ML14345A640

From kanterella
Revision as of 17:05, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Units 1 & 2 and ISFSI - Response to NRC Request for Additional Information Regarding Review and Approval of NSPM QATR
ML14345A640
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 12/11/2014
From: Murphy M
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14345A638 List:
References
L-XE-14-023, TAC MF5120, TAC MF5121, TAC MF5122
Download: ML14345A640 (3)


Text

414 Nicollet Mall - MP4 Minneapolis, MN 55401 December 11, 2014 L-XE-14-023 10 CFR 50.54(a)(4)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282 and 50-306 Renewed License No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 Response to NRC Request for Additional Information Regarding Review and Approval of NSPM QATR (TAC Nos. MF5120, MF5121, and MF5122)

References:

1) Letter from NSPM to Document Control Desk, Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report, dated October 31, 2014 (ADAMS Accession No. ML14304A353).
2) Letter from NSPM to Document Control Desk, Supplement to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report, dated November 12, 2014 (ADAMS Accession No. ML14316A595).
3) E-mail from NRC to NSPM, Northern States Power Company - Minnesota (NSPM) - Draft Requests for Additional Information Regarding Review and Approval of NSPM QATR (TAC Nos. MF5120, MF5121, and MF5122), dated December 2, 2014 (ADAMS Accession No. ML14337A787).

By letter dated October 31, 2014, (Reference 1) as supplemented by letter dated November 12, 2014, (Reference 2) Northern States Power Company, a Minnesota corporation (NSPM),

d/b/a Xcel Energy, submitted proposed changes to its Quality Assurance Topical Report

Document Control Desk Page 2 (QATR) for NRC review and approval in accordance with 10 CFR 50.54(a)(4). The proposed changes would revise previously submitted requirements related to the conduct of independent assessments, in that the independent assessment function of the Nuclear Oversight organization would be divided into two distinct functions: independent audits and independent assessments.

Subsequently, by e-mail dated December 2, 2014, the NRC provided draft Requests for Additional Information (RAis) requesting further information required to complete its review (Reference 3). A teleconference between NRC and NSPM personnel was held on December 3, 2014, to discuss the RAis, during which NSPM agreed to respond to the draft RAis as written.

The formal response to the RAis is provided in Enclosure 1 to this letter. During the development of the enclosed RAI response, NSPM determined it was necessary to revise the QATR to reflect a 90-day general grace period for audits as described in Regulatory Guide 1.28 Revision 4, "Quality Assurance Program Criteria (Design and Construction)." As such, NSPM-1 Revision 8b, "Quality Assurance Topical Report," is included in Enclosure 2. contains a red line/strikeout version of NSPM-1 Revision 8b reflecting changes from Revision 7 of the QATR. Enclosure 4 contains a Table documenting all changes and the basis that the QATR, as revised, continues to satisfy the requirements of 10 CFR 50 Appendix B. Enclosure 5 contains a redline/strikeout version of NSPM-1 Revision 8b reflecting changes made from Revision 8a.

Enclosures 2 and 4 supersede Enclosures 1 and 2 of Reference 1, respectively. Enclosure 3 supersedes the Enclosure of Reference 2. Enclosure 5 is provided for information, and to aid in the review of this submittal as it highlights only the changes made between the version of the QATR submitted with Reference 1, and the QATR submitted with this letter.

If you have any questions or require additional information, please contact Mr. Shane Jurek at (612) 330-5788.

Summary of Commitments This letter makes no new regulatory commitments and no revisions to existing regulatory commitments.

Director- Nuclear Licensing and Regulatory Affairs Northern States Power Company-Minnesota Enclosures (5)

Document Control Desk Page 3 cc: Administrator, USNRC, Region III USNRC NRR Project Manager, PINGP USNRC Senior Resident Inspector, PINGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP