MONTHYEARML20117L7271996-09-0505 September 1996 Proposed Tech Specs 4.2-2 Re Steam Generator non-repaired Tube Insp & 4.2-3 Re Steam Generator Repaired Tube Insp ML20092K8131995-09-19019 September 1995 Proposed Tech Specs,Providing Revs to Clarify Purposes to Maintain Accuracy of TS & Reflect Revs to 10CFR20, Stds for Protection Against Radiation ML20091P1041992-01-27027 January 1992 Proposed Tech Specs Re Steam Generator Tube Sleeving ML20205H3401987-01-12012 January 1987 Rev 3 to Reactor Test Program,Kewaunee Nuclear Power Plant ML20125B4491985-05-31031 May 1985 Plant,Cycle II Startup Rept,May 1985 ML20108F4791984-08-20020 August 1984 Suppl to Kewaunee Nuclear Power Plant 1984 Integrated Leak Rate Test Rept ML20092K4191984-06-30030 June 1984 Cycle 10 Startup Rept,June 1984 ML20080B9871984-01-12012 January 1984 Emergency Plan Implementing Procedure EP-TSC-7, Reactor Vessel Head Venting Time Calculation ML20080B9721984-01-12012 January 1984 Rev B to Emergency Plan Implementation Procedure EP-RET-3C, Post-Accident Operation of High Radiation Sample Room ML20083F7161983-10-27027 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078L5791983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078F4801983-08-16016 August 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual event,EP-AD-8 Re Notification of Alert & EP-AD-9 Re Notification of Site Emergency ML20077Q0481983-07-26026 July 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-ENV-8 Re Total Population Dose Estimate calculations,EP-RET-5 Re Plume Projection & EP-RET-6 Re Dose Projection ML20077B6001983-07-15015 July 1983 Cycle 9 Startup Rept for June 1983 ML20078G4201983-06-21021 June 1983 Rev D to Procedure EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data) ML20078G4431983-06-21021 June 1983 Rev a to Procedure EP-RET-3D Containment Air Sampling Analysis Using Casp ML20078G4371983-06-21021 June 1983 Rev B to Procedure EP-ENV-3H Protective Action Recommendations ML20078G4331983-06-21021 June 1983 Rev D to Procedure EP-ENV-3G Manual Projection Calculation ML20078G3681983-06-21021 June 1983 Rev H to Procedure EP-ENV-3A Environ Protection Director Actions & Directives ML20078G4061983-06-21021 June 1983 Rev E to Procedure EP-ENV-3E Manual Determination of X/Q (Knpp Meteorological Data) ML20078G3981983-06-21021 June 1983 Procedure EP-ENV-3D Primary Determination of Meteorological Data ML20078G3941983-06-21021 June 1983 Procedure EP-ENV-3C Primary Dose Projection Calculation - Ibm Personal Computer ML20078G3501983-06-21021 June 1983 Rev C to Procedure EP-AD-11 Emergency Radiation Controls ML20077E0041983-06-21021 June 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-11 Re Emergency Radiation Controls & EP-ENV-3A Re Environ Protection Director Actions ML20078G3781983-06-21021 June 1983 Rev E to Procedure EP-ENV-3B EM Team Actions ML20069J5071983-03-10010 March 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Class Determination & EP-AD-11 Re Emergency Radiation Controls ML20069F8351983-03-0101 March 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedure EP-SEC-2, Security Force Response to Emergencies. Revised Table of Contents Encl ML20028D4811983-01-0303 January 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. Revised Index Encl ML20066E2691982-10-13013 October 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-2 Re Emergency Class determination,EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20062E0801982-07-0202 July 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. Revised Index Encl ML20058F6741982-06-18018 June 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room ML20054F3961982-05-21021 May 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use ML20052H8421982-04-16016 April 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20052B1051982-03-19019 March 1982 Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. Revised Index Encl ML20042B2491982-02-18018 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation.Revised Index Encl ML20049H4151982-01-29029 January 1982 Public Version or Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Sam II Operation & EP-EOF-4 Re Corporate Response to Alert.Revised Index Encl ML20040F9781982-01-15015 January 1982 Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency.Revised Table of Contents Encl ML20039H1491981-12-21021 December 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-3 Re Unusual Event & EP-AD-4 Re Notification of Unusual Event ML20038C3821981-10-21021 October 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Classification Determination & EP-AD-3 Re Unusual Event ML1116601091981-08-0707 August 1981 Proposed Amend 46 to Tech Specs 3.4,3.10,Table 3.1-2,Figures 3.1-1,3.1-2,3.10-7 & Pages 3.1-2,3.1.2a,3.1.2b,3.1-2,3.1-3, 3.1-6,3.1-7,4.2-2a,4.2-8 & 6-2 for Pressure Safety Isolation Valves & Normal Operation Heatup/Cooldown Limits ML20038A5641981-07-0101 July 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation ML20038A5761981-06-0303 June 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure ML20038A5631981-03-31031 March 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Acd 12.1 Re Emergency Organizational Structure,Acd 12.3 Re Unusual Event Notification & Acd 12.4 Re Alert ML20038A5661981-02-27027 February 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation & Public Info Plan ML19210C9981979-11-16016 November 1979 Proposed Amend 41 to Tech Specs,Changing Limit for Reactivity Anomalies for Comparison of Measured to Predicted Boron Concentrations to 1% Reactivity ML19256E0081979-10-19019 October 1979 Proposed Tech Spec Amend 40,adding Fire Protection Sys Committed to in Amend 23,deleting Mods Required as License Condition,Adding 5-man Fire Response Requirements & Correcting Inconsistencies 1996-09-05
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205H3401987-01-12012 January 1987 Rev 3 to Reactor Test Program,Kewaunee Nuclear Power Plant ML20080B9721984-01-12012 January 1984 Rev B to Emergency Plan Implementation Procedure EP-RET-3C, Post-Accident Operation of High Radiation Sample Room ML20080B9871984-01-12012 January 1984 Emergency Plan Implementing Procedure EP-TSC-7, Reactor Vessel Head Venting Time Calculation ML20083F7161983-10-27027 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078L5791983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-3 Re Unusual Event, EP-AD-4 Re Alert & EP-AD-5 Re Site Emergency ML20078F4801983-08-16016 August 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual event,EP-AD-8 Re Notification of Alert & EP-AD-9 Re Notification of Site Emergency ML20077Q0481983-07-26026 July 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-ENV-8 Re Total Population Dose Estimate calculations,EP-RET-5 Re Plume Projection & EP-RET-6 Re Dose Projection ML20078G3981983-06-21021 June 1983 Procedure EP-ENV-3D Primary Determination of Meteorological Data ML20078G4431983-06-21021 June 1983 Rev a to Procedure EP-RET-3D Containment Air Sampling Analysis Using Casp ML20078G4371983-06-21021 June 1983 Rev B to Procedure EP-ENV-3H Protective Action Recommendations ML20078G4331983-06-21021 June 1983 Rev D to Procedure EP-ENV-3G Manual Projection Calculation ML20078G4061983-06-21021 June 1983 Rev E to Procedure EP-ENV-3E Manual Determination of X/Q (Knpp Meteorological Data) ML20078G3941983-06-21021 June 1983 Procedure EP-ENV-3C Primary Dose Projection Calculation - Ibm Personal Computer ML20078G3781983-06-21021 June 1983 Rev E to Procedure EP-ENV-3B EM Team Actions ML20078G3681983-06-21021 June 1983 Rev H to Procedure EP-ENV-3A Environ Protection Director Actions & Directives ML20078G3501983-06-21021 June 1983 Rev C to Procedure EP-AD-11 Emergency Radiation Controls ML20077E0041983-06-21021 June 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-11 Re Emergency Radiation Controls & EP-ENV-3A Re Environ Protection Director Actions ML20078G4201983-06-21021 June 1983 Rev D to Procedure EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data) ML20069J5071983-03-10010 March 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Class