- EMET EMSER l- ! $ . . . [h ) h.h PROD. & UTIL. fE.30-31Tk-3MM 00 ?. ~
UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION 1
In the Matter of )
) Docket Nos. 50-329A CONSUMERS POWER COMPANY ) and 50-330A (Midland Units 1 and 2) )
i APPLICANT'S MOTION TO COMPEL RESPONSE TO DISCOVERY TO INTERVENORS Pursuant to Section 2. 740 (f) (1) of the Commission's Rules of Practice, 10 C.F.R. Part 2, Consumers Power Company
."( Applicant") moves the Board for an order compelling the Intervenors to comply with the attached items of Applicant's interrogatories and document requests no later than April 20, 1973, or five days after such a Board order (whichever is later). These requests were originally served upon the inter-vening municipal and cooperative parties on August 4, 1972.
Although th3 Intervenors have filed no objections to the aforementioned discovery,- they informed Applicant on April 5, 2/
1973, of their refusal to comply with certain items th9. rein.
p 1/ Appendix I constitutes those items directed to the muni-cipal Intervenors; Appendis. It is directed to the coop-erative Intervenors.
-2/ On April 5, 1973, the IntervenorL s ro advised Applicant that they had completed responses to all of Applicant's discovery demands. Applicant has, of course, not yet had an opportunity to review the responses to determine the extent of compliance. Once that review is complete Applicant may have occasion to seek another Board order.
)/
@ S CGCKETED -
!! .M a l Z APR 91973 >
a- m, ee :n Pd:3fm qs 5
,8006230 72 E \ e qe 4
,/ ,
a .
I. The Discovery Sought is Relevant The information sought through Applicant's dis-covery-to the Intervenors is similar in nature and scope to discovery against the non-party municipals which the Board approved in its orders of February 16 and March 5, 1973 (See also Tr. 219-320). Like the non-party discovery, this discovery is relevant under the Commission's Rules since it " relates to the claim or defense of the party seeking discovery or to the claim or defense of any other party . . . .
(Section 2.740 (b) (1) of the Rules of Prac-tice) (Emphasis supplied) .
Among the Applicant's principal claims and defenses to the matters raised by the Department of Justice and the Intervenors are that (1) Applicant's wholesale ser-vice to area municipal and cooperative systems provides ade-quate " access" to the benefits of nuclear generation and coordination, (2) that this service permits these systems to be financially and competitively viable to the extent permitted by law, and (3) that, hence, Applicant has not " denied access" to its coordinated system and no situation inconsistent with the antitrust laws is presented. Since the hearing Board's order of August 7, 1972, specifically identified " access to coordination" as the " basic thrust" of the Department's case (p. 3), Applicant's foregoing claims and defense with regard
[
e .
3-to the " access" issue are clearly relevant to this: proceed-ing 'and appropriate for discovery under the Commission's Rules.
Many of the items in Applicant's discovery to the Intervenors relate to the competitive viability of the inter-vening electric systens. The competitive viability of these systems has been-put in issue by the Department of Justice, as.well as by the Applicant. For example, in the Depart-ment's " advice" letter of June 28, 1971, the Department i
alleged that Applicant "may be exercising that (market]
power to deny to those competitors participation in coordin-ated bulk power supply to the extent necessary to maintain their long-term competitive viability" (pp. 5, 6). Simil-arly, the Department has supported its document demands, inter'alia, with the rationale that the requested material shows "particularly well the effect of cost-price squeese on a small system which, lacking access to coordination, is com-pelled to deal with its vertically integrated competitor for its bulk power supply" (" Answer of the Department . . .,
filed November 2, 1972, p. 34) (emphasis supplied) .
Competitive viability can be demonstrated in some instances by a showing that a municipal system's retail rates compare favorably with Applicant's, and that at these rates the system has grown, has maintained a reasonable rate of
o~ u se
-s- ,
return, and will continue to grow and prosper after the licensed units become operational. Where a municipal system's retail sales do not presently compare favorably with Applicant's, Applicant's discovery seeks to ascertain whether these rates could be lowered to a competitive level, without jeopardizing the financial viability of the system.
Such a financial viability analysis, of course, requires an examination of the system's revenues and costs
-- including, for example, the value of services that the electric system provides to non-paying sources such as the municipal government, and the extent to which revenues pro-duced by the electric system are used for non-electric sys-tems purposes. It also requires that the data utilized in the analysis be comparative -- both over time and among the various systems.
In addition to the question of competitive and I financial viability, the Department and the Intervenors have raised issues and have sought discovery concerning Applicant's allegedly anticompetitive conduct concerning, I inter alia, bulk power supply, interconnection arrange-ments, and competition for retail customers.
2/ 1 Many of 3/ See, e.g., Department of Justice advice letter in this proceeding of June 28, 1971, pp. 3, 5-8; Joint Petition to Intervene and Request for Hearing, filed October 4, 1971, pp. 7-9.
l
-l v.
.- e Applicant's document requests and interrogatories are also relevant to'these issues and to Applicant's claim that it has engaged in no anticompetitive conduct.
Applicant's need-for full discovery against the Intervenors is underlined by the extensive discovery requests by the Department, the Intervenors, and the Staff which have sought the details of Applicant's relations with 5j
- other utilities -- including the intervening systems.
These demands raise the distinct possibility that Applicant will be confronted with evidence respecting such relation-ships which it will be handicapped in rebutting absent full discovery.
-4/ To date, Applicant has been served with the following discovery demands in this proceeding: Nineteen inter-rogatories from the Commission at the behest of the Department (February 25, 1971); four interrogatories from the Department (June 4,1971) ; four document re-quests by the Department (October 29, 1971); twenty-five interrogatories from the Commission staff (Nov-ember 8, 1971); thirty Joint Document Requests from the Department, the Staff, the Association, and other Intervenors (July 26, 1972); four document requests from the Department (August 16, 1972); seven document requests from the Association and other Intervenors (September 21, 1972); and 235 requests for admission and. interrogatories from the Department (February 12, 1973).
5/ This discovery also inquiries into such matters as rates and promotional activities; the details of Applicant's generation, transmission and distribution facilities; its operating and planning characteristics, including
- -its pooling and interconnection arrangements; and its financial condition and accounting methods.
." i With regard to Applicant's similar discovery efforts against the twenty-one non-party municipals, the Board held:-6/
If it is found that a situation inconsistent with the antitrust laws will be maintained by issuance of the license sought by Applicant,
. then such license, if issued, could be sub-ject to conditions deemed by Applicant _tc be economically severe. Applicant has a right to contest the contentions of the other parties to this proceeding by every lawful means, including relevant discovery.
Applicant submits that the foregoing language applies with equal force to the discove'r y here sought -- perhaps even greater force since the intervening systems are participating as. full parties in this proceeding.
II. It is Too Late to Object to Applicant's Discovery ,
Applicant's discovery requests to the Intervenors were served upon them more than eight months ago. Since t'.e Intervenors have never filed objections to the requests with the Board, it is clearly too late to do so at this late
+
j uncture. (See Sections 2.740b(b) and 2.741(d) of the Rules.)
Last September and October,1972, counsel for App-licant and the Intervenors met to discuss this discovery, and Applicant agreed to narrow the scope of certain requests.
However, as the intervening parties began to provide res-6,/ " Order Denying Supplemental Motion ...," dated March 5, 1973, pp. 4, 5.
L_ _
ponses to the discovery, it became apparent that (1) the Intervenors were declining to answer certain discovery items on grounds not raised at these discussions and that
.(2) there had been a failure of communication with regard to some of the discovery modifications discussed among counsel at these meetings.
Subsequent efforts by counsel to resolve their differences have proven unsuccessful. Although the Appli-i 2/
cant has consistently made known its contrary views, the Intervenors continue to raise objections not previously pursued (see letter from Pollock dated February 12, 1973) and to disagree with Applicant about the content of afore-mentioned discussions of last fall (see letters from Pollock 8/
dated March 2 and 12, 1973).- Finally, by letter dated April 5, 1973, the Intervenors advised Applicant of their 7/ See letters from Watson to Pollock dated February 12, March 16, March 20, and-April 5, 1973.
-8/ Such-failure of communication is not surprising given the extensive and informal nature of the discussions that transpired over the course of several weeks. -Although Applicant's version of the discussions is buttressed by contemporaneous notes, we do not or good faith of opposing counselguestion the views s differing veracity in this' regard. Rather,.it is submitted, the discovery items which the Intervenors now decline to answer should be considered on their own merits, and that it would be impractical and, in any event, inexpedient for the Board to attempt at this date to mediate the present disagree-ment.as to what was or was not agreed upon in the Fall 1972 meetings of counsel.
