ML15146A339

From kanterella
Revision as of 11:30, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review for EAL Scheme Change
ML15146A339
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/26/2015
From: Ed Miller
Plant Licensing Branch II
To: Murphy G
Duke Energy Corp
References
Download: ML15146A339 (2)


Text

NRR-PMDAPEm Resource From: Miller, Ed Sent: Tuesday, May 26, 2015 1:21 PM To: 'Murphy, George M (George.Murphy2@duke-energy.com)'

Subject:

Acceptance review for EAL Scheme Change

George, By letter dated May 7, 2015 (Agencywide Documents Access and Management System Accession No. ML15141A047, Duke Energy Carolinas, LLC (Duke Energy) requested approval of an amendment to modify their Emergency Action Level Scheme for McGuire. Specifically, the proposed amendment would adopt NEI 99-01, Revision 6, Development of Emergence Action Levels for Non-Passive Reactors, dated November 2012.

The purpose of this e-mail is to provide you with the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plants.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and protection of public health and safety and the environment.

If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me at (301) 415-2481.

G. Edward Miller Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 2106 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CA01904C6E819E)

Subject:

Acceptance review for EAL Scheme Change Sent Date: 5/26/2015 1:20:51 PM Received Date: 5/26/2015 1:20:00 PM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"'Murphy, George M (George.Murphy2@duke-energy.com)'" <George.Murphy2@duke-energy.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1740 5/26/2015 1:20:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: