MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARAEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-43, Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval2021-07-21021 July 2021 Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval AEP-NRC-2021-16, Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2021-02-25025 February 2021 Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2021-18, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2021-02-18018 February 2021 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-50, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-07-0909 July 2020 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2019-56, Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic2019-11-0404 November 2019 Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic AEP-NRC-2019-32, Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 22019-08-22022 August 2019 Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 2 AEP-NRC-2019-40, Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 02019-07-30030 July 2019 Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 0 AEP-NRC-2018-81, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-11-27027 November 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping AEP-NRC-2018-82, Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination2018-11-20020 November 2018 Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination AEP-NRC-2018-64, Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-09-27027 September 2018 Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML18334A2722018-09-18018 September 2018 LTR-SDA-II-18-41-NP, Revision 1, Responses to NRC Questions on the Expanded Scope Leak-Before-Break Evaluations for D.C. Cook, Units 1 and 2. AEP-NRC-2018-45, Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report2018-08-0909 August 2018 Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 AEP-NRC-2018-23, Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-04-11011 April 2018 Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML18092A0842018-03-28028 March 2018 Donald C. Cook Nuclear Plant Unit 2, Response to Request for Additional Information Regarding Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program ML17346A7662017-12-0808 December 2017 Enclosures 2 & 3 to AEP-NRC-2017-56 - Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels and EAL Technical Basis Manual AEP-NRC-2017-56, Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels2017-12-0808 December 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels AEP-NRC-2017-30, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations2017-05-26026 May 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations AEP-NRC-2017-16, Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding2017-05-11011 May 2017 Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding AEP-NRC-2017-09, Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program2017-02-27027 February 2017 Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program AEP-NRC-2016-81, Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ...2016-11-0303 November 2016 Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ... AEP-NRC-2016-80, Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-10-31031 October 2016 Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools AEP-NRC-2016-79, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-10-12012 October 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident AEP-NRC-2016-69, Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force.2016-09-0909 September 2016 Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force. AEP-NRC-2016-56, Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-07-12012 July 2016 Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-54, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 582016-06-16016 June 2016 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 58 AEP-NRC-2016-48, Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control...2016-06-16016 June 2016 Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control... ML16169A1152016-05-0606 May 2016 Donald C. Cook Nuclear Plant Units 1 and 2 - Response to Sixth Request for Additional Information the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-24, Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-02-19019 February 2016 Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-14, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2016-01-21021 January 2016 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation AEP-NRC-2015-11, Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-12-17017 December 2015 Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term ML15323A4332015-11-16016 November 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions. ML15323A4342015-11-16016 November 2015 Response (Part 1) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-99, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.152015-10-30030 October 2015 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.15 AEP-NRC-2015-98, Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-10-30030 October 2015 Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. AEP-NRC-2015-86, Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions.2015-09-18018 September 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions. AEP-NRC-2015-80, Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-28028 August 2015 Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-75, Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-24024 August 2015 Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-88, Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements2015-08-24024 August 2015 Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements AEP-NRC-2015-69, Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-08-0606 August 2015 Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program ML15223A4362015-07-28028 July 2015 PWROG-15066-NP, Revision 0, Responses to Follow-Up NRC RAI 2 on the DC Cook Units 1 and 2 Reactor Internals Aging Management Program. AEP-NRC-2015-63, Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection2015-07-17017 July 2015 Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection AEP-NRC-2015-64, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-07-17017 July 2015 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term 2024-08-15
[Table view] |
Text
AMERICAN ELECTRIC POMfER iSQI'Vi CQ COI'POI'RLIOll 2 llroa<hoa~g, h'oui )'orf', F. K f0004 (2I2J i/22 -4800 IIOIII,"IIT S. IIUIfTFII Virr Prrsidrnt.Ãvclcar Enyirrrriny August 26, 1976 Donald C. Cook Nuclear Plant Docket No. 50-315 DPB No. g8 U.S. Nuclear Regulatory Commission.
Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: M . . G. e e D ect Gentlemen:
Item 6 of IE Bulletin 75-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility, to assure that con-sideration for alternate methods -for accomplishing an orderly plant shutdo>In and cooldown are provided in case of loss of normal and preferred alternate shutdovn and cooldorfn systems at the Donald C. Cook Nuclear Plant. Our letter to you dated t'une 27, 1975 provided this schedule.
In addition, Item 6 requests summary reports detailing our monthly progress. This letter is the fourteenth such monthly report.
The I ocal Shut'dovn Instrumentation panels for local monitoring of critical parameters in the event of an unlikely loss of control from the control room vere scheduled. to be shipped to the Cook Nuclear Plant site before the end of August. Hovever, after completing assembly of the panels, the fabricator's tests indicated an electrical fault in each of the panels. The fault vas subsequently found to be
'efective terminal blocks.
Spare terminal blocks vere available from stock at the Cook Nuclear Plant and the required type and number have been sent to the fabricator.
AUG 3O
4 c
P Mr. J. G. Kepplex ugust 26, 1976 Following refitting of the blocks and satisfactory completion of retesting, the panels will be-shipped to the site.
