NRC000163 Submitted: August 23, 2012 Federal Register/Vol. 77, No. 149/Thursday, August 2, 2012/Notices 46127 NUCLEAR REGULATORY Document Room (PDR) reference staff at COMMISSION 1-800-397-4209,301-415-4737, orby email to pdr.resource@nrc.gov.The
[NRC-2012-0055] ADAMS accession number for each document referenced in this document Interim Staff Guidance on Changes to (if that document is available in the Generic Aging Lessons Learned ADAMS) is provided the first time that (GALL) Report Revision 2 AMP XI.M41, a document is referenced. The LR-ISG-
"Buried and Underground Piping and 2011-03 is available under ADAMS Tanks" Accession No. ML12138A296.
AGENCY: Nuclear Regulatory
- NRC's PDR: You may examine and Commission. purchase copies of public documents at ACTION: Interim staff guidance; issuance. the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville
SUMMARY
- The U.S. Nuclear Regulatory Pike, Rockville, Maryland 20852.
Commission (NRC) is issuing the final
- NRC's Interim Staff Guidance Web License Renewal Interim Staff Guidance Site: LR-ISG documents are also (LR-ISG), LR-ISG-2011-03, "Changes available online under the "License to GALL Report Revision 2 Aging Renewal" heading at http://
Management Program (AMP) XI.M41, www.nrc.gov/reading-rm/doc-
'Buried and Underground Piping and collections/#int.
Tanks'." This LR-ISG provides changes FOR FURTHER INFORMATION CONTACT:
to the recommendations in GALL Report Mr. William Holston, Division of Revision 2 AMP XI.M41 based on the License Renewal, Office of Nuclear staff's review of several license renewal Reactor Regulation, U.S. Nuclear applications' buried and underground Regulatory Commission, Washington, piping and tanks AMPs and stakeholder DC 20555-0001; telephone: 301-415-input. The LR-ISG revises NRC staff 8573, or email:
recommended AMPs in NUREG-1801, William.Holston@nrc.gov.
Revision 2, "Generic Aging Lessons SUPPLEMENTARY INFORMATION:
Learned (GALL) Report," and the NRC staff's aging management review Background Information procedure and acceptance criteria The NRC issues LR-ISG to contained in NUREG-1800, Revision 2, communicate insights and lessons "Standard Review Plan for Review of learned and to address emergent issues License Renewal Applications for not covered in license renewal guidance Nuclear Power Plants" (SRP-LR). The documents. In this way, the NRC staff NRC published Revision 2 of the SRP- and stakeholders may use the guidance LR and GALL Report in December 2010, in an LR-ISG document until it is and they are available in the NRC's incorporated into a formal license Agencywide Documents Access and renewal guidance document revision.
Management System (ADAMS) under The NRC staff issues LR-ISG in Accession Nos. ML103490041 and accordance with the LR-ISG Process, ML103490036, respectively. Revision 2 (ADAMS Accession No.
ADDRESSES: Please refer to Docket ID ML100920158), for which a notice of NRC-2012-0055 when contacting the availability was published in the NRC about the availability of Federal Register on June 22, 2010 (75 information regarding this document. FR 35510).
You may access information related to The NRC staff developed LR-ISG-this document, which the NRC 2011-03 to (a) Include inspection possesses and are publicly available, recommendations for plants that will using any of the following methods: not utilize a cathodic protection system
- FederalRulemaking Web site: Go to in the period of extended operation, (b) http://www.regulations.govand search remove the recommendation to for Docket ID NRC-2012-0055. Address volumetrically inspect underground questions about NRC dockets to Carol piping to detect internal corrosion since Gallagher; telephone: 301-492-3668; other AMPs such as XI.M 38 manage the email: Carol.Gallagher@nrc.gov. aging of internal surfaces of buried and
- NRC's Agencywide Documents underground piping and tanks, (c) base Access and Management System further increased inspection sample (ADAMS): You may access publicly sizes on an analysis of extent of cause available documents online in the NRC and extent of condition when adverse Library at http://www.nrc.gov/reading- conditions are detected in the initial rm/adams.html. To begin the search, and subsequent doubled sample size select "ADAMS Public Documents" and rather than continuing to double the then select "Begin Web-based ADAMS sample size, (d) add a recommendation Search." For problems with ADAMS, that where damage to the coating is please contact the NRC's Public significant and the damage was caused
46128 Federal Register/Vol. 77, No. 149/Thursday, August 2, 2012/Notices by non-conforming backfill, an extent of The LR-ISG is also not directed to condition evaluation should be licensees who already hold renewed conducted to ensure that the as-left operating or combined licenses.
condition of backfill in the vicinity of Dated at Rockville, Maryland, this 26th day observed damage will not lead to further of July, 2012.
degradation, (e) add specific acceptance For the Nuclear Regulatory Commission.
criteria for cathodic protection surveys, (f) add the specific preventive and Melanie A. Galloway, mitigative actions utilized by the AMP Deputy Director,Division of License Renewal, in the Final Safety Analysis Report Office of NuclearReactorRegulation.
Supplement description of the program [FR Doe. 2012-18862 Filed 8-1-12; 8:45 am]
as contained in the SRP-LR, (g) make BILLING CODE 7590-01-P miscellaneous and editorial changes, and (h) correct an internal conflict between AMP XI.M41 and AMP XI.M36, "External Surfaces Monitoring of Mechanical Components."
On March 9, 2012, (77 FR 14446) the NRC requested public comments on draft LR-ISG-2011-03 (ADAMS Accession No. ML11244A058). By letter dated March 27, 2012, (ADAMS Accession No. ML12089A021), the Nuclear Energy Institute (NEI) requested a 14-day extension to the comment period. The NRC staff granted the NEI's requested as noticed on April 11, 2012 (77 FR 21813) and given that the comment period had closed on April 9, 2012, the comment period was reopened until April 20, 2012.
The NRC received external comments from Mr. Jon Cavello on April 1, 2012 (ADAMS Accession No. ML12094A367),
Mears Group on April 9, 2012 (ADAMS Accession No. ML12103A207), Det Norske Veritas (USA) Inc. on April 13, 2012 (ADAMS Accession No. ML12108A049), and NEI on April 20, 2012 (ADAMS Accession No. ML12114A214). No other external comments were submitted. The NRC considered these comments in developing the final LR-ISG. Detailed responses to the comments can be found in Appendix G of the final LR-ISG.
The final LR-ISG-2011-03 is approved for NRC staff and stakeholder use and will be incorporated into NRC's next formal license renewal guidance document revision.
Backfitting and Issue Finality Issuance of this final LR-ISG does not constitute backfitting as defined in 10 CFR 50.109 (the Backfit Rule) and is not otherwise inconsistent with the issue finality provisions in Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants," of 10 CFR. As discussed in the "Backfitting Discussion" section of final LR-ISG-2011-03, the LR-ISG is directed to holders of operating licenses or combined licenses who are currently in the license renewal process. The LR-ISG is not directed to holders of operating licenses or combined licenses until they apply for license renewal.