Determination & EP-AD-11 Re Emergency Radiation Controls ML20069F8351983-03-0101 March 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedure EP-SEC-2, Security Force Response to Emergencies. Revised Table of Contents Encl ML20028D4811983-01-0303 January 1983 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. Revised Index Encl ML20066E2691982-10-13013 October 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-2 Re Emergency Class determination,EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20062E0801982-07-0202 July 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. Revised Index Encl ML20058F6741982-06-18018 June 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room ML20054F3961982-05-21021 May 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use ML20052H8421982-04-16016 April 1982 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert ML20052B1051982-03-19019 March 1982 Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. Revised Index Encl ML20042B2491982-02-18018 February 1982 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation.Revised Index Encl ML20049H4151982-01-29029 January 1982 Public Version or Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Sam II Operation & EP-EOF-4 Re Corporate Response to Alert.Revised Index Encl ML20040F9781982-01-15015 January 1982 Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency.Revised Table of Contents Encl ML20039H1491981-12-21021 December 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-3 Re Unusual Event & EP-AD-4 Re Notification of Unusual Event ML20038C3821981-10-21021 October 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-AD-2 Re Emergency Classification Determination & EP-AD-3 Re Unusual Event ML20038A5641981-07-0101 July 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation ML20038A5761981-06-0303 June 1981 Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure ML20038A5631981-03-31031 March 1981 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Acd 12.1 Re Emergency Organizational Structure,Acd 12.3 Re Unusual Event Notification & Acd 12.4 Re Alert ML20038A5661981-02-27027 February 1981 Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation & Public Info Plan 1987-01-12
[Table view] |
Text
. '.' I
.. . 1
. WISCONSIN PUBLIC SERVICE CORPORATION I NO. EP-ENV-3C l Primary Dose Projection Kewaunee Nuclear Power Plant l TITLE Cal cula tion -
/7 l IBM Personal Computer (i EMERGEtEY PLAN 1l4PLEMENTING PROCEDURE l 1 DATE:
t 1 PAGE 1 of 4 JUN 211983 I I l
REVIEWED EY _) R ;[/he/o l APPROVED BY [/ '
n tuv-( ~l I
- l. .
1.0 APPLICABILITY ,
This procedure will be utilized by the Environmental Protection Director during any incident that invcives a significant release of radioactive materials to the environment, for the purpose of projecting a radiological dose inpact.
2.0 PRECAUTIONS _ -
2.1 Ensure all data on the foms of the procedure is accurately recorded.
2.2 Check all calculations for accuracy. ,
l n 2.3 Ensure that all cable connections on the computer are secure.
2.4 If the IBM personal computer is not available for use, proceed to EP-RET-5, Plume Projection, and EP-RET-6, Dose Projection, for per-forming dose projection calculations.
2.5 If both IBM personal computer and IBM mainfram computer are not available for use, proceed to ENV-3E, 3F, and 3G for performing dose projection
( cal culations. ,
2.6 Meteorological data must be re-evaluated every 30 minutes or whenever significant changes occur, to determine if dose projection should be recal culated-l 3.0 REFERENCE 3.1 U.S. NRC Regulatory Guide 1.109, Calculation of Annual Doses to Man from Routine Release of Reactor Effluents for the Purpose of Evaluating .-
3.2 U.S. EPA, Manual of Protective Action Guides and Protective Actions .
for Nuclear Incidents, EPA-520/1-75-001, September 1975. Appendix D l
Technical Bases for Mcthods the Estimate the Projected Thyroid Dose l and Projected Whole Body Gamma Dose from Exposure to Airborne Radiciodines and Radioactive Noble Gases.