Delivery is expected in early. September.
Very truly yours, R. S. Hunter Vice President-Nuclear Engineering RSH:main cc: G.'Charnoff R. C. Callen P. N. Steketee R. Nalsh R. M. Jurgensen - Bridgman D.D. Comey John Tillinghast
~ A l l
@4 - I qtl e
C .'
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III CENTRAL FILES 799 ROOSEVELT ROAD GLEN ELLYNs ILLINOIS 60137 AUG 17 ~o7"-
Am'er'iclec'tric'*Power'ervice Docket'o, 50-315 Co'r'p oration Docket No; 50-316 Indiana and M.chigan Power'ompany
,ATTN: 1fr; John E.- Dolan, Executive Vice Pr'esident Engineer'ing and Const'ruct'ion',
Br'oIadway Nei7'ork; Nevi York 10004
~,
Gentlemeri The3'e'nclosed Circular, 76-02'is forrmrded to you for information and action. This is the second'issue of an expanded system for communica-tion from the Office of Inspection and Enforcement to applicants and licensees,'to supplement the .issuance of IE Bulletins.
Il Bulletins have been, and will'ontinue to be, limited to sub)acts con-sidered to be of appropriate significance to require prompt response.
Circulars will cover sub5ects, of lesser significance, immediacy or for
, whicli a longer response time, appears appropriate. Puture IE Circulars may be iddressed to .any class of NRC licensees, and may or may not require response, IV Sincerely, James G. Keppler Regional Director
"'Y
Enclosure:
IE 'Circular 76-02 cc w/encl:
R. Q. Jurgensen, Plant Superintendent bcc'/encl: S
- 'Central Piles IE Piles PDR Local PDR Ronild Calleri, 14Kchigan Public Service Commission m 'avid "Dismore, Comey, Citizens for Better'Environment
'~r6 i9<E'
I>>
4 V>A
,J
August 17, 1976 IE Circular No. 76-02 RELAY FAILURES-WESTINGHOUSE BF (ac) AND BFD (dc) RELAYS DESCRIPTION OF CIRCUMSTANCES:
During testing of Westinghouse BFD relays, the Point Beach nuclear power plant experienced malfunctions with two relays in the reactor trip system.
The malfunctions were caused by the pin that connects the plunger to the operating head rubbing against the contact block. Although the coils were fully energized the relay contacts remained in the deenergized position.
A similar malfunction occurred in one of a set of relays undergoing accelerated aging tests at the Westinghouse Beaver facility.
The malfunction relating to pin misalignment may be common to both BF (ac) and BFD (dc) relays. Portions of a Westinghouse service letter containing information about these relays are attached to this circular.
Further instructions regarding this relay problem can be obtained from Westinghouse Nuclear Service Division, Pittsburgh, Pennsylvania 15230.
ACTION TO BE TAKEN BY LICENSEES AND PERMIT HOLDERS:
The following actions should be taken with respect to all Westinghouse BF (ac) and BFD (dc) relays in safety related systems:
- 1. Describe the action taken or that you plan to take to verify that normally energized relays in safety related systems are in fact operable and that the relay contacts are in the energized position.
- 2. Describe the action taken or that you plan to take to verify that normally deenergized relays in safety related systems operate properly when energized and that the relay contacts are in the energized position.
Reports for facilities with operating licenses should be submitted within 60 days after receipt of this circular, and reports for facilities with construction permits should be submitted within 90 days after receipt of this circular. Your report should include the date when the above actions were or will be completed.
Reports should be submitted to the Director of the NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement Division of Reactor Inspection Programs, Washington, D. C. 20555.
Approval of NRC requirements for reports concerning possible generic problems has'been obtained under 44 U.S.C 3152 from the U. S. General Accounting Office. (GAO Approval B-180255 (R0072), expires 7/31/77)
Attachment:
Extract from Westinghouse Service Letter:
BF (ac) and BFD (dc) Relays
EXTRACT FROM WESTINGHOUSE SERVICE LETTER:
BF & BFD RELAYS During the testing of certain Westinghouse BFD relays at an operating nuclear power plant, two relays in the reactor trip system were found to have malfunctions. Although the coils were fully energized, the relay contacts remained in the deenergized position. It was determined that, in both cases, the pin that connects the plunger to the operating head was rubbing against the contact block. This rubbing action resulted in friction that impeded the plunger movement when the relay coil was energized thereby preventing contact movement. The malfunctioning relays were immediately replaced. When dissassembled it was found that the relays would operate normally when the pin was centered in the plunger.
Coincidently, Westinghouse (Beaver) the relay manufacturer, experienced a similar malfunction in one of a set of similar relays which are currently ungergoing accelerated aging tests.
Westinghouse (Beaver) and Westinghouse (NES) are currently investigating this situation in detail as it applies to both BF (ac) and BFD (dc) models. Con-sideration is being given to various means by which the pin could be held cap-tive, thereby precluding further pin misalignment, if such. a course of action becomes necessary.
