Proposed Revision to Tech Spec Table 4.1-1,Item 31,changing Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency
ML18139B774
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B773 List:
References
NUDOCS 8203050235
Download: ML18139B774 (1)


Text

-*-------

8203050235 820224 PDR p

25.
26.
27.
28.
29.
30.
31.
32.
33.
34.

ADQCI,( 05000280 PDR CHANNEL DESCRIPTION Turbine First Stage Pressure Emergency Plan Radiati~n Instr._

Environmental Radiation Monitors Logic Channel Testing Turbine Overspeed Protection Trip Chann_el (Electrical)

Turbine Tr:l.p Setpoint Seismic Instrumentation Reactor Trip Breaker Reactor Coolant Pressure (Low)

Auxiliary Feedwater

a.

Steam Generator Water Level Low-Low

b.

RCP Undervoltage TABLE 4.1-1 CHECK CALIBRATE TEST s

R M

  • M R

M

  • M N.A.

N.A.

N.A.

N.A.

M N.A.

R R

~.A.

R R

M R

M N.A.

N.A.

M N.A.

R N.A.

s R

M s

R M

c.

S.I.

- (All Safety Injection surveillance requirements)

d.

Station Blackout N.A.

N.A.

R N.A.

e.

Main Feedwater Pump Trip S - Each shift D - Daily W.- Weekly NA - Not applicable SA - Semiannually M - Monthly*

P - Prior to each startup if not done previous week R - Each Refueling Shutdown BW - Every two weeks AP - After each startup if not done previous week Q - Every 90 effective full power days 1

  • See Specification 4.lD N.A.

R REMARKS TLD Dosimeters Stop valve closure or low EH fluid pressure

  • i

-,