Request for Current Radiological Emergency Response Plan.To Wait for Final Plan to Be Formalized Would Impose Hardship on Intervenor.Plan Required to Determine If Plan Meshes W/ Surrounding Local Plans.Certificate of Svc Encl
ML19345G572
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/24/1981
From: Jeffrey Reed
AFFILIATION NOT ASSIGNED
To:
UNION ELECTRIC CO.
References
INTV-810324, NUDOCS 8104070542
Download: ML19345G572 (3)


Text

a U'JITED STATES CF A! ERICA tJUCLEAR RECULATORY CCl?:ISSICN '

BEFORE THE ATOMIC SAFETY AfiD LICE!;SI::G BOARD /

In the Matter of )

,a ---

UNION ELECTRIC C0FPANY

) {h

,q~ g .gg . _

\ )

Doexet No STil 50-483 ' ' ,~

(Callaway Plant, Unit 1) )

i

~D' REQUEST FOR DOCUI.ENT UNDER THE PROVIS10NS OF (Union Electric Company Emergency Radiological Response Plans for the Callaway Plant) g't;N g i

Request the undersigned be provided a current copy /cy (including,Nr r %

ny/ *'

,j/

" draft" prepared or being prepared) of the radiological em ergeeiqy *'Og G. '

response plan of the Union Electric Company's Callaway g41 v Plant.

7. -gtn:n$, # 5 '

$ s,r D-P DISCUSSICU Because of the potential for reduced time frames in ng the licensi process (see US NRC letter of 13 March 1981 and proposed Exped the NRC Hearing Process (7590-01),

attached thereto. ) and App licant's Pmposed schedule for ihrther actions (submitted to the ASLB , on 24 March 1981, at Jefferson City, Missouri; there is a need . Reed for Mr to determine the potential for interface provisions of the 's p cant Ap li

[

plan at the earliest possible,date.

! To wait until a " final plan" is formalized and submitted for approval will impose a rs definate p ha d hi on the undersigned in meeting ASLB or Commission time fra, ice and response.

for actions i

While such " interim" plans are subject to constant review and change by the Applicant, it is further requested that Mr. Reed be pro v copy ided a of all changes as they occur.

This procedure is similar to that used by the Cornission in formulating its policies.

t 8104070;h N 6a

l o - . '

\

CCNCLUSION -

Since the combined plans of the Appli: ant, the State of Misscuri, and f

the eight impacted local governments (all within the 10 mile EPZ) must

" dove-tail" or interface to meet acceptable standards of the Commission in providing fnt- public health and safaty, an in-dep+h study of these plans must be made by each party involve to eliminate actual or

( pottmtial areas of conflict. This review n:ust be continued throughout the licensing proceeding and afterwards on an ongoing basis for the life-ti=e of the nuclear power plant, if protection of the public health and safety is to be maintained. Because of the time required to read each plan and formulate cenparative judgements regarding interfecing potentials, it is felt that this request is timely and appropriate.

, A request is being prepared for submission tc the appropriate State agency for copies of other plans sich form the necessary triade, pectfully submit 4ed, Dated at Kingdom City,

,/ A L&

' JOHN G. REED Missouri this 24th day Citizen of the United States of March 1981 of Arerica i

8 o

e gm _gew 4 g - - . <hhee e++ H N m hOWw-

e U'lITED STATES OF A! ERICA HUCLEAR P2GULATCRY C0!P.ISSION BEFOPS THE ATOMIC SAFETY AND LICENSIRG BOARD

,_ In the Matter of )

)

UNIQi ELECTRIC C0!PANY ) Dc,cke', Nos STN 50-483

)

(CallawayPlant, Unit 1) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing " Request for Document Under the Provisions of Discovery (U. E. Emergency Radiological Response Plans) were served this A b th day of March, 1981, by deposit in the U.S. mail, first class postage prepaid, upon the following:

James P. Gleason, Esquire l'r. Glenn O. Bright

  • Chairman, Atomic Safety and Atomic Safety and Licensing Board Licensing Board Panel 513 Gilmoure Drive U.S. Nuclear Regulatory Commission Silver Spring, Maryland 20901 Washington, D.C. 20555 Dr. Jerry R. Kline Docketing and Service Section Atomic Safety and Licensing Office of the Secretary Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 '

Washington, D.C. 20555 Roy P. Lessy, Jr., Esquire Kenneth M. Chackes, Esquire Office of the Executive Legal Director Chackes and Hoare U.S. Nuclear Regulatory Commission 314 N. Broadway Washingt.on, D.C. 20555 St. Louis, No. 63102 Treva J. Hearne Thomas A. Baxter, Esquire Assistant General Counsel Shaw, Pittman, Potts & Trowbridge MO. Public Service Commission 1800 -M. Street , N.W. P.O. k 360 Washington, D.C. 20036 Jefferson City, W. 65102 '

Atomic Safety'and Licensing Appeal Board U.S. Nuclear Regulatory Commission

/

_ s- tm f. 9 e--.4 Washington, D.C. 20555 / J W G. REr.D

' Citizen of the United States .