power Plant TITLE : Corporate Response to a General Emeroency EMERGEfiCY PLAtl IMPLEMErlTIf;G PROCEDURE DATE: JU 181982 PAGE 4 of 14 I

hi N

k.

Provide information via th.e corporate management to the Public Infonnation Director.

1.

If requested, dispatch representative to the County Emergency Operations Center.

~

m.

Brief the E0F staff periodically on.the status of the emergency and pertinent plant conditions.

4.1.2 General Emerqency De-escalation.' to a (Site Emergency / Alert /

Unusual Event).

a.

f otify the corporate energ.!ncy directors of the e..i.:rgencj class change per Form EOF-6.1.

b.

f;otify Institute of fluclear Powar Operations (II:PU) of the emergency class change per Forn E0F-6.1.

c.

Ilotify American fiuclear Insurers (Afil) of the e.nargency class change per Form EOF-6.1.

d.

If the EOF is activated notify the support agencies, using

$' 7h, the I;N.!AS phone, of the energency class change and document the contact on Fona EOF-6.1.

The following statement should be,'given:

1 Kewaunee Nuclear calling Wisconsin 1:!arning Center 1, East Central Area,i Kewaunce County, and Manitowoc County.

Please acknowledge.

l Nait until all four ares have ad.coaledged, then co *.in r.

'It any area fails to aci.no.iladge, as *.Urning Cenwr i t a ring that area.

1 This is (title) at the Kewaunee N. clear Powei Plant. Conditions.

have improved and we have de-escalated t he General Emeroency to 3 (Site Energenry/ Alert /ttnusual Event) at (tine) on 'ita:.e). '

To repeat: The General Emergency has been.ie-escalated to a

~

(Site Emercency/ Alert / Unusual Lvent) at (time) on (dat.e).

Relay I

this internation to Lnergency Government immediately.

Please acknowledge receipt of this message.

, V, ~ t e'

s

/

9 6

m

WISC0flSiti PUBLIC SERVICE 'CORPORATIO!!

NO.

EP-EOF-6

't Kewaunee fluclear Power Plant TITLE: Corporate Response to a Gener'al Emergency o.EMERGEllCY PLAfi IMPLEMENTING' PROCEDURE

~

DATE: JUtl 181982 PAGE 5 of 14 3

- -.. ~

~.

e.

Notify the United States Coast Guard, using commercial telephone lines with the text of the previous message and document the contact on Form E0F-6.1.

4.1.3 General Emergency Close Out a.

Notify the corpora'te emergency direcitors of the emergency close out per Form'E0F-6.1.

b.

flotify the Instit.ute of Nuciear Power Operatior.s (IRPO) of the emergency close out per Fora EOF-6.1.

c.

Notify American Nuclear Insurers (Alli) of the emergency cine out per Form COF-6.1.

d.

If the EOF is activated, notify the support agencies, using the !!AUAS phone, 'of the emergency close out 'and docwent tb contact on Fonn EOF-6.1.

The following statement should be given:

J d

I b'

Kewaunee Nuclear calling Uisconsin !!arning Center I, East Central Area,!-

Kewaunee County, and Manitowoc County.

Please acknowledge.

l i

l Wait until all four areas flave acknowledged, then continue, if any area fails to acknuwledge, ask Warning Center I to i

ring that area.

This is (title) at the. Kealunn l!aclear Po.mr Pbn'.

Uc 'u u i

closed out tne General Emergency at (time) on (date).

l To repeat:

The General Emergency has been. closed out at (time)

'~

on (date).

I This verbal close out will be followed with a. written sumiitary within j 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

j I

Relay this infornation to Emergency Government imm,ed i a.t el y.

l Please acknowledge receipt of this message.

l l

e.

Noti f y the Uni ted States Coast Gaa rd, us ing cei:inerci.il

~

telephone lines, with the text of the previous nessage and docunent the contact on Iorm Ltif-0.1

'j.a 3

Q a

e l

~

e

.--.r

-g

WISCON5ffl PUBLIC SERVICE CORPORATION

ft0, EP-EOF-6 TITLE:

Corporate Response to a Kewaunce Nuclear Power Plant General Emergency

'k$ MERGE!!CYPLANIMPLEMENTINGPROCEDURE-DATE: j{Jy 1 g j982 PAGE 6 of 14

( j'W Perform E0F deactivation ~ in accordance with Section 4.2 of f.