~
refusal to comply fully with Applicant's discovery.
Given the history and the extent of previous negotiations and the rapidly-approaching hearing date, Applicant believes that the Board must resolve the differences which have arisen between the parties. The attached list of items consists of those discovery re-quests which the Intervenors have refused to answer, either in whole or in part. In no case is the request broader in scope than the language contained in the dis-covery requests as originally served; in many instances the language of the items is exactly the same, while in others Applicant has narrowed the scope in accordance with Applicant's understanding of the aforementioned discussions of counsel.
Since the requests are either the same, or narrower, than the discovery served upon the Intervenors nearly eight months ago, we submit that it is too late to object to Applicant's discovery or delay responding any longer. In any event, such objections are without merit in light of Applicant's demonstration of their relevance in Part I, supra.
Conclusion WHEREFORE, Applicant moves the Board for an order compelling the intervening municipal and cooperative systems ;
l l
A. ,
9-to respond in full to Applicant's discovery requests attached hereto by the close of business April 20, 1973, or five days following the issuance of said order (which-ever is later) . n Respectfully submitted, Wm. Warfield Ross Keith S. Watson Attorneys for Consumers Power Company WALD, HARKRADER & ROSS 1320 Nineteenth Street, N. W.
Washington, D. C. 20036 (202) 296-2121 Of Counsel:
Harold P. Graves, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 April 9, 1973
.A .
UNITED STATE 3 OF AMERICA ATOMIC ENERGY COMMISSION In the Matter of ) >
) Docket Nos. 50-329A CONSUMERS POWER COMPANY ) and 50-330A (Midland Units 1 and 2) )
j- -CERTIFICATE OF SERVICE I hereb/ certify that copies of APPLICANT'S MOTION TO COMPEL RESPONSE TO DISCOVERY TO INTERVENORS, dated April 9, 1973, in the above-captioned matter have been served on the following by deposit in the United States mail, first class or air mail, - diis 9th day of April, 1973:
Jerome Garfinkel, Esq. , Chairman Dr. J. V. Leeds, Jr.
Atomic Safety and Licensing Board P. O. Box 941 Atomic Energy Commission Houston, Texas 77001 Washington, D. C. 20545 William T. Clabault, Esq.
Hugh K. Clark, Esq. Joseph J. Saunders, Esq.
P. O. Box 127A David A. Leckie, Esq. '
Kennedyville, Maryland 21645 Public Counsel Section Antitrust Division James' Carl Pollock, Esq. Departmen t of Justice 2600 Virginia Avenue, N. W. Washington, D. C. 20530 Washington, D. C. 20037 Joseph Rutberg, Jr., Esq.
Antitrust Counsel .for AEC Regulatory Staff Atomic Energy-Commission Washington, D. C. 20545 -
Wallace E.' Brand, Esq.
Antitrust Public Counsel Section P. O. Box 7513
. Washington, D. C. 20044 Atomic Safety and Licensing Board Atomic Energy Commission Washington, D. C. '20545 Keith S. Watson
- r _. __ - - - .
. 4 3 a APPENDIX I (MUNICIPALS) l + - _ _
Definitions and General Directions
- 1. " Document" means the original, any copy (regsrd-less of origin), and all drafts of all writings of every kind in the possession, custody or control of the system or munici-pality, including all drafts of correspondence, memoranda, re-ports, financial reports, vouchers and other accounting records, notes, letters, telegrams, messages (including reports of tele-phone conversations and conferences), studies (including, but not limited to, load flow, engineering, general economic and market studies), analyses, comparisons, books, magazines, news-papers, booklets, circulars, bulletins, notices, instructions, minutes and other communications, including inter- and intra-office communications, transcripts, purchase orders, question-naires and surveys, maps, charts, graphs, electrical or geo-graphic diagrams including those known in the trade as "one line diagrams", photographs, phonograph or other recordings and other data compilations from which information can be obtained. Only documents dated on or after January 1, 1960 need be produced.
In all cases where documents are requested, legible copies should be submitted.
Each document produced and response hereto should identify the Interrogatory number (and subparagraph, if any) to which it is responsive and should be arranged serially according to such number.
- O b
- 2. " Electric utility" and " utility" meant F.ny pri-vate corporation, coopolative corporation, municipality, or any political subdivision, agency or instrumentality of the Federal or any - state or municipal governn ent which owns or controls facilities Lor the generation, transmission or dis-tribution of electric power and energy,<r which in the past has done so.
- 3. " Coordination" and " coordinating" shall include,
~
but are not limited to, reserve sharing, economic dispatch or economic interchange, and pooling of load growth for joint or staggered additions of generating or transmission facilities.
- 4. " Integration" and " integrating" shall mean the coordination or coordinating of bulk power supply facilities by a single utility or by two or more utilities owned or controlled
!- by a common ent..ty or common financial interest.
- 5. " Municipality" shall mean each city, town, village or other political subdivision, incorporated or unincorporated, in which the system principally provides electric service.
- 6. The account titles used herein shall be defined as in the Uniform System of Accounts Prescribed for Public Utilities and Licensees (Class A and B).
- 7. In all cases where data are requested by years,
. indicate.whether the information is provided on a calendar or fiscal year-basis. Such basis shall be the usual accounting period used by the system. If data are provided on a fiscal l
year basis, state the day on which each fiscal year ended and provide data through fiscal year 1972 if such fiscal year ended on or before June 30, 1972. -
- 8. In the event any document requested in these in-rarrogatories is unavailable, specify in detail the reason therefor.
- 9. If any document requested is available, but is withheld by reason of any assertion of privilege or other alaim, describe each such document, including the name, address and position of the persons preparing and receiving it, the forra of the document, its title (if any) and the matter to which it relates. In addition, provide a brief statement of the grounds on which privilege or other claim is being asserted.
- 10. Answers to Interrogatories referring to docu-ments shall include all documents relating to the time period specified in each of said Interrogatories, whether prepared before, during or after said period.
- 11. If any question is inapplicable, so state and provide a brief explanation of why the Interrogatory is in-applicable.
Interrogatories and Request for Documents
- 1. For each year 1960 to date furnish copies of all financial, operating, load and capacity reports or statements submitted to the Federal Power Commission, the Michigan Public Service Commission, the Edison Electric Institute, the American
.o .
Public Power Association, the Michigan Municipals and Coopera-tives Power Pool, the Michigan Municipal Electric Association, or to any. local governing authority or official. Where reports or statements are prepared monthly and summarized in annual reports or statements, respondent may furnish all such annual reports or statements together with monthly reports or state-ments for 1961, 1966, and each month since Decembo., 1969.
- 7. (a) State the effective date and dtscribe the substance of each change made in any rate schedule, tariff, contract, agreement or terms and conditions of service at any time during the period January 1, 1960 to date.
(b) State the effect on revenues of each such change in dollar and percentage terms. If information concern-ing such changes is not available from the system's (or the municipal's) records, provide documents which show the contem-plated or projected effect of each such change.
- 9. For each of the dates January 1, 1960, January 1, 1965, January 1, 1970, January 1, 1972, and June 30, 1972, state the typical net monthly bills for electric service employing tie assumptions and definitions set forth in Attachment A for the following customer classification and monthly demand-energy combination (designate the rate schedule used for each calcu-lation and identify any discount or special charge) :
(a) Residential (i) minimum bill and number of kilowatt-
^ '
O ,
hours included; indicate the number of minimum bills rendered
, in each month of each of these years; (ii) 100 kilowatt-hours; (iii) 250 kilowatt-hours; (iv) 500 kilowatt-hours; (v) 750 kilowatt-hours; (vi) 1,000 kilowatt-hours.
(b) Commercial (i) 3.0 kilowatts-375 kilowatt-hours; (ii) 6.0 kilowatts-750 kilowatt-hours; (iii) 12.0 kilowatts-1,500 kilowatt-hours; (iv) 30.0 kilowatts-6,000 kilowatt-hours; (v) 40.0 kilowatts-10,000 kilowatt-hours.
