ML18139B915

From kanterella
Revision as of 00:56, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application to Amend Licenses DPR-32 & DPR-37,supplementing 820316 Submittal,Changing Tech Specs & to Reflect Reorganization in QA Dept & Addition of Director-Emergency Planning
ML18139B915
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/28/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139B916 List:
References
255, NUDOCS 8207060141
Download: ML18139B915 (2)


Text

- - -------------

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 R. H. LEASBURG June 28, 1982 VICE PRESIDENT NUCLEAll OPERATIONS Mr. Harold R. Denton, Director Serial No. 255 Office of Nuclear Reactor Regulation NO/GSS:acm Attn: Mr. Steven A. Varga, Chief Docket Nos. 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos. DPR-32 U. S. Nuclear Regulatory Commission DPR-37 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROP_OSED TECHNICAL SPECIFICATION CHANGE By the letter dated March 16, 1982, we proposed changes to the Technical Specifications for Surry Power Station, Unit Nos. 1 and 2 to reflect the recent reorganization in the Nuclear Operations Department. The proposed changes enclosed supplement our above referenced license amendment application.

The enclosed changes reflect the recent reorganization in the Quality Assurance Department and the addition of Director-Emergency Planning to the Nuclear Operations Department. These changes are to enhance the Quality Assurance program and the Emergency Planning, Preparedness and Response program of the company.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.

We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request supplements our previous license amendment application referenced above, no additional license amendment fee is required.

Attachments: Proposed Technical Specification Change cc: Mr. James P. O'Reilly Regional Administrator Region II

-8207060141 820628 PDR_ADOCK 05000280

-P PPR-*

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.. H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

-:cf)_

Acknowledged before me this ~ '/ day of

-~->-.,,,-:-'_- _ , 19 r.,;)....

My Commission expires:


, 19 Notary Public (SEAL)