ML20211L639

From kanterella
Jump to navigation Jump to search
Affidavit of Gb Staley Re Preparation of Answers to Board 861203 Questions on Termination of OL Proceeding. Certificate of Svc Encl
ML20211L639
Person / Time
Site: Midland
Issue date: 12/11/1986
From: Staley G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20211L620 List:
References
OL, OM, NUDOCS 8612160114
Download: ML20211L639 (4)


Text

_

b UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 4

BEFORE TIIE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

CO!!SUMERS POWER COMPANY

)

Docket Nos. 50-329 OM & OL

)

50-330 OM a OL (Midland Plant, Units 1 and 2)

)

f 3

AFFIDAVIT OF GARY B. STALEY I, Gary B. Staley, being duly sworn, state as follows:

1.

I am employed by the U.S. Nuclear Regulatory Commission as a hydraulic engineer in the Engineering Branch, Division of Pressurized Water Reactors Licensing B.

4 2.

My responsibilities include environmental evaluation related to 4

l license applications.

3.

In that capacity, I visited the Midland site on October 15-16, 1986, and subsequently prepared an " Inspection and Evaluation of the Midland Energy Center for Adequacy of the Stabilization Plan."

This report was distributed to the Licensing Board and the parties to the Op-erating License proceeding on November 14, 1986.

4.

In a Memorandum and Order of December 3,1986, the Licensing Board posed three questions related to the termination of the Operating License proceeding and directed the Staff to answer them as appropriate.

5.

I prepared the Staff's answers to the Licensing Board's questions.

I l

[

8612160114 86 h29 PDR ADOCK O PDR C

I hereby certify that the information provided in the response is true and correct to the best of my knowledge and belief.

M h_0 l'Id, Hydraulic Engineer, PWR[B Gary B. /Staley Subscribed and sworn to before me this /Nf day of December,1986 n%/-g Notary blic gg My commission expires: July 1,1990 l

i l

l l

l l

l l

J

1 D0lbElll!

Mt!PC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 86 DEC 12 P3:05 BEFORE TIIE ATOMIC SAFETY AND LICENSING BOARD

[0C tie t x ' } M -

In the Matter of

)

WM

)

CONSUMERS POWER COMPANY

)

Docket Nos. 50-329 OM & OL

)

50-330 OM & OL (Midland Plant, Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF RESPONSE TO LICENSING BOARD'S QUESTIONS OF DECEMBER 3,1986" in the above-captioned pro-ceeding have been served on the following by deposit in the United States mail, first class, or as indicated by an asterisk through deposit in the Nuclear ReFulato?y Commission's internal mail system, or as indicated by a double asterisk by hand-delivery, this lith day of December, 1986:

Charles Bechhoefer, Esq.

Frank J. Kelley Administrative Judge Attorney General of the State Atomic Safety and Licensing Board Panel of Michigan U.S. Nuclear Regulatory Commission Steward H. Freeman Washington, D.C.

20555 "

Assistant Attorney General Environmental Protection Division Dr. Jerry lIarbour 525 W. Ottawa St., 720 Law Bldg.

Administrative Judge Lansing, Michigan 48913 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Ms. Mary Sinclair Washington, D.C.

20555 "

5711 Summerset Street Midland, Michigan 48640 Gustave A. Linenberger, Jr.

Administrative Judge Atomic Safety and Licensing Monrd Panel Michael I. Miller, Esq.

U.S. Nuc! car Regulatory Commission Isham, Lincoln & Beale Washington, D.C.

20555**

Three First National Plaza 52nd Floor James E. Brunner, Esq.

Chicago, Illinois 60602 Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201

4 Ms. Barbara Stamiris Atomic Safety and Licensing 5795 N. River Board Panel Freeland, Michigan 48623 U.S. Nuclear Regulatory Commission Washington, D.C.

20555**

James R. Kates Atomic Safety and Licensing 203 S. Washington Avenue Appeal Board Panel Saginaw, Michigan 48605 U.S. Nuclear Regulatory Commission Washington, D.C.

20555**

Howard A. Levin, Project Manager TERA Corporation Docketing and Service Section 7101 Wisconsin Ave.

Office of the Secretary Bethesda, Maryland 20814 U.S. Nuclear Regulatory Commission Washington, D.C.

20555*

Wayne Hearn Paul C. Rau Bay City Times Midland Daily News 311 Fifth Street 124 Mcdonald Street Day City, Michigan 48706 Midland, Michigan 48640 Frederick C. Williams Bruce Berson Isham, Lincoln & Beale Regional Counsel 1120 Connecticut Avenue, NW USNRC, Region III t

Washington, DC 20036 799 Roosevelt Road Glen Ellyn, IL 60137*

Myron M. Cherry, P.C.

Billie Pirner Garde Peter Flynn, P.C.

Government Accountability Project Cherry & Flynn Midwest Office Three First National Plaza 4324 Marcos Lane Suite 3700 Appleton, WI 54911 Chicago, IL 60602 T. J. Creswell i

Michigan Division Legal Department Dow Chemical Company Midland, Michigan 48640 l

w

.~~~ IU k

Ann' P. Hodgdon Q

Counsel for NRC Staff

--.