EP-EOF-2, Emergency Operations Facility Activation.

~

4.1. 4 Final Conditions (one of the following) a.

The General Emergency has been reclassified as:

1.

Unusual Event; EP-E0F-3, is being implemented.

2.

Alert; EP-EOFi4, is being implemented.

3.

Site Emergency; EP-EOF-5, is being implemented.

b.

The General Enercency has been closed out and no recovery opih to.6 are re.;i. red.

The recovery pl ase criteria have been met and the e'nergency c.

organization is shifting to a recovery mode, by inglenentro; EP-AD-15, Recovery Planning.

4.2 Public Information Director (P10) Actions 4.2.1 Upon notification from the ERM, perfona normal press release actions in supp' ort of the General Eneraancy condition.

4'.2.2 Activate the Joint Public Information Center per reference 3.3.

4.3 Environmental Protection Director (EPD) Actions

~-

4.3.1 Perform actions in accordaiice with EP-ENV-3A, Environmental s

ProtectiBn Directors Action and Directives.

4.4 Environment.il Monito-ing Tean,(EtiT) Artions 4.4.]

Perform actiois in accordance with EP-ENV-38.

4.5 Admin /Loqistics Director (ALO) Actions

4. 5.1 If notified by pager, confirm contact with a telephone call to the SAF at 4.5.2 If informed of EOF activation by the tut. contact.i "ecorder per Fonn E0f-6.3 and proceed to the EOF via the SAF.

4.5.3 Obtain necessary administrative. support from the list on form Lui -o.3 and inf orm thed or where they' hhould re,'.o Perform the actions siccessary.to obtain additional aa ~ .

4.5.4 supplies and equipment as reque'sted by the ERM in accordance with EP-LOf 9

~

EP-EOF-6 JUN 181982 Page 7 of 14 4,

DD-TABLE E0F-6.1 PAGiftG SYSTE!4 OPERATI0ft A. l' Tone and Voice Radio Pagers are assigned to personnel as shown with call numbers on the Emergency Call List.

A.2 Whenever it is necessary to contact a person on the Emergency Call List and he is not on site, the home telephone number sho'uld be called first.

If he cannot be reached at home, contact should then be attempted by using the person's individual call num!>ar.

A group of individuals may be contacted by using the group call. number.

Tone and voice contact by pagers is of fcctive within a 15 mile radius of the' transmitting station.

Only tone contacts can be made outsidd the 15 mile' radius.

A.3 Itou to Place a Page 3.1 Deterai ne the t.o digi t pagr %!e for Uu p: ';

i contact from'the pager assignment list.

PLANT EXTENSI0'i PHOMES 3.2 Dial the terminal access code on any plant extension.

lg Kewaunee site transmitter -

m; Green Bay transmitter -

a.

When the terminal answers and responds with ( beep, go to step 3.3.

b.

If you hear a " busy" signal, hang up and try 'a.Jain.

3.3 Dial the two digit pager code for the' party or greap yo:. wi:,h t a contact froa tSe pager assignnent list.

NdTE:.This number must be precedet by a

0 " sin: t hi' ' h' ' " " "

traniii.Ler.

3.4 Listen for tne acknowledge (beeping) tone, indic.iting P. ige ticing transmitted.

3.5 tihen the beeping tone' stops, speak your message ta the called p :'O.

Yea ha;0 aba.:,.5sece".M ta :alL.

hmr al !..

%,' i when you hear the " busy" tone returned to the tele,1hene.

H t o.: u p ' "e phone.

D N

o b

E0r-6 fl 181982 Page 3 of 14 TABLE E0F-6.1 (cont'd).

GREEft BAY EXTEllSI0il PHONES 3.6 Dial:

a.

For Kewaunce site transmitter -

b.

For Green Bay transmitter <-

3.7 When the terminal answers and responds with a beep, go to step 3.3.

a.

If you hear a " busy" signal, hang up an:1 try cgdin.

3. ;, Di al '-

+ :: :'i,..,c u r c r' f ;r L ; 2,a r tj ^

. e r.

contact fro.r. the pager assignment list.

4 ft0TE:

This nunber must be prece: fad by a "1" when ~using tin Green B y' tra nsmi tter.

3.9 Listen for the acknowledge (becping) tone, indicating page bei;ig transmitted.

. ?