(c) Industrial (i) 75 kilowatts-15,000 kilowatt-hours; (ii) 75 kilowatts-30,000 kilowatt-hours; (iii) 150 kilowatts-30,000 kilowatt-hours; (iv) 150 kilowatts-60,000 kilowatt-hours; (v) 300 kilowatts-60,000 kilowatt-hours; (vi) 300 kilowatts-120,000 kilowatt-hours; (vii) 500 kilowatts-100,000 kilowatt-hours; (viii) 500 kilowatts-200,000 kilowatt-hours; (ix) 1,000 kilowatts-200,000 kilowatt-hours; (x) 1,000 kilowatts-400,000 kilowatt-hours; (xi) 2,500 kilowatts-1,000,000 kilowatt-hours; (xii) 5,000 kilowatts-2,000,000 kilowett-hours.
J ,
[In place of the foregoing response, respondent may state the system's rate schedules and adjustment levels and may designate what rate schedule should be utilized in the computa-tion of each bill, Only such information sufficient to enable Applicant to compute each of the aforementioned monthly bill analyses vill be deemed a proper response to this request.]
- 10. (a) For each township or incorporated area served by the system, state for each year 1960 through 1971--1/
the name and address of the five industrial and five commer-cial customers consuming the largest number of kilowatt hours of electricity supplied by the system.
(b) For each customer named in 10 (a) state 1/
for each year 1960 through 1971-- the following:
(i) kilowatt-hour sales to the customer; (ii) revenues derived from the customer; (iii) the customer's peak demand; (iv) the yearly load factor for the customer; (v) applicable rate schedules for ser-vice to the customer; (vi) the minimum yearly charge applic-
~
able to the customer; (vii) the voltage at which service was provided to the customer.
1/- In lieu of providing data for each year, respondent may pro-vide a response for 1971 and state to what extent information is available from system or municipal records. Applicant re-serves the right to obtain a response concerning prior years following review of the initial limited response. I 7 . ,-,9 >y e
- 11. (a) State the length and voltage of each trans-s mission or distribution line running from the bulk power supply delivery point to each of the customers identified in response to Interrogatory 10. Describe each delivery point used.
(b) State separately the cost of constructing each line and the cost and description of each related facility required to deliver power to such customers.
- 15. (a) Provide the name and address of each com-mercial and/or industrial customer or potential customer with whom any discussion, approach or other contact was made during the period January 1,1960 to date utilizing, in whole or in part, information or material described ~-1/ in Interrogatory 13
- or 14 of Applicant's Initial Interrogatories to the system, filed August 4, 1972.
(o) Furnish copies of all documents relating to each such discussion, approach or contact.
- 18. Describe each discount or any other valuable consideration offered by the system or the municipality to any customer or potential customer for electric service and fur-nish all documents related to such discount or other consid-eration.
- 20. If municipal tax revenues are utilized by the electric system, state the rates in effect at any time during
~1/
The referenced information and material relates to efforts to'the in attract commercial municipality and/or or within industrial the facilities area served toelec-by its locate tric system.
the period January 1, 1960 to date of each tax imposed by the municipality during that period and indicate the dates during which each rate was in effect.
- 21. (a) If municipal tax revenues are utilized by the electric system, state whether real property is presently assessed at true cash value.
(b) If municipal tax revenues are utilized by the el'ectric system, and if any real property is now, or at any time since January 1, 1960 has been, assessed at other than true cash value, set forth:
(i) the type of property (residential, commercial, industrial, e.g.) for which a lesser valuation is or was assessed; (ii) the effective date (s) of such valuation; (iii) the percentage of true cash value that the assessed valuation represents for each type of property.
- 23. (a) State the system's operatirr revenues, excluding any sales tax receipts, for each vear 1960 through 1971.
(b) State whether the figures provided include an imputation for the value or cost of services donated to or l
~
provided to the municipality or any of its agencies or depart-ments. If so:
1
(i) state the amount of any such impu-tation; (ii) state whether each amount is classi-fied an a tax equivalent.
- 24. (a) State the system's operating expenses for each year 1960 through 1971.*
(b) State whether the figures provided in re-sponse to Interrogatory 24 (a) include an imputation for the value or cost of services donated to or provided to the muni-cipality or any of its agencies or departments. If so:
(i) state the amount of any such ir.pu-tation; (ii) state how tnat value was determined; (iii) state whether this amount is clas-sified as a tax equivalent; (iv) state whether this imputation is included in the system's operating revenue figures furnished in response +.o Interrogatory 23.
- 25. State the annual depreciation and amortization expense applicable to the system's electric plant (s) for each
- / In response'to this Interrogatory and to all others indi-cated by an asterisk use the same time period as was used in response to Interrogatory 23; e.g., if calendar years were used there, use calendar years, if fiscal years end-ing June 30, use fiscal. years ending June 30. Data should be provided for each year ending on or before June 30, 1972.
i l
l
year 1960 through 1971.* State the basis on which such ex-penses were calculated.
- 26. State the amount of taxes paid which are applic-able to electric operations for each year 1960 through 1971.*
(a) Classify such taxes by type (e.g. , local property, franchise, federal income, etc.);
(b) State to whom paid; (c) State on what date each tax was paid; (d) State whether these taxes are included for each year in the system's operating expense data furnished in response to Interrogatory 24. If so, state for what year and under what account designation.
- 27. (a) State the amount of tax equivalents for each year 1960 through 1971.* (As used herein, " tax equiva-lents" is defined as set forth in FPC Form 1-M.)
(b) Describe in detail each service provided or payment made which is classified by the system as tax equiva-lents1and set forth: '
(i) the estimated value given to each such service in each year; (ii) the method by which the value of any service donated to or provided to the municipality or any.of its agencies or departments was determined; (iii) whether each amount specified in ,
i
_ response to subparagraphs (a) and (b) of this Interrogatory l 1
1 l
6 is included in the operating revenue and expense data fur-nished in answer to Interrogatories 23 and 24, respectively.
- 28. (a) State the cost and estimated value of, and describe in detail each service donated to or provided to the municipality or any of its agencies or departments.
(b) List the amount and date of each payment made to the municipality, or any of its agencies or depart-ments, which is not classified as a tax equivalent but is included in the operating revenue and cost data furnished in response to Interrogatories 23, 24 and 27.
(c) For each payment specified in response to subparagraph (b) of this Interrogatory, state how the value of any service donated to or provided to the munici-pality or any of its agencies or. departments was determined.
- 29. State the amount of the total funds trans-ferred by the system to the general funds, or other account, of the municipality or to the account of any other municipal department or agency during each year 1960 through 1971.*
In each case specify:
(a) the amount; (b) title of the account to which such funds were transferred; (c) -the year in which such transfer was made; (d) the year in which it is reflected in the
. data.*
' ~
- 30. State the total kilowatt-hours supplied to the municipality and any of its agencies and departments by the system for-each year 1960 through 1971* and the total revenues actuall:r derived therefrom for each such year.*
31.
State the priqs per kilowatt-hour paid by the municipality and any of_its agencies and departments for elec-tric energy rupplied to it by the system during each year 1960 through 1971.*
- 32. State the system's total electric plant in ser-vice, accumulated provisions for depreciation of electric utility plant and net electric utility plant at the end of e each year 1960 through 1971.*
- 33. State the electric total production plant in
~
service and the accumulated provisions for depreciation of electric utility production plant at the end of each year 1960 through 1971.*
- 34. (a) State the electric total transmission plant in service and the accumulated provisions for depreci-ation of electric utility transmission plant at the end of each year 1960 through 1971.*
- (b) For each year'1960 through 1971* state the basis on which the system classified such facilities as transmission plant.
- 35. (a) State the electric total distribution plant in service and the accumulated provisions for depreci-
o' .
ation of electric utility distribution plant at the end of each year 1960 through 1971.*
(b) For each year 1960 through 1971* state the basis on which the system classified such facilities as distribution plant.
- 36. State the total outstanding long-term debt attributable to electric utility operations at the end of each year 1960 through 1971* and state the type, the date of issuance, the maturity date, the principal amount and the interest rate of securities or other documents evidencing this debt as of each of said dates.
- 37. State the total outstanding short-term debt attributable to the electric utility operations at the end of each year 1960 through 1971* and state the type, the date of issuance, the maturity date, the principal amount and the interest rate of the securities or other documents evidencing this debt as of each of said dates.
- 38. (a) State the total interest, respectively, on long-term debt and on short-term debt attributable to electric utility operations during each year 1960 through 1971.*
(b) For each year 1960 through 1971,* state whether the amount of short-term debt specified in response
-to subparagraph (a) of this Interrogatory was included as an
o .
operating expense in data furnished in respcnse to Interrog-atory 24. If not, state how much of such debt was included in the operating expense data.
