MONTHYEARML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request 2024-09-03
[Table view] |
Text
From: Habib, Donald Sent: Tuesday, February 11, 2020 8:31 AM To: Vogtle PEmails
Subject:
Audit Questions Vogtle Units 3 and 4 - LAR 19-017 2020-01-08 Redacted-Public.docx Attachments: Audit Questions LAR 19-017 2020-01-08 Redacted-Public.docx
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 535 Mail Envelope Properties (BL0PR0901MB366719EAF28C2FC2F9FCBF5E97180)
Subject:
Audit Questions Vogtle Units 3 and 4 - LAR 19-017 2020-01-08 Redacted-Public.docx Sent Date: 2/11/2020 8:31:00 AM Received Date: 2/11/2020 8:31:03 AM From: Habib, Donald Created By: Donald.Habib@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: BL0PR0901MB3667.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 6 2/11/2020 8:31:03 AM Audit Questions LAR 19-017 2020-01-08 Redacted-Public.docx 33235 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
LAR-19-017- Audit Questions/Comments January 8, 2020
- 1) The LAR proposes to include line resistance acceptance criterion for the PRHR subsystem of 3.085e-6 ft/gpm^2. [
]
- 2) [
]
- 3) E&DC Licensing Impact Determination Checklist Question 10 (Does the proposed AP1000 Activity deviate from the applicable CLB Regulatory Guides, codes and standards?) was answered No. Why? RG 1.68 specifies performance of a natural circulation test; therefore, without such a test there cannot be conformance with that portion of the guidance.
- 4) [
]
- 5) After SNC submitted LAR 19-017 to the NRC on September 6, 2019, there were several interactions with the staff and the SNC was planning to send a supplement to the LAR.
For the staff to be able to focus on the audit, please provide a draft of the supplement you are working on and a planned date of submittal.
- 6) It is not clear how different data supports LAR 19-017. For example, whether the line resistance PRHR is going to be used for calculating natural circulation flow is not clear.
- 7) Providing a roadmap for the documents provided on Westinghouse ERR will make the audit more efficient. The staff is interested in knowing how those documents support LAR 19-017.
- 8) Enclosure 1 to LAR 19-017 states the following:
In the AP600 Final Safety Evaluation Report (FSER), the NRC staff confirmed that the exception to RG 1.68 was acceptable provided that the training requirements (described in UFSAR Subsection 1.9.4.2.1, TMI Action Plan Issues, under I.G.I, Training Requirements) are met and that Westinghouse demonstrates that all plants remain identical in physical layout and configuration of the proposed plant key components, and validate that acceptance criteria for the ranges of values for other system flow performance measurements that are taken during the ITP confirm that the overall flow characteristics of the proposed plant are
LAR-19-017- Audit Questions/Comments January 8, 2020 equivalent to the reference plant. Demonstrations of the layout of primary components as well as flow measurements are confirmed during the ITAAC closure process and preoperational testing.
Therefore, conformance with the RG requirements as described by the NRC staff in the AP600 FSER is maintained without performance of the preoperational PRHR heat exchanger natural circulation test.
However, AP600 FSER Section 14.2.9.2 states the following:
The staff confirmed that the new Section 14.2.10.3.7, "Passive Residual Heat Removal Heat Exchanger (First Plant Only)," provides for natural circulation testing of the PRHR system during startup testing of the initial plant. In addition, all plants are subjected to natural circulation testing of the PRHR during hot functional testing as described in Section 14.2.9.1.3.(e), (f), and (g). The staff finds that these testing provisions, in conjunction with the issues addressed in SSAR Section 1.9.4.2.1, item I.G.1, and the exception to RG 1.68, Appendix A.4.t in SSAR Appendix 1A, adequately address natural circulation testing for the AP600 design. On these bases, the staff also finds that a COL action item is no longer required on this subject. The staff finds this acceptable, and therefore, OSER COL Action Item 14.2.8-1 is dropped and OSER Open Item 14.2.8-7 is closed.
As such in AP600 FSER the staff has relied on Section 14.2.9.1.3(f) testing which LAR 19-017 proposes to remove and the exception to RG 1.68 apply to the Section 14.2.10.3.7, "Passive Residual Heat Removal Heat Exchanger (First Plant Only) test but not to the Section 14.2.9.1.3(f) test. Please explain.