Regulatory Conference with Diablo Canyon Nuclear Power Plant
ML14363A554
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/29/2014
From:
Division of Nuclear Materials Safety IV
To:
Haire M
References
EA-14-010
Download: ML14363A554 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 December 29, 2015

SUBJECT:

REGULATORY CONFERENCE WITH DIABLO CANYON NUCLEAR POWER PLANT FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2 DOCKET: 50-275 and 50-323 EA: 14-010 DATE & TIME: Wednesday, January 14, 2015 1:00 p.m. - 4:00 p.m. (CST)

LOCATION: U.S. Nuclear Regulatory Commission Region IV Office Conference Room 2 1600 E Lamar Blvd.

Arlington, TX 76011 PURPOSE: The purpose of this regulatory conference is to discuss an apparent violation identified at Diablo Canyon Nuclear Power Plant concerning the failure to obtain prior approval for an emergency plan change which decreased the effectiveness of the emergency plan. The apparent violation is discussed in NRC Inspection Report 05000275; 05000323/2014502 dated December 1, 2014 (ADAMS ML14335A774).

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion but before the meeting is adjourned, the public will have one or more opportunities to communicate with the Nuclear Regulatory Commission.

A telecommunications bridge will be available for the public. Interested parties should call 1 888-469-0950 and enter passcode 34924 to participate in this meeting.

Diablo Canyon Nuclear Power Plant PARTICIPANTS: NRC M. Dapas, Regional Administrator, Region IV J. Clark, Deputy Director, Division of Reactor Safety T. Pruett, Director (Acting), Division of Reactor Projects W. Walker, Chief, Branch A, Division of Reactor Projects M. Haire, Chief, Plant Support Branch 1, Division of Reactor Safety R. Kahler, Chief, Inspection & Regulatory Improvements Branch, NSIR V. Campbell, Chief, Allegation Coordination and Enforcement Staff C. Maier, Enforcement Specialist, ACES P. Elkmann, Senior Emergency Preparedness Inspector G. Guerra, Emergency Preparedness Inspector LICENSEE B. Allen, Site Vice President M. Ginn, Manager, Emergency Planning T. Baldwin, Director, Site Services D. Evans, Director, Emergency Services MEETING CONTACT: Gilbert Guerra, NRC, RIV (817) 200-1557 Gilbert.Guerra@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/reading-rm/adams.html.

Enclosure:

Agenda cc w/enclosure: Electronic List Service

ML14363A554 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: MSH Yes No Non-Publicly Available Sensitive OFFICE PSI:PSB1 SES:ACES C:PSB1 RSLO PAO D:DRS NAME GGuerra:PBH VCampbell MHaire BMaier VDricks JClark SIGNATURE /RA/MSH for /RA/ MCM for /RA/ /RA/ /RA/ LMU for /RA/

DATE 12/18/14 12/23/14 12/18/14 12/23/14 12/23/14 12/29/14 Meeting Notice to the Public from Region IV dated December 29, 2014

SUBJECT:

REGULATORY CONFERENCE WITH DIABLO CANYON NUCLEAR POWER PLANT Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Jason.Kozal@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Siva.lingam@nrc.gov)

R4DRS-BC R4DRP-BCandSPE Senior Emergency Preparedness Inspector/PSB1 (Paul.Elkmann@nrc.gov)

Emergency Preparedness Inspector/PSB1 (Gilbert.Guerra@nrc.gov)

Resident Inspector/DRP/A (Rayomand.Kumana@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

Senior Enforcement Specialist (John.Wray@nrc.gov)

Chief, IRIB (Robert.Kahler@nrc.gov)

Director, OE (Patricia.Holahan@nrc.gov)

OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)

RIV Guards (R4-Guards@nrc.gov)

Branch Chief, DRMA/AMB (Earnestine.Clay@nrc.gov)

Branch Chief, DRMA/IRMB (Harold.McKelvey@nrc.gov)

DRMA/AMB Administrative Specialist (AnnMarie Matilla@nrc.gov)

Support Services Assistant (Stacey.Munroe@nrc.gov)

Administrative Assistant (Anita.Tannenbaum@nrc.gov)

Administrative Assistant (Jenny.Murray@nrc.gov)

Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

AGENDA REGULATORY CONFERENCE DIABLO CANYON NUCLEAR POWER PLANT January 14, 2015 1 p.m. - 4 p.m. (CST)

U.S. NRC, Region IV Office Arlington, TX Topic Participant(s)

Introduction Gilbert Guerra Regional Administrator Comments Marc Dapas Barry Allen, Site Vice President Licensee Opening Remarks Diablo Canyon Summary of Apparent Violation Gilbert Guerra Licensee Presentation Diablo Canyon Questions and Discussion All NRC Caucus All NRC Questions and Discussion All Closing Remarks Marc Dapas/Jeff Clark Conference Adjournment Gilbert Guerra Enclosure