- 39. State the interest rate on the most recent bond issue of the municipality (or any agency or department thereof in which the system serves) where the receipts from said issue were utilized, in whole or in part, by the electric system.
State.also the date of said issue and its maturity date.
- 40. State the most recent credit rating applic-able to debt instruments of the system (or of the municipality, in the event that the system does not issue debt instruments ur that there is no debt rating app? icable to such instruments) .
41 State the amount of construction work in progress-electric at the end of each year 1960 through 1971.*
- 42. State the amount of customer contributions in aid of electric plant construction at the end of each year l
1960 through 1971. *
- 43. State the amount of each of the following ex-I penses for each year 1960 through 1971.*
I (a) customer accounts expenses; (b) administrative and general expenses; (c) distribution expenses; (d) transmission expenses; (e) production operation and maintenance expenses.
l l
l l
I -- j
s' ,
- 44. (a) State the effective date of and describe in detail each change in the system's accounting methodology or' accounting definitions which affect the strict compar-ability over the requested time periods of the material and
'aformation furnished in response to Interrogatories 23 through 43.
(b) If any such change has occurred, furnish data in response to Interrogatories 23 through 43 which are adjusted for each such change and are comparable over the time period 1960 through 1971. [In lieu of this subpart, re-spondent may provide sufficient information to permit Appli-cant to adjust data furnished in response to said interroga-tories so that such data is comparable over the indicated time period.]
- 45. For each year 1960 through 1971, if the system's accounting methodology or definitions reflect any activities or. operations not related to electric service, describe:
(a) The costs which are allocated among these electric and non-electric services and describe the basis on which each cost is-allocated; (b) Describe any allocation of general or ,
common plant to electric operations and the basis on which each such allocation was made.
- 46. For each year 1960 through 1971 state the muni-
-cipal electric system's annual. kilowatt-hour sales, average
a ,
and year-end number of customers, and annual revenue, by class of customer (residential, commercial, industrial, other andL ultimate) :
(a) Within the municipality's corporate limits; (b) For each township or incorporated area served outside of the corporate limits; (c) Total used in response to Interrogatory 23.
- 47. (a) State in detail the basis used in each
. year for classifying customers into the residential, commer-cial,. industrial.and other classifications employed in response to Interrogatory 46.
(b) If this basis has been changed at any time during the period covered by Interrogatory 46, state the date(s) on which such change (s) became effective and describe the sub-stance of such change.
(c) If any change is noted in response to sub-paragraph (b) of this Interrogatory, furnish data in response to Interrogatory 46 which are adjusted for each such change and are comparable over the time period 1960 through 1971. (In lieu of this subpart, respondent may provide information suf-ficient to permit Applicant to make the aforementioned adjust-ments.,
3- 48. State'whether_the data furnished in response, respectively, to Interrogatories 46 and 47' include customers counted more than once who are served -by mo 3 than one meter
, - , - - + - - -~
- ~~
l and/or served under more than one rate schedule. If so, state average and year-end number of customers eliminating such dupli-cation for each of the classes, service areas and time periods
. furnished in response to Interrogatory 46 and/or 47.
49.. (a) State in detail the basis used by the sys-tem for categorizing customers into the " farm, excluding irri-gation and drainage pumping", " irrigation and drainage pumping",
"nonfarm-residential", " commercial", " industrial", and other classifications utilized in completing either Schecule 4 of the Federal Power Commission's (FPC) Form 12A for the year ending December 31, 1971 or Schedule 10 of the Federal Power Commission's Form 12 for the year ended December 31, 1971.
(b) State whether a different basis ever has been used during 1960 through 1971 for purposes of reporting to the FPC on Forms 12 or 12A. If so, state the date (s) on which such change (s) became effective and describe the sub-stance of each such change.
- 50. State the number of customers and kilowatt-hour sales by customer class for each of the years ended December 31, 1960 through December 31, 1971 using the same customer classification and accounting method used in re-porting to the FPC on Schedule 4 of Form 12A or Schedule 10 of - Form 12 for the year ended December 31, 1971. (In lieu of this interrogatory, respondent may provide information sufficient to enable Applicant to calculate the data requested.]
- o. .
- 51. State whether the data furnished in response to Interrogatory 50 include customers counted more than once who are served by more than one meter and/or served under more than one rate schedule. If so, state average and year-end
~
number of customers eliminating such duplication for each of the classes and time periods furnished in response to Inter-rogatory 50. (In lieu of this interrogatory, respondent may provide information sufficient to enable Applicant to calcu-late the data requested. ]
- 52. (a) For each township or incorporated area served by the system, list the names and addresses of the system's industrial and commercial customers which ceased taking electric service from the system during the period 1960 to date and provide the kilowatt-hours consumed by each such customer in the full year preceding such determination.
If the kilowatt-hours data is not provided, describe the efforts used to obtain it. (In lieu of this list, respondent may limit its list to the system's ten largest customers which ceased taking service. In making the " largest" determination, the kilowatt-hours consumed by each such customer in the full year preceding such termination should be used.]
(b) State the reasons, if known, for the loss of each customer specified in response to subparagraph (a) of this Interrogatory, and the date each terminated service.
(c) State whether any service drops or other
facilities were transferred by the system to any other electric supplier as a result of such-termination. If so, specify:
(i) the facilities transferred; (ii) the compensation, if any, received by the system for such transfer; (iii) the date on which such transfer was made.
(d) Furnish all documents relating in any way to the loss of each such customer or the facilities trans-ferred in connection with auch loss of customer.
(e) Name the electric sunplier who now serves each customer named in response to subparagraph (a) of this Interrogatory.
- 53. (a) For each township or incorporated area served by the system, list the names and addresses of the system's industrial and commercial customers which began tak-ing electric service from the system during the period 1960 to date and provide the kilowatt-hours consumed by each such customer in the full year preceding such determination. [If the kilowatt-hours. data is not provided, describe the efforts used to'obtain it.] [In lieu of this list respondent may limit its list to the system's ten largest customers which initiated service. In making this " largest" determination,
- use the kilowatt-hours consumed by each such customer during
1971, or fiscal year 1972 if such fiscal year ended on or be-fore June 30, 1972.] Also, state the date on which service was initiated to each such customer.
(b) State which of such customers were acquired as a result of relocation inec the service area of the system, from where each came and the utility previously supplying elec-tricity to each such custoscr.
(c) As to each of those customers for which relocation was not involved, state:
(i) the electric utility formerly provid-ing service to each of the customers in question; (ii) the reasons for the change in elec-tric suppliers.
(d) State whether any service drops or other facilities were transferred by the utility formerly providing service to the system as a result of acquiring the new cus-
-tomer. If any transfer of facilities occurred, specify:
(i) the facilities transferred; (ii) the compensation, if any, paid by the system; (iii) the date on which such transfer was made.
(e) Furnish all documents relating to any cus-tomer acquisition and-any facilities transferred in connection
- 1. _
with such acquisition specified in response to subparagraphs (a) and (d) of this Interrogatory.
- 56. Furnish maps or other documents showing present system facilities and of system facilities as of year-end 1960 through 1971 which show the geographic location of power plants, principal suostations, power lines, all connections and trans-fer points with other systems, and the boundary line of the area served together with the communities therein supplied with electric er,ur;y. Such maps or documents should also show the following:
(a) For each line of 12 kilovolts and above (and fcr any other line regardless of voltage which consti-tutes a tie line between generating stations or from generating stations to voltage systems of 12 kilovolts or above) :
(i) the length in miles; (ii) the voltage at which it is operated; (iii) the voltage for which it is insulated if different from the operating voltage, (b) For all alternating current lines:
(i) the number of cycles per second; (ii) the phase (one-phase , two-phase, or three-phase).
(c) The rating and locations of transformer banks at power plants and principal substations including interconnections with other systems.
.m
0 (d) The approximate scale (feet per inch or miles per inch). [In lieu of the foregoing or if the refer-enced documents are not provided, respondent may describe the system's facilities in sufficient detail to include all of the information sought in this request.]
- 57. (a) Furnish copies of each document prepared by or for the system, or on which the syst:em has relied, during the period January 1, 1960 to date which contains any refer-ence to expected future increases in production capability, investment in the system or growth in the system's peak demand, sales, revenues, profits and/or number of customers served.
