ML18139B774
| ML18139B774 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 02/24/1982 |
| From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML18139B773 | List: |
| References | |
| NUDOCS 8203050235 | |
| Download: ML18139B774 (1) | |
Text
-*-------
8203050235 820224 PDR p
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
- 31.
- 32.
- 33.
- 34.
ADQCI,( 05000280 PDR CHANNEL DESCRIPTION Turbine First Stage Pressure Emergency Plan Radiati~n Instr._
Environmental Radiation Monitors Logic Channel Testing Turbine Overspeed Protection Trip Chann_el (Electrical)
Turbine Tr:l.p Setpoint Seismic Instrumentation Reactor Trip Breaker Reactor Coolant Pressure (Low)
- a.
Steam Generator Water Level Low-Low
- b.
RCP Undervoltage TABLE 4.1-1 CHECK CALIBRATE TEST s
R M
- M R
M
- M N.A.
N.A.
N.A.
N.A.
M N.A.
R R
~.A.
R R
M R
M N.A.
N.A.
M N.A.
R N.A.
s R
M s
R M
- c.
S.I.
- (All Safety Injection surveillance requirements)
- d.
Station Blackout N.A.
N.A.
R N.A.
- e.
Main Feedwater Pump Trip S - Each shift D - Daily W.- Weekly NA - Not applicable SA - Semiannually M - Monthly*
P - Prior to each startup if not done previous week R - Each Refueling Shutdown BW - Every two weeks AP - After each startup if not done previous week Q - Every 90 effective full power days 1
- See Specification 4.lD N.A.
R REMARKS TLD Dosimeters Stop valve closure or low EH fluid pressure
- i
-,