3.10 Uhen the beeping tone stops, speak your message to the called party.

You ha've about 20 seconds to talk.

Your allotted tine has expired when you hear the " busy" tone returned to the telephone.

Hang up the phone.

l l

1

'Nd l

\\,

EP-EOF-G JUll 181982 Page 9 of 14 FORM EOF-6.1

,g R9 4.1.1 Initial Actions and flotifications b.

Notification of Corporate Emergency Personnel PUBLIC INFORMATIO!! DIRECTOR Office #

Home #..

Initials Et: VIRI 0;iFi:T/,L PROTECT!0t! DIPECT0!!

  • Designate Contacted

_ _ TIME _ ______

fi)y.h admit!/ LOGISTICS DIRECTOR

(

TIME Designate Contacted l

NUCLEAR ADMII415TRATIVE ' SUPERVISOR Time Contacted d.

NAWAS contact:

Agency Time Initials Warning Center i East Central Area Kewaunee County Manitowoc County m-P 4

88 e G e

+

EP-EOF-6 Ic f0 i' 14 p

FORM EOF-6.1 (cont'd)

..s Notification of United States Coast Guard:

Day d?)

e.

Night

'G' Contact Time Initials h.

Notification of If(P0:

Contact Time-Initials 1.

f(otification of Aftt:

Contact Time Initials

4. '. 2 Notification of Emergency Class De-escalation a.

Public Information Director Time Initials _ _,_

Environnental Protection Director Time Initials Admin / Logistics Director Time Initials l

Nucicar Adninistrative Supervisor Time initials b.

If;PO b

Contact Time Initials

/

c.

ANI

  • Contact Time Initials d.

NAWAS

Contact:

Agency Time Initials Narning Center I East Central Area l

Kewaunee County Manitowoc County e.

Notification of United States Coast Guard:

Day Night Contact Time Initials e

e

(+.,

v e

a-

EP-EOF-6 JUll 181982 Page 11 of 14 FORli EOF-6.1 '(cont'd).

~

n dNA "9

4.1.3 tiotification of Emergency Closcout a.

Public l'nformation Director Time Initials Environmental Protection Director Time Initials Admin / Logistics Director Time Initials l

Nuclear Administrative Supervisor Time Initials b.

IllP0 Contact Time' Initials c.

All!

Contact Time b;i:; '.

d.

IlAWAS

Contact:

Agency Tine In i t i a l_r, llarning Center I East Central Area 7

k Kewauneo County Manitowoc County c.

Notification of United States Coast Guard:

Day Night Contact Time Initials i

l i

2 e

l l

i o

CD v

\\

l

EP-COF-6 JUll 181982 Page 12 01 14 FORM E0F-6.2 CitECKLIST FOR STATUS UPDATES TO SUPPORT AG'EllCIES

_..n

~..

A..ldentification:

Date Time.

Name of Person Making Report Licensee Facility Affected B.

==

Description:==

Date of Event Time Description of Uhat llappened C.

Conseq m ces of Event:

(Conglete depending on type of event)

Injuries Fatalities Contanination (personnel)

(property)

Overexposures (known/possible)

OS Safety Hazard (describe - actual / potential)

[,7

.o

- Off-site Radiation Levels Meteorology (wind speed) from (direction) _

Weather Conditions (rain, clear, overcast, temperature)

D.

Cause of Event:

i E.

Recom., ended Protective Actions :

}

C1assification.of Emergency Press Release PlanneJ (Yes/flo)'

i

\\,

e l

I

.,.,,,_m,_

, _. =, _.

~

~r

EP-EOF-6 JUti181102 Page 13 of 14 FORM EOF-6.2 (cont'd) g Wisconsin Emergency Operations Center (EOC)

Contact ll lime initial State Patrol Fond du Lac, or East Central Area EOC (if activated)

Contact l

l li" l__

l t:1 t i a l l l

l l

,Kewaunee County Sheriff,'or Keuaunee County EOC (if activated)

Contact l

.i lir,e l

_l Initial j l

l l

(y Manitovoc County Sherif f, or Manitowoc County EOC (if activated)

Contact l l

l lime j

i Initial j l

.-l U.S. Coast Guard Day fli gh t Co: tact line Initial

  • A 'L'

}

EP-E0F-G JUIl 18 198?

Page 14 of 14 FORM EOF-6.3