(b) Describe any studies or other inquiries presently being prepared by or for the system on such matters, and state the name of the person or other entity preparing the same and the expected completion date of such project.
- 59. State the system's net generating capacity ex-4
_ pressed in kilowatts as of year-end (calendar or fiscal) 1960 through 1971.
- 60. State the system's total annual kilowatt-hours generated, exclusive of station use, during each year 1960 through 1971.
- 61. (a) State the system's number of pole miles of transmission facilities and the number of circuit miles of transmission facilities by voltage as of year-end 1960 through 1971.
O
(b) If the basis for classifying such facili-
- ties differs from that used in response to Interrogatory 34:
(i) explain each change made and the reason for each such change; (ii) furnish data in response to subpara-graph (a) of this Interrogatory which are comparable to those provided in response to Interrogatory 34. [In lieu of this subpart, respondent may provide information sufficient to permit Applicant to calculate such comparable data.]
- 62. (a) State the system's number of pole miles of distribution facilities and the number of circult miles of over-head and underground distribution facilities as of year-end 1960 through 1971.
(b) If the basis for classifying such facili-ties differs from that used in response to Interrogatory 35:
(i) Explain each change made and the reason for each such change; (ii) Furnish data in response to subpara-graph (a) of this Interrogatory which are comparable to those provided in response to Interrogatory 35. [In lieu of this subpart, respondent may provide information sufficient to per-mit Applicant to calculate such comparable data.]
63.- (a) State,the system's number and capacity of transmission and distribution substations and transformer in-stalla*. ions with capacity exceeding 12 kilovolts as of year-end 1960 through 1971.
m -
m - j
. = - -
(b) If the basis for classifying such facili-ties differs from that used in response to Interrogatories 34 or'35:
(i) explain each change made and the reason for each such change; (ii) furnish data in response to subpara-graph (a) of this Interrogatory which are comparable to those provided in response to Interrogatories 34 and 35. [In lieu of this subpart, respondent may provide information sufficient to permit Applicant to calculate such comparable data.]
- 64. State whether a franchise has been granted to any supplier of electric service within the corporate limits of or in the area served with electricity by the system. If so, for each such utility franchised to render service, state its name and the area it serves within the corporate limits o
of and-the other area served with electricity by the system. j
- 65. State the extent to which commercial or indus-trial entities within the corporate. limits of the municipality 1
or within (or adjacent to) the area rendered electric service l
by the system presently have, since 1960, been denied the opportunity by the system to (i) change from electric service by the system to service by any other utility, or l (ii) change from electric service by another utility to service by the system.
f
(a) Describe each instance in which an entity was denied the opportunity to so change and the reasons for
- the system's denial; and describe any conditions set forth by the system for, permitting such changes.
(b) State for each year 1960 through 1971:
(i) the number of customers by customer class -(commercial or ' industrial) who changed during each year s
from electric service by another electricity supplier to ser-vice by the system; (ii) the kilowatt-hour sales to such cus-tomers in each year in which service was supplied by the system.
(c) State for each year 1960 through 1971:
(i) the number of customers by customer class (commercial or industrial) who changed during the year from electric service by the system to service by another elec-tricity. supplier; (ii) the kilowatt-hour consumption by such customers supplied by the system in the year uch change occurred and in the five years immediately preceding such char.ge .
- 67. State whether the municipality, or any agency or department thereof, ever declined to provide, or declined f
to seek the opportunity to provide, electric service to any or all customers served by another other electricity supplier
~
in the corporate limits of or in the area served with elec-tricity by the system. If so:
(a) State the name and address of each such customer; (b) Describe each such incident; (c) Furnish each document relating to any such denial of electric service or decision not to seek the oppor-tunity to serve such customer.
- 68. (a) State the name and address of each cus-tomer served at any time during the period January 1, 1960 to date by any other electricity supplier within the corporate limits of or in the area served with electricity by the system which has ever declined to accept an offer of electric service by the system; (b) Describe the circumstances of each such incident and provide the date(s) on which it occurred; (c) Furnish each document relating to each such incident.
- 73. (a) State each source (e.g. , wholesale pur-chase, self-generation) of electric energy utilized by the system in the years 1960 through 1971.*
(b) State for each of the aforementioned years:
(i) the kilowatt-hours obtained from each source;
~~
(ii) the maximum kilowatt demand placed on each source; (iii) the cost of the electricity obtained from each source.
(c) In each case where energy was not system-generated specify any breakdown between capacity, demand, energy'or other charge incurred and indicate the voltage at which each such supply was received.
- 74. State the names, dates of installation, types (e.g. , hydro , diesel, steam) , nameplate capacity, heat rates ,
kilowatt-hours generated, capacity factors, investment costs, depreciation rates, accumulated depreciation, operation and maintenance costs. exclusive of fuel, types of fuel burned and fuel costs of each generating unit purchased, constructed, owned or operated by the system for each of the years 1960 through 1971.
- 75. (a) Furnish copies of each document prepared by or for the system during the period January 1, 1960 to date which related in any way to the relative costs of elec-tricity obtained from different sources (e.g. wholesale pur-chase or self-generation) or with suggested sources of and costs of meeting energy requirements during that time period or in the future.
(b) State whether the municipality or any agency or department thereof, alone or jointly with any other
- utility or entity, presently plans to install additional gen-erating or-transmission capacity. If so, describe in detail:
(i) any such plans; (ii) the stage of their progression; (iii) the name and address of each utility or entity involved in any such plan; (iv) furnish each document relating in any way to the feasibility, desirability, or cost of any such plan.
(c) Describe any present effort being made by or for the system on any of these matters, state the name and address of the person or other entity engaged in such effort and the expected completion date of the project.
- 77. (a) Furnish copies of each document prepared
.by or for the system relating to the technical and/or economic feasibility of constructing generating and/or transmie.aion facilities.
(b) Describe any present effort being made by or for the system relating to any matter described in (a), and state the name and address of the person or other entity en-gaged in such effort and the expected completion date of the project.
- 80. Furnish a copy of any coordinating or integrat-
.ing agreement, contract or understanding for the sale or ex-change of electric power and energy between the system and any
+
. ,. , _ . + ~ . - ~ _ _ _.
other electric utility now in effect, or in effect at any time during the period January 1, 1960 to date. Exclude any such agreement with Consumers Power Company.
8 5. - Is the system now, or has it been at any time during the period January 1, 1960 to date, a member of any bulk power supply coordinating group? If so:
(a) State the name by which the group is known; (b) Name the other members of the group; (c) Indicate the particular coordinating functions of each group; and (d) Furnish all documents relating to each such membership and any document relating to the exclusion of particular electric utilities or classes of such utilities from such groups, including but not limited to communications with other electric utilities with respect to actions, joint or se'reral, to prevent admission of such electric utilities.
- 86. State the number of present employees of the system who-hold an engineering degree of the bachelors level or above; and state the specific degrt i or degrees held by such employees and the number of years each recipient of each degree has.been employed by the system.
1
- , l APPENDIX II (COOPERATIVES)
. ~ , . .
~
Definitions and General Directions
- 1. " Document" means the original, any copy (regard-less of origin), and all drafts of all writings of every kind in the possession, custody or control of the system, including all drafts of correspondence, memoranda, reports, financial re-ports, vouchers and other accounting records, notes, letters, i
telegrams, messages (including reports of telephone conversa-tions and conferences), studies (including, but not limited to, load flow, engineering, general economic and market studies),
analyses, comparisons, books, magazines, newspapers, booklets, circulars, bulletins, notices, instructions, minutes and other communications, including. inter- and intra-office communications, transcripts, purchase orders, questionnaires and surveys, maps, charts, graphs, electrical or gergraphic diagrams including those known in the trade as "one line diagrams", photographs,
-phonograrh or other recordings and other data compilations from which information can be obtained. Only documents dated on or after January 1, 1960 need be produced.
In all cases where documents are requested, legible copies.should be submitted.
Each document produced and response hereto should identify the Interrogatory number (and subparagraph, if any) to which it is responsive and should be arranged =crially l according to such number.
i I
1 i
i f
- 2. " Electric utility" and " utility" means any pri-vate corporation,~ cooperative corporation, municipality, or any political subdivision, agency or instrumentality of the Federal or any state or municipal government which owns or controls facilities for the generation, transmission or dis-tribution of electric power and energy, or which in the past has done so.
- 3. " Coordination" and " coordinating" shall include,
- but are not limited to, reserve sharing, economic dispatch or economic interchange, and pooling of load growth for joint or staggered additions of generating or transmission facilities.
