Application for Amend to Licenses DPR-32 & DPR-37,adding Tech Spec 4.17c to Revise Schedule for Functional Testing of 50 Kips & Above Category Snubbers.Class III & I Amend Fees Encl
ML18139C265
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/08/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139C266 List:
References
116, NUDOCS 8303150399
Download: ML18139C265 (2)


Text

.. . '

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L' STEWART V:rcE P:aESIDENT NucLEAll OPEilATJ:ONS March 8, 1983 Mr. Harold R. Denton, Director Serial No. 116 Office of Nuclear Reactor Regulation NO/WDC:acm Attn: Mr. Steven A. Varga, Chief Docket No. 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos. DPR-32 U. S. Nuclear Regulatory Commission DPR-37 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. The proposed change is enclosed.

This proposed change adds to Specification 4.17.C to revise the schedule for functional testing of the 50 kips and above category snubbers. In the event of failure during testing, an engineering evaluation would be done to determine the failure mode. The functional testing of the 50 kips and above category snubber is rescheduled when the engineering evaluation determines the failure mode to be non-generic. The proposed Technical Specification change is enclosed in Attachment 1. A discussion of the proposed change is in Attachment 2.

This request has been reviewed and approved by the Surry Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59.

We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request involves a safety issue which the staff should be able to determine does not involve a significant hazards consideration for Unit 1 and a duplicate safety issue for Unit 2, a Class III license amendment fee and a Class I license amendment fee are required for Unit 1 and Unit 2, respectively. A check in the amount of $4,400 is enclosed in payment of the required fees.

Very truly yours, W. L. Stewart 8303150399 830308 PDR ADOCK 05000280 p PDR

e VIRGINIA ELECTRIC AND PowER CoMPANY To Harold R. Denton Attachments:

1. Proposed Technical Specification Change
2. Discussion of Proposed Technical Specification Change
3. Voucher Check No. 1309072 for $4,400 cc: Mr. James P. O'Reilly Regional Administrator Region II

_ __.J