/~'N l
B310120220 830929 PDR ADOCK 05000305 F PDR
I
,.- I
.- l NO. EP-ENV-3C
" WISCONSIN PUBLIC SERVICE CORPORATION
- l Primary Dose Projection Kewaunee Nuclear Power Plant l TITLE Calculation -
1 IBM Personal Computer EMERGENCY PLAN IMPLEMENTING PROCEDURE l i DATE:
M 211983 l PAGE 2 of 4 4.0 INSTRUCTIONS 4.1 Starting the IBM Personal Computer ,
4.1.1 Acquire the 51/2 inch diskette labeled " Dose Projection" from 3 the office supplies storage file in the EOF bullpen. .
4.1.2 Insert the diskette into the IBM personal computer's disk drive A. When facing the computar, the diskette label should be on the right in the corner nearest you. Close the door on disk drive A.
4.1.3 Turn the conputer on. Turn the printer on. It should take approximately 40 seconds before the computer responds.
4.1.4 The Dose Projection Program is now executing. A menu will soon appear on the screen. Instructions will appear at the bottom of the- screen. -
4.2 Dose Projection from Plant Release Data 4.2.1 Acquire the plant release data on Fonn ENV 3C.1, Plant Release Ct/m' Data, from the RAF or the TSC and conplete the appropriate section of the Form.
4.2.2 Acquire meteorological data on Forms ENV-3D.1 or ENV-3F.1, (Section I & II), Meteorological Data Worksheet and ENY-3C.1, IBM Personal Computer.
4.2.3 Enter data collected in IBM personal computer, j
4.2.4 Proceed to procedure EP-ENV-3H, Protective Action Recommendation,
, to determine the appropriate protective action recommendation.
4.3 Dose Calculation from Field Sample Data
- 4. 3.1 Acquire the field sample data on Form ENV-3C.2, Field Sample Data, from the EM team coordinator. -
4.3.2 Acquire the meteorological data on Fonns ENY-3D.1 or ENV-3F.1, '
(Section I & II) Meteorological Data Wortsheet, that is closest in time to the time on form ENY-3C.2, Field Sample Data.
4.3.3 Enter data collected on Forms ENV-3D.1 or ENV-3F.1, (Section I & II),
Meteorological Data Worksheet and ENY-3C.2, Field Sample Data into the IBM personal computer.
A 4.3.4 Proceed to procedure EP-ENV-3H, Protective Action Recommendation, to determine the appropriate protective action recommendation.
EP-ENV-3C JUR 21 BB3 Page 3 of 4 FORM ENV-3C.1 PLANT RELEASE DATA DATE TIME Reactor Trip: Date Time Expect P,elease: Duration: Hours ..,.
I. STACK ANALYTICAL RESULTS Operating Fans: (circle one) Aux. A / Aux. B / Aux. A and'8 SVA / SYB / SVA and SVB ISOTOPE CONCENTRATION (uci/cc)
Kr-85 KR-85m .
KR-87
As Xe-133m Xe-135 Xe-135m
1-131 _
~
^
l .
II. SPING RESULTS .
Operating Fans: (circle' one) Aux. A / Aux. B / tax. A and B SVA / SVB / SVA and SYB -
s Latest 10 minute Iodine Average uCi/cc ,
Latest 10 minute Gas Average uCi/cc , .
III. STEAM RELEASE .,
Main Steam Line Monitor: R/hr SI Flow Rate: gpm.
e
-c
. s
-- , EP-EIN-3C jun 211983 -
Page 4 of 4i i
' FORM ENV 3? 2 - ,
FIELD SAMPLE DATA , ~
a DATE TIME
"~
Sample Location:
Sample Time: _
i fearest Isopleth:
I. GAS ANALYSIS I ,
ISOTOPE CONCENTRATION (uCf/cc) ,
~
Kr-85 .
KR-85m -
KR-87 - -- -
m KR-88 -I Xe-133 -
~ Xe-133m ,
Xe-135 __
Xe-135m II. DIRECT FIELD READINGS 1
~
i Whole, Body Dose Rate: REM /hr -( . .
Iodine Concentration: uCf/cc k * .