- 4. " Integration" and " integrating" shall mean the coordination or coordinating of bulk power supnly facilities by a single utility or by two or nore utilities twner, or controlled by a common entity or common financial interest.
- 5. " Cooperative" shall mean any entity organized for the purpose of providing generation, transmission or dis-tribution of electric power to persons in rural areas who theretofore had not been receiving central station service.
- 6. The account titles used herein shall be defined as in the Uniform System of Accounts Prescribed for Electric Borrowers of the Rural Electrification Administration (REA Bulletin 181-1).
t
- 7. In all cases where data are requested by years, indicate whe ther the ir. formation is provided on a calendar or
~
~ fiscal year basis. Such basis shall be the usual accounting period used by the system. If data are provided on a fiscal year basis, state the day on which each ' fiscal year ended and provide data through fiscal year 1972 if such fiscal year ended on or before June 30, 1972.
- 8. In the event any document requested in these in-terrogatories is unavailable, specify in detail the reason therefor.
- 9. If any document r quested is available, but is withheld by reason of any assertion of privilege or other claim, describe each such document, including the name, address and position of the persons preparing and receiving it, the form.
of the document, its title (if any) and the matter to which it relates. In addition, provide a brief statement of the grounds on which privilege or other claim is being asserted.
- 10. Answers te Interrogatories referring to docu-ments shall include all documents relating to the time period specified in each of said Interrogatories, whether prepared before, during or after said period. Documents prepared prior
.to January 1, 1960, need not be furnished.
- 11. If any question is inapplicable, so state and provide a brief explanation of'why the Interrogatory is in-applicable.
Interrogatories and Request for Documents
- 6. (a) Furnish copies of all fuel, pur':hased power, materials, commodity, tax, wage or other adjustment clauses found in each rate schedule, tariff, rate contract or agree-ment in effect at any time during the period January 1, 1960 to date.
(b) State the adjustment level applicable on 4
January 1, and June 30 of each year 1960 to 1973 and explain the basis on which each adjustment was determined. [Except for the January 1973 and June 1972 levels, if a particular adjustment level is not available, respondent need not compute it. It must compute, or provide sufficient information to enable Applicant to compute, January 1973 and June 1972 levels.]
- 7. State the effective date and describe the sub-stance of each change made in any rate schedule, tariff, con-tract, agreement or terms and conditions of service at any time during the period January 1, 1960 to date. State the effect on revenues of each change in dollar and percentage terms,-or if such' data is not available, provide a projection of the effect on revenues.
- 9. For each of the dates January 1, 1960, January 1, 1965, January 1, 1970, January 1, 1972, and June 30, 1972, state the typical net monthly bills for electric service employing the assumptions and definitions set forth in Attachment A for
the following customer classification and monthly demand-energy combination (designate the rate schedule used for each calcu-lation and identify any discount or special charge) :
(a) Residential (i) minimum bill and number of kilowatt-hours included; indicate the number of minimum bills rendered in each month of each of these years; (ii) 100 kilowatt-hours; (iii) 250 kilowatt-hours; (iv) 500 kilowatt-hours; (v) 750 kilowatt-hours; (vi) 1,000 kilowatt-hours.
(b) Commercial (i) 3.0 kilowatts-375 kilowatt-hours; (ii) 6.0 kilowatts-750 kilowatt-hours; (iii) 12.0 kilowatts-1,500 kilowatt-hours; (iv) 30.0 kilowatts-6,000 kilowatt-hours; (v) 40.0 kilowatts-10,000 kilowatt-hours.
(c) Industrial (i) 75 kilowatts-15,000 kilowatt-hours; (ii) 75 kilowatts-30,000 kilowatt-hours; (iii) 150 kilowatts-30,000 kilowatt-hours; >
(iv) 150 kilowatts-60,000 kilowatt-hours; (v) 300 kilowatts-60,000 kilowatt-hours; l
(vi) 300 kilowatts-120,000 kilowatt-hours; (vii) 500 kilowatts-100,000 kilowatt-hours; (viii) 500 kilowatts-200,000 kilowatt-hours; (ix) 1,000 kilowatts-200,000 kilowatt-hours; (x) 1,000 kilowatts-400,000 kilowatt-hours; (xi) 2,500 kilowatts-1,000,000 kilowatt-hours; (xii) 5,000 kilowatts-2,000,000 kilowatt-hours.
(In lieu of the foregoing computations, respondent may provide information sufficient to permit Applicant to make such calculations. Such information must include the following:
(1) all rate schedules; (2) the appropriate adjustment levels for each date indicated; and (3) a designation of which rate schedule the intervenor would have used to compute each bill.]
- 10. (a) State for each year 1960 through 1971 the name and address of each customer with a load in excess of 25 kva; if there are less than five such customers in any year, for that year provide the name and address of the five largest cus-tomers supplied by the system.
(b) For each customer named in 10(a) state for each year 1960 through 1971 the following:
(i) kilowatt-hour sales to the customer; (ii) revenues derived from the customer; (iii) the customer's peak demand; (iv) the yearly load factor for the customer;
(v) applicable rate schedules for ser-vice to the customer; (vi) the minimum yearly charge applic-able to the customer; (vii) the voltage at which service was provided to the customer.
- 11. (a) . State the length and voltage of each trans-mission or distribution line running from the bulk power supply delivery point to each of the customers identified in response to Interrogatory 10. Describe each delivery point used.
(b) State separately the cost of constructing each line and the cost and description of each related facility required to deliver power to such customers.
27 (a) State the names and addresses of the sys-tem's ten largest industrial and commercial customers (in terms of annual kilowatt-hour consumption) which ceased taking electric service from the system'during the period 1960 to date. In making this determination, use the kilowatt-hours consumed by each such customer in the full year preceding such termination.
(b) State the reasons, if known, for the loss of each customer specified in response to subparagraph (a) of this Interrogatory, the date service was terminated by the system and the name of each customer's present electric supplier. !
l i
3 (c) State whether any service drops or other facilities were transferred by the system to any other elec-tric supplier as a result of such termination. If so, specify:
(i) the facilities transferred; (ii) the compensation, if any, received by the system for such transfer; (iii) the date on which such transfer was made.
(d) Furnish all documents relating in any way to the loss of each such customer or the facilities trans-ferred in connection with such loss of customer.
- 28. (a) State the names and addresses of the sys-tem's ten largest industrial and commercial customers in terms of annual kilowatt-hour consumption which began taking electric service from the system during the period 1960 to date. (In making this determination, use the kilowatt-hours consumed by each such customer during 1971.) Also state the date on which service was initiated to each such customer.
(b) State which of such customers were acquired as a result of relocation into the service area of the system, from where each came and the name of the utility previously supplying electricity to each such customer.
G. e *
-9' (c) As to each of those customers for which relocation was not involved, state:
(i) the electric utility formerly pro-viding :;rvice to each of the customers in question; (ii) the reasons for the change in elec-tricity suppliers.
(d) State whether any service drops or other facilities were transferred by the utility formerly providing service to the system as a result of acquiring the new cus-tomer. If any transfer of facilities occurred, specify:
(i) the facilities transferred; (ii) the compensation, if any, paid by the system; (iii) the date on which such transfer was made.
(e) Furnish all documents relating to any customer acquisition and any facilities transferred in con-nection with such acquisition specified in response to sub-paragraphs (a) and (d) of this Interrogatory.
- 30. (a) Describe each change in territory served with electricity by the system from January 1, 1960 to date, the classification and number of customers affected and annual kilowatt-hour sales to such customers. [only systems which distribute electricity at retail need respond to this subpart.] ;
l i
l l
1 l
-l'0 -
(b) Furnish each document related to any ter-ritorial gain or loss over the aforementioned time period.
- 36. (a) State whether customers within the area generally rendered electric service by the system presently have, or at any time during the period January 1,1960 to date had, the option of (i) changing from electric service by the system to service by any other utility, or (ii) changing from electric service by another u:ility to service by the system.
(b) State for each year 1960 through 1971:
(i) the number of customers by customer class who changed during each year from electric service by another electricity supplier to service by the systea; (ii) the kilowatt-hour sales to each such customer (or customer class) in each year, or portion thereof, in which service was supplied by the system.
(c) State for each year 1960 through 1971:
(i) the number of customers by customer class who changed during the year from electric' service by the system to_ service by another electricity supplier; (ii) the kilowatt-hour consumption by each customer (or by each such customer class) and supplied by the system in the year such change occurred and in the five years immediately preceding _such change.
v--*
.d-.-W4* an e
_11 6-.
