Proposed Revision to Tech Spec Table 4.1-1,Item 31,changing Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency
ML18139B774
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B773 List:
References
NUDOCS 8203050235
Download: ML18139B774 (1)


Text

-*------- ------ --------- ---- ----

8203050235 820224 PDR ADQCI,( 05000280 p PDR

. - -*-- -- TABLE 4.1-1 CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS

25. Turbine First Stage Pressure s R M
26. Emergency Plan Radiati~n Instr._ *M R M
27. Environmental Radiation Monitors *M N.A. N.A. TLD Dosimeters
28. Logic Channel Testing N.A. N.A. M
29. Turbine Overspeed Protection N.A. R R Trip Chann_el (Electrical)
30. Turbine Tr:l.p Setpoint ~.A. R R Stop valve closure or low EH fluid pressure
  • i
31. Seismic Instrumentation M R M
32. Reactor Trip Breaker N.A. N.A. M
33. Reactor Coolant Pressure (Low) N.A. R N.A.
34. Auxiliary Feedwater
a. Steam Generator Water s R M Level Low-Low s
b. RCP Undervoltage R M
c. S.I. - (All Safety Injection surveillance requirements)
d. Station Blackout N.A. R N.A.
e. Main Feedwater Pump Trip N.A. N.A. R S - Each shift M - Monthly*

D - Daily P - Prior to each startup if not done previous week W.- Weekly R - Each Refueling Shutdown NA - Not applicable BW - Every two weeks SA - Semiannually AP - After each startup if not done previous week Q - Every 90 effective full power days - . 1

  • See Specification 4.lD