Application to Amend Licenses DPR-32 & DPR-37,revising Tech Spec Table 4.1-1,Item 31 to Change Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency.W/Class I & II License Fees
ML18139B772
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139B773 List:
References
094, 94, NUDOCS 8203050229
Download: ML18139B772 (3)


Text

e VIRGINIA. ELECTRIC AND POWER COMPA.NY RICHMOND,., VIRGINIA 2 3 2 61 R.H.LEASBURO VJ:CE PRESXDEN'.l:

February 24, 1982 NUCLEAll 0PERA'.l:XONS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Serial No. 094 NO/GSS:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 & 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10CFR50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 &

2.

The proposed changes are enclosed.

The proposed change is to revise Table 4.1-1, calibration for seismic instrumentation from a frequency.

Item 31, to change channel semi-annual to a refueling It is impractiable to test instrumentation at* power.

ANSI-ANS 2.2 (1978)

  • recommends a refueling frequency for channel calibration.

Also, this is in agreement with the guidance provided in the Standard Review Plan.

The level of integrity and the function of the system is not changed by performing the channel calibration during refueling operations.

The probability of occurrence or the consequences of an accident or malfunction* of equipment important to safety is not increased since the system is still proven to be operational by the monthly functional tests and checks.

The channel calibration only ensures that the system responds within a specified range and accuracy.

The required margin of safety is not reduced because the system is proven to be operable by the monthly Periodic Test program.

The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this request does not involve an unreviewed safety question.

We have evaluated this request in accordance with the criteria in 10CFR170.22 and it has been determined that a class I and II license amendment fee is required.

A voµcher check in the amount of $1,600. is enclosed in payment of the required f~~}*.

8203050229 820224 PDR ADOCK 05000280 P

PDR Very truly yours, R.H. Leasburg

e VIRGINIA ELECTRIC AND POWER COMPANY TO Harold R. Denton Attachments:

1.

Proposed Technical Specification change.

2.

Voucher Check No. 9719 for $1,600.

cc:

Mr. James P. O'Reilly, Regional Administrator Office of Inspection and Enforcement Region II

. ~-

r

?,

1;;

~

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)

e The foregoing document was acknowledged_ befor~. me, _ in and for the City and _____ _

Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this t:2. 'I-el.. day of ~

, 19 P.;,,..

My Commission expires: -----~;;;...;_--.....;...~_, ___, 19 ~ ~-

  • Notary Public (SEAL)