- 39. -(a) State each source of electric energy util-
'ized by the system in the years 1900 through 1971.
(b) State for each of the aforementioned years:
(i) the kilowatt-hours obtained from each source; (ii) the maximum kilowatt demand placed on each source; (iii) the cost of the electricity obtain from each source. -
(c) In each case where energy was not system-generated specify any breakdown between capacity, demand, energy.
or'other charge incurred and indicate the voltage at which each such supply was received.
- 40. State the cost of plant, cost per kilowatt of installed capacity, capacity factors, depreciation rates and accumulated depreciation of each generating unit owned, pur-chased, constructed or operated by the system for each of the years 1960 through 1971.
41 (a) Furnish copies of each document prepared by or for the system during the period January 1, 1960 to date which relate in any way to the relative costs of electricity obtained from different sources or with suggested sources of
> and costs of meeting energy requirements during that time
. period'or in the future. Such sources include, bat are not
' limited to, self-generation and wholesale purchase from Appli-cant.
(b) State.whether the system, alone or jointly with any other utility or entity, presently plans to install
. additional generating or transmission capacity.
If so, de-scribe in detail:
(i) any such plans; (ii) the state of their progression; (iii) the name and address of each utility or entity involved in any such plan; (iv) furnish each document relating in any way to the feasibility, desirability, or cost of any such plan.
(c) Describe any present effort being made by or for the system on any of.these matters, state the name and address of the person or other entity engaged in such effort and-the expected completion date of the project. (only sys-uems which generate electricity need respond to this inter-rogatory.]
- 42. Except for the information and/or data already supplied in response to Interrogatory 41, state the cost per kilowatt-hour, including both estimated capacity and energy costs, for the system's most recent generation and transmis-sion expansion programs and those forecasted as of 1960, 1965, and 1970, for the following ten-year period, or such other or
'l shorter periods as may have been utilized by the system for ;
planning purposes. Include a statement of the estimated (and 1 l
l L
where applicable, the realized) cost of generation and trans-mission programs undertaken or proposed during the production period indicating:
1 (a) For generation and (b) For transmission subdivided by voltage classes, the estimated cost as follows:
(i) investment cost in dollars per kilowatt; (ii) energy cost in mills per kilowatt hour; (iii) investment carrying charges and energy costs in mills per kilowatt hour.
[Only systems which generate electricity need respond to this Interrogatory.]
- 47. Furnish a copy of every request, inquiry or other document submitted to the REA during the period Janu-ary 1, 1960 to date concerning the acquistion of new invest-ment loans from the REA. The documents sought include, but are not limited to, board minutes and resolutions, REA Forms 740c (with all attachments), and correspondence (except in-quiries for forms and transmittal letters not otherwise re-
-sponsive to this or any other demand)).
- 53. (a) Provide all documents prepared by or on behalf of the. system for its customers at any time during the period January 1, 1960 to date which describe proposals for
the design of in plant distribution facilities, substations, I
protective devices, transformers, heating and light systems and the like.
(b) State for each year 1960 through 1971 any charges made by the system for the preparation of such docu-ments.
(c) For each year 1960 through 1971, state the system's expenditures for the preparation of such docu-ments.
- 54. Is the system a member of any electric, power, energy or similar association or organization? If so:
(a) Provide the name and address of each such association or organization and state the year in which the system first became a member of each; (b) State the name and address of any system employee who is or has been an officer or director of each such association or organization during the period January 1, 1960 to date; the title of the position held; the period of time during which such office or directorship was held; and the present position of the employee in the system, or if not now employed by the system, the date on which such employment terminated.
- 56. State the name, address and present position t
. - + , ,
. ~
a.
of each person employed by the system during the period Jan-uary 1, 1960 to date who had or now has managerial responsi- i 1
bility in each of the following areas, or who occupy the fol-lowing positions together with the dates during which each person held the position:
l (a) Marketing; (b) Sales; (c) Accounting; (d) Financial planning; (e) Chief executive officer, Manager or Supervisor; (f) Chief operating officer; (g) Research and development; ;
(h) Engineering.
If any such person is no longer employed by the system, state the date on which such person left the system's employ.
- 59. Is the. system now, or has it been at any time during the period January 1, 1960 to date, a member of any bulk power supply coordinating group? -If so, (a) State the name by which-the group is known; (b) Name the other members in the group; (c) Indicate the particular coordinating functionsaof each group;.and (d) Furnish all documents relating to each r
~' ' -
such membership and any document relating to the exclusion of particular electric utilities from such groups (includ-ing ECAR) , including but not liuited to communications with other electric utilities with respect to actions, joint or several, to prevent admission of such electric utilities.
- 61. State whether any engineering services are provided to the system or its retail customers (if any) by any other supplier of electric power. State the nature and.
cost to the system in 1971 of any such services received. As used herein " engineering services" include the design of in-plant distribution facilities, substations, protective devices, transformers, heat and light systems and the like.
~62. (a) State for each year 1960 to date whether the design and engineering of transmission facilities is per-formed by system employees or by other persons or entities and' state the estimated proportion of such work performed by each group in each year.
(b) If any such services were performed by other parsons or entities, state the name and address of such person or other entity and the dates during which he or it performed such services.
ATTACHMENT A INSTRUCTIONS FOR REPORT'ING TYPICAL NET MONTHLY BILLS FOR ELECTRIC SERVICE AS OF JANUARY l OF THE' YEARS 1960,.1965, 1970 and 1972 and JUNE 30, 1972.
SECTION I. GENERAL INSTRUCTIONS
- 1. . EFFECTIVE DATE. Use rate schedules in effect on January 1 of the years 1960, 1965,1970 and 1972,, and June 30, 1972 for computing bills, A rate schedule is deemed effective on January 1 or June 30 of the year if any energy used on that day could have been billad thereunder. Insert the schedule designation and the date on which the new rate schedule first became effective, l
e 2.
~
NET BILLS. Compute all bills _on.a net basis r_ _. j
' i.e., after prompt payment discounts or before delayed payment .
penalties.
- 3. . MONTHLY BASIS. Compute all bills on a monthly basis. Where rate schedules or any part thereof are quoted on an annual, quarterly, or bimonthly basis, prorate the bills to a monthly basis.
- 4. FUEL ADJUSTMENT. Adjust bills to reflect fuel adjustments, if any, for energy billed on January 1 of each of the stated years, and on June 30 for 1972. Enter the adjustment per kwh, the fuel cost and other pertinent data.
- 5. METER RENTALS. In computing bills include where applicable any charge made for meter rentals if the majority of customers are required to pay such meter rentals, but exclude such charge if the majority of' customers furnish their own meters.
In either case, state in a footnote the amount of the meter rental and whether or not the majority of customers-furnish or rent meters.
I
- 6. LAMP RENEWALS. Compute bills on the assumption that j lamp renewal service is not. included in the rates. When the charge ;
for lamp renewal service cannot be segregated, state in a footnote' !
that such charge is included in.the bills shown.
- 7. SEASONAL RATES. Do not compute bills under seasonal l rates where year-round rates are available. Where year-round I rates are not available, compute bills for all seasons for which there are different rates and state the periods or seasons of the
. year for which each rate is available.
n . .- ,_v -
- 2 ~-
- 8. TAX, PRICE, AND WAGE LEVEL ADJUSTMENTS. The bills furnished are to' reflect the charges actually paid by customers in accordance with' the terms of the rate schedules, rules and
- , regulations, etc. Adjust bills to reflect tax, price and wage level adjustments, if any, for energy billed on January 1 of each of. the stated years, and on June 30 of 1972. Sales taxes are not to be included in computing the bills, but where-the
, revenue collected pursuant to the tax adjustment clause becomes an operating revenue of your system, the bills should reflect such tax adjustment.
- 9. OTHER FACTORS. Show by footnotes any other facts affecting the computations of the bills furnished or the choice o,f the schedules used. Such factors would include rebates, periodic free service and inducement rates.
SECTION II. SPECIAL INSTRUCTIONS FOR RESIDENTIAL SERVICE
- 1. DEFINITION. Residential service is defined as service which is supplied to residential customers for lighting, refrigeration, cooking, water heating, and other domestic uses.
2.. RATE SCHEDULES TO BE USED. Compute each bill using the rate schedule or combination of rate schedules on which the largest group of residential customers was billed for the specified consumption as of January 1 of each of the stated years, and as of June 30 of 19.72.