RECOMMENDED ACTION Visually inspect normally energized relays to verify that such relays are in fact picked up. Observe the performance of normally deenergized relays during normal periodic testing.
4 UNITED STATES CENTRIIL FI( ES NUCLEAR REGULATORY COMMISSION REGION III 799 ROOSEVELT ROAD GLEN ELI YN, ILLINOIS 60I37 July 28, 19?6 American El'ectric Power Sexvice Docket Ho; 50 315 Corporation ATTN: lfr;
Indisne end 1Kchigsa Power ColQpany Dolan, Executive Vice Pres'ident Engineerins end Constru'chion 2 Brosdway New York; Nev York 10004 Ciktl~)
The en'cia'sed Bulletin',- Ho; 76-07 is'o@iar'led to you fo'" information end iction'. 'A similar documiat -entitl'ed'Circulir'o. 76-01, is being trans'mitted to each holder of e"-Construction'Permit. Therefore, if'you have a'uclear power'pplsnt in the'on'structian'stoge, you will also receivecopy af Circulex;. No. 'N-'01 which'Q.X require s'eps'rate response'c'ou wQ1 noth'hat; th'e'significant difference be@a.ea'he two documents is the time II ella'or response, ead Enforcement Bulletins have beea and wi11 continue I'nspection to bi'l.imited to sub)'ects considered to'be af significance snd which require prompt. reiponse. 'Xa the-future, Bulletins will be supplemented- by Circulers es e coimunicatioa medium where the eub)ect matter is af lesser sisnificsacaq immediacy, or for which s longer response time ox no response may be acceptable.
Sincexely, James C. Keppler Regional Director Enclasure! bcc w/encl:
XE Bulletin No. '16-07 Central Files IE Files cc v/encl: PDR R. Q. Jurgensea, Plant Local PDR Sup eriatend eat Ronald Callen, Mic1d.san Public Service Commission p~TIOy R. J. Vollan, Businessmen for g4 the Public Interest OGC, Beth, P-506A O III ~
Reproduction Unit NRC 20b ff C
7~la-c9'I~
A t
4
July 28, 1976 IE Bulletin No. 76-07 CRANE HOIST CONTROL CIRCUIT MODIFICATIONS DESCRIPTION OP CIRCUMSTANCES:
In response to NRC concerns about the potential for, and consequences of, dropping a spent fuel shipping cask or other heavy load, Commonwealth Edison modified the 'hoist
'control system for the fuel cask handling cranes at their Dresden Units 2 and 3 and Quad-Cities Units 1 and 2 to provide additional hoist redundancy and slow speed hoist capability. The original design utilized a General Electric "magspeed" hoist control system. In this system which
~
includes two electro-mechanical brakes in series, spring force holds the brakes engaged while DC solenoids, energized when the hoist: motor is energized, disengage the brakes.
The modification which added the slow speed hoist capability included insta11ing additional contactors in the brake solenoid power circuit to energize the solenoids when the low speed hoist motor was energized.
The original hoist control system design utilized a single Size 2 DC contactor (two contacts in series) in the solenoid ~ ~
circuit. The design modification added a circuit in parallel with the original DC contactor which utilized four AC rated Size 1 single contacts in a series-parallel array to distribute current carrying and interrupting burden.
Initial experience. with the modified hoist control system at Dresden showed that the circuit interrupting capacity of the series-paxallel array was marginal. On several occasions when the low apeed motor was stopped in the lowering mode, the solenoid circuit contacts arced resulting in power being supplied to the .solenoids long enough so that the load dropped some distance before the brakes engaged. Over travel of as much as 15 inches was reported, but no damage to hoist or load was found.
The crane manufacturer's representatives have advised the NRC that the proposed corrective action is to install a single Size 2 DC contactor (two contacts in series) with arc suppressors, the same as originally provided in the General Electric design, in place of the added four AC rated contacts.
The original contactor in the normal speed control circuit has shown satisfactory service since initial operation of the plant in 1969.
0 IE Bulletin No. 76-07 July 28, 1976 ACTION TO BE TAKEN BY LICENSEE:
- 1. Determine and report to this office within 20 days the following information:
~
(a) -
Have you made, or do you plan to make modifications to the hoist control for your installed c'ranes similar to the described modifications?
(b) If such modifications have been made, or are planned, identify changes required in brake power and control circuitry?
(c) What steps have been taken or are planned, to provide assurance that brake power contactors are adequate for the service?
- 2. If modifications are planned, provide the schedule for completion and a brief description of your-plans for design review and functional testing.
Your response should be submitted to the Director of this Office,- with a copy to the Director, Division of Reactor Inspection Programs, Office of Inspection. and Enforcement, U. S. Nuclear Regulatory Commission, Washington, D. C.
20555.
Approval of NRC requirements for reports concerning possible generic problems has been obtained under 44 U. S. C. 3152 from the U. S. General Accounting Office. (GAO Approval B-180255 (R0072), expires 7/31/77).