- 3. DEMAND ASSUMPTIONS. Where charges are based on the number of rooms or measured demand, assume the following
> for computing bills:
(a) Number of rooms - A five-room residence consisting of'living room, dining roo.n, kitchen and two bedrooms.
(b) Measured demand - For 500 kwh consumption assume a measured demand of 4.5 kw. For 750 kwh consumption assume a demand of 5 kw. For 1,000 kwh consumption assume a demand of 5.3 kw.
(c) Water heating - Use demand and size of tank most generally applicable to water heaters using from 250 to 350 kwh per month, and state what demand and/or size of tank is used. -
4
- 4. 1001 ASSUMPTIONS. TWO OR MORE METERS. Where residential service can be taken through more than one meter cand such is the general practice, assume the following:
n, - - - - ----,,---o-. , -,mv
s,w ,
1
. (a) For the 500 kwh bill assume that 250 kwh for lighting, small appliances, refrigeration, and cooking are measured through the general service meter and that 250 kwh for water-heating are measured through the water-heating meter.
(b) For the 750 kwh bill assume that 400 kwh for lighting, appliances , ref.rigeration and cooking are measured through the general service meter and that 350 kwh are measured through the water heating meter. If cooking is metered separately from lighting and water heating, assume 150 kwh for cooking consumption. If refrigeration is not metered with lighting and appliance load, assume 40 kwh for such consumption.
~
(c) For the 1,r10 kwh bill assume that 650 kwh for lighting, appliances, refrigeration and cooking are measured through the general service meter and that 350 kwh are measured through the water-heating meter. If cooking is metered separately.
from lighting and water heating, assume 150 kwh for. cooking consumption. If refrigeration is not metered with lighting and appliance load, assume 40 kwh for s,uch consumption.
(d) In the case of rates providing for special night rates when water heating is used, assume for the 500 kwh bill that 250 kwh are billed at the night rate. For the 750 and 1,000 kwh bills assume that 350 kwh are billed at the night rate.
i I
i
4 .o . .
l SECTION III. SPECIAL INSTRUCTIONS FOR s3MMERCIAL SERVICE
- 1. DEFINITION. Commercial service is defined as ser-vice.which is supplied to commercial or business establishments such an stores, officos, restaurants, and garages for lighting and power purposes.
- 2. RATE SCHEDULES TO BE USED, Use all rate schedules ordinarily applicable to commercial service at the range of con-sumptions and demands given in Interrogatory 7(b). Do not use rate schedules restricted to a special class of enterprise such as department stores, hotels, laundries or apartment houses; nor to a special purpose such as sign lighting, refrigeration, heating, cooking, welding, auxiliary, or temporary service. Industrial schedules specifically limited to manufacturing customers should not be included.
- 3. BILLS TO BE FURNISHED. If but one schedule is applicable to commercial service, a bill is to be furnished under that schedule for every demand-energy combination listed in Interrogator 7 (b) . If more than one schedule is applicable, bills should be shown for each schedule for those demand-energy combinations shown in that interrogatory, which come within the range of demand and/or energy consumptions for which the schedule is, or would be used in actual utility billing practice. Bills outside of this range need not be shown. At least one bill for each demand-energy combination should be furnished.
4
- 4. SCHEDULE USE. When a new schedule is used, state the minimum and maximum demands and consumptions beyond which the schedule is not, or would not be used.
- 5. DIRECT CURRE'NT. Do not compute any bills under schedules for direct-current service only._
- 6. OFF-PEAK SERVICE. Do not compute bills from rates which restrict service to off-peak hours.
- 7. SERVICE VOLTAGE. Compute bills only for energy delivered at secondary voltage (550 volts or less) and metered at such voltage on the secondary side of system-owned trans-former.
- 8. TERM OF CONTRACT. Footnote cases where contract term is over one year.
?&
s.*> .o ,
- 9. DEMAND.
(a) Billing Demand. The kilowatt demands requested are the actual billing demands of a customer after all adjustments, except for power factor, have been made.
(b) Power Factor. Compute all bills for schedules applicable to motive power and incidental or no lighting at 85% lagging power factor. For schedules permitting unrestricted lighting in addition to power, compute bills' for 375, 750, and 1,500 kwh at unity power factor. For the 6,000 and 10,000 kwh bills assume a lagging power factor of 85%-(unless only a small motive power load is permitted, in which case assume unity power factor).
(c) Kilovolt-amperes or Horsepower. For schedules basing charges on kilovolt-amperes or horsepower, assume the following conversions:
BILLING DEMAND W Kva g -
3 3(1) 4 6 6(1) 8 12 12(1) 16 30 35.3 40 40 47 54 (1) For power schedules permitting incidental or no lighting assume 3.5 kva, 7 kva, and 14 kva for 3 kw, 6 kw and 12 kw, respectively.
- 10. TYPE OF SERVICE. Show the application of rate schedules, using the following symbols:
L - lighting, and appliances with or without single phase or incidental power PL - motive power, and incidental lighting GEN - lighting, single or 3-phase power, and other used in any proportion desired P - motive power but no lighting
_r _. . . . ,_ . . _ _ _ - . - _ _ _
- , -- m_ .~.y~ .n.
- .*. 's .;
SECTION IV. SPECIAL INSTRUCTIONS FOR INDUSTRIAL SERVICE
- 1. - DtFINITION. Industrial service is defined as ser-vice which is supplied to. industrial establishments having demands of 50 kw or more, or consumptions of 15,000 kwh or more per month.
- 2. . RATE SCHEDULES TO BE.USED.. Use all rate schedules
. for motive power applicable to industrial service as defined under paragraph 1 of this section. Do not.use rate schedules restricted to commercial es.tablishments or to special classes of enterprise, such as_ cement, mining, oil, or textile industries; or to a special purpose, such as_ auxiliary, breakdown, temporary, or inter-mittent services, industrial heating, or irrigation, or to indus-trial lighting.
- 3. BILLS TO BE FURNISHED. If but one schedule is applicable to industrial service, a bill must be furnished under that schedule for every demand-energy combination listed in Inter-rogatory 7(c). If more than one-schedule is applicable to this class of' service, bills should be furnished for each schedule for those demand-energy combinations shown in that interrogatory, which come within the range of demand and/or energy consumptions,
- for which the schedule is, or would be used in actual system billing practice. Bills outside of this range should be noted.
- 4. SCHEDULE USE. When a now schedule is used, state the minimum and maximum demands and consumptions beyond which the schedule is not, or would not be used.
i 1
- 5. DIRECT CURRENT. Do not compute any bills under schedules for direct-current service only.
4 6. OFF-PEAK SERVICE. Off-peak rates which do not restrict the use of energy'during the normal hours of operation-of industrial conce'rns may be shown. ,
- 7. SERVICE VOLTAGE. -Use all rate schedules applic-able'to industrial service as defined in paragraphs 1 and 2.of this section, regardless of. voltage. Indicate whether the-bills furnished'are for primary metering or for secondary metering,
- and whether'the system or the customer owns the transformer.
When a rate' schedule provides different rates for '
primary and secondary metering compute bills for primary metering only, assuming customer ownership of' transformer. Where the schedule permits, compute bills for 75 kw and 150 kw demands at voltages between 2,200- and 4,000 and bills for 300 kw, 500 kw and.1,000 kw demands at voltages between 11,000 and 13,200.
, otherwise compute bills for the voltage at which service is most generally rendered, and state in a footnote the voltages
~
, used.
1 L=~
. ~ . - - . - . - - .- . .. - - . - - .
= . . , - - .
~s d
l
- 8. TERM OF CONTRACT. If the rate schedule allows a discount to customers contracting for service for a period longer than one year, compute bills based on the longer contract term.
- 9. DEMAND.
(a) Billing Demand. The kilowatt-demands shown in InterrogatoryO7 j (c) are the actual billing demands of a customer after all adjustments, except those for power factor and voltage, have been made.
(b) Power Factor. Compute all bills for motive power at 85% lagging power factor. Note any adjustments.
(c) Kilovolt-amperes or Horsepower. For schedules basing charges on kilovolt-amperes or horsepower assume the following. conversions:
BILLING DEMAND Kw ,
Kva Hy 75 88 100 150 176 200 -
300 353 400 500 588 667 1,000 1,176 1,333
- 10. TYPE OF SERVICE. Show the application of the rate schedules using the following symbols: