MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 ML20078P8251995-02-10010 February 1995 Proposed Tech Specs 2.10 to Relocate Requirements for Incore Instrumentation Sys ML20077S1691995-01-0909 January 1995 Proposed Tech Specs,Reflecting Deletion of Requirements for Toxic Gas Monitoring Sys ML20078G8981994-11-11011 November 1994 Proposed Tech Specs 5.2 & 5.5,reflecting Administrative Changes ML20024J3921994-10-0707 October 1994 Proposed Tech Specs,Deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 to Reflect Changes ML20069H9261994-06-0606 June 1994 Proposed Tech Specs Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rcps ML20069D8451994-05-25025 May 1994 Proposed Tech Specs Requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4211993-12-28028 December 1993 Proposed TS Tables 3-1 & 3-2 Re Min Frequencies for Checks, Calibrs & Testing of RPS & Min Frequencies for Checks, Calibrs & Testing of ESFs & Instrumentation & Controls, Respectively LIC-93-0228, Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys1993-08-20020 August 1993 Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys ML20045H1791993-07-12012 July 1993 Proposed TS 2.14,Table 2-1,Item 6.b Re ESF Sys Initiation, Degraded Voltage Setting Limits LIC-93-0159, Proposed Tech Specs Incorporating Administrative Changes1993-06-17017 June 1993 Proposed Tech Specs Incorporating Administrative Changes ML20128E5341993-02-0808 February 1993 Proposed Tech Specs Deleting Section 5.9.4 Re Radioactive Effluent Release Rept.Draft Chemistry Manual Procedure Encl ML20128C0461993-02-0101 February 1993 Proposed TS Figures 2-1A & 2-1B Re pressure-temp Limits for Heatup & Cooldown,Respectively 1999-05-26
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] |
Text
. _ -. . . . _ . - - . .. - . . . . _... .._._. -.
f ATTACHMENT A -
i l
l' i
9001310414 900124 PDR ADOCK 05000285 P PDC 6
w ._ - g *, , ,
gi,' &j- c
' m'-T" !
SURVEILLANCE REQUIREMENTS 4
h h' 3.0.1 Each surveillance requirement shall be performed within the specified time interval with
- a. a maximum allowable extension not to exceed 25% of the surveillance interval, and i i
- b. the combined time interval for any three consecutive j :
surveillance intervals shall not exceed 3.25 times the L specified surveillance interval. !
! 1 3.0.2 The surveillance intervals are defined as follows: .l ;
Notation Title Frequency S Shift At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> D Daily At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i W Weekly At least once per 7 days BW Biweekly At least once per 14 days M Monthly At least once per 31 days- : ,
Q Quarterly At least once per 92 days ;
SA Semiannual At least once per 184 days A Annua lly At least once per 366 days '
R Refueling At least once per plant operating cycle i P Start up . Prior to Reactor Start up -if not completed in the previous week.
Exception to these intervals are stated in the individual ;
Specifications. !
i 3.0.3 The provisions of Specifications 3.0.1 and 3.0.2 are applicable to all codes and standards referenced within the Technical Specifications. The requirements of the Technical Epecifications shall have precedence over the requirements of the codes and .
standards referenced within the Technical Specifications. I
3.0.4 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specifications 3.0.1 and 3.0.2, shall constitute noncompliance with the OPERABILITY requirements for the corresponding Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is ;
identified that a Surveillance Requirement has not been performed. I The ACTION requirements may be delayed for.up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. '
Surveillance Requirements do not have to be performed on inoperable-equipment. !
3-0a Amendment No.122 '
t e 'y
[ , 45mT"
.0 SURVEILLANCE REQUIREMENTS 4 b BASIS '
Specifications 3.0.1 through 3.0.4 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal Reculations,10CFR50.36(c)(3): ,
"Surve111ar.ce requirements are requirements relating to test, i calibration, or inspection to ensure that the necessary quality !
of systems and components it maintained, that facility operation [
will be within safety limits, and that the limiting condition of l ,
operation will be met." ;
I Specification 3.0.1 estab~lished the' con'ditions under which the specifieo time interval for Surveillance Requirements may be extended. Item a. l permits an allowable extension of the normal surveillance interval to !
facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities. Item b. limits the use of the provisions of item a. to ,
ensure that it is not used repeatedly to extend the surveillance :
interval beyond that specified. The limits of Specification 3.0.1 are '
based on engineering judgement and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. These provisions are sufficient to ensure that the reliability demonstrated through actual surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
, The provisions of Specification 3.0.2 define the surveill'ance intervals for use in the Technical Specifications. This clarification is .
provided to ensure consistency in surveillance intervals thrcughout l the Technical Specifications. A few surveillance requirements-have
, unccmmon intervals, for example, Table 3-9 requires sampling of fish l once per season. In such a case the surveillance interval shall be '
performed as defined by the individual specifications.
- Specification 3.0.3 extends the testing interval required by codes ;
and standards referenced by the Technical Specifications. This (
clarification is provided to remove any ambiguities relative to the i i frequencies for performing the required inservice inspection and: i testing activities. Under the terms of this specification, the more restrictive requirements of the Technical Specifications take ,
precedence over the codes and stendards referenced therein.
l Specification 3.0.4 establishes the failure to perform a Survei~11ance-l Requirement within the allowed surveillance interval, as defined by
! the provisions of Specifications 3.0.1 ano 3.0.2, as a condition that constitutes a failure to meet the OPERABILITY requirements for the corresponding Limiting Condition for Operation. Under the provisions ;
l 3-Ob Amendment No. 122 L
. ~ .
3.0 SURVEILLANCE RE0VIREMENTS 3.0.1. Each surveillance requirement shall be performed within the specified '
surveillance interval with a maximum allowable extension not to exceed 25 percent of the surveillance interval.
3.0.2 The surveillance intervals are defined as follows:
Notation Title Freauency S Shift At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> D Daily At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> W Weekly At least once per 7 days l BW Biweekly At least once per 14 days M Monthly At least once per 31 days Q Quarterly At least once per 92 days SA Semiannual At least once per 184 days A Annually At least once per 366 days R Refueling At least once per plant operating cycle P Startup Prior to Reactor Startup, if not completed in the previous week.
Exception to these intervals are stated in the individual Specifications.
3.0.3 The provisions of Specifications 3.0.1 and 3.0.2 are applicable to all codes and standards referenced within the Technical Specifications.
The requirements of the Technical Specifications shall have precedence over the requirements of the codes and standards referenced within the Technical Specifications.
3.0.4 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specifications 3.0.1 and 3.0.2, shall -
constitute noncompliance with the OPERABILITY requirements for the corresponding Limiting Condition for Operation. The time limits of the l ACTION requirements are applicable at the time it is identified that a l
Surveillance Requirement has not been performed. The ACTION'
requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage' time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performed on inoperable equipment.
1 3-0a Amendment No. JEJ
4 3.0 SURVEILLANCE RE0VIREMENTS BASIS Specifications 3.0.1 through 3.0.4 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal ,
Requirements, 10 CFR 50.36(c)(3):
" Surveillance requirements are requirements relating to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting condition of operation will be met."
Specification 3.0.1 establishes the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g.,
transient conditions or other ongoing surveillance or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refueling ;
outage and are specified with an 18-month surveillance interval. It is not intended that'this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillance that are not performed during refueling outages. The limitation of Specification 3.0.1 is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance_ with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
The provisions of Specification 3.0.2 define the surveillance intervals for use in the Technical Specifications. This clarification is provided to ensure consistency in surveillance intervals throughout the Technical Specifications. A few surveillance' requirements have uncommon intervals, for example, Table 3-9 requires sampling of fish once per season. In such-a case the surveillance interval shall be performed as defined by the individual specifications.
Specification 3.0.3 extends the testing interval required by codes and standards referenced by the Technical' Specifications. This ,
clarification is provided to remove any ambiguities relative to the frequencies'for performing the required inservice inspection and testing activities. Under the terms of this specification, the more restrictive requirements of the Technical Specifications take precedence over the codes and standards referenced therein.
Specification 3.0.4 establishes the failure to perform a Surveillance Requirement within the allowed surveillance interval, as defined by the provisions of Specifications 3.0.1 and 3.0.2, as a condition that constitutes a failure to meet the OPERABILITY requirements for the corresponding Limiting Condition for Operation. Under the provisions 3-Ob Amendment No. JJJ
-- ,a e a w.
k i
0
@ f 0
?
l f
i fP e
P
)
I 9
P ATTACHMENT B ,
I i
i 4
)
1 i i
I 5
)
P I
L.
-n .
r-
?
DESCRIPTION, JUSTIFICATION AND NO SIGNIFICANT HAZARDS CONSIDERATION Description of amendment request:
The proposed amendment requests deletion of the 3.25 surveillance limit from the Technical Specification 3.0.1 as recommended in the NRC Generic letter 89-14, August 21, 1989. Presently, Specification 3.0.1 allows 1.25 and 3.25 extension on all surveillance test performances. The 3.25 factor limits extending surveillances so that the combined time interval for any three surveillances will not exceed 3,25 times the specified interval. The intent of the 3.25 limit is to preclude routine use of the provision for extending a surveillance interval by 25 percent. OPPD accepts the NRC staff considerations and conclusion that removal of the 3.25 factor will have an overall positive impact on safety when applied to fort Calhoun Station.
Basis for No Significant Hazards Consideration:
The proposed change does not involve significant hazards consideration because the operation of fort Calhoun Station in accordance with this amendment would not:
- 1. involve a significant increase in the probability or consequence of an accident previously evaluated. The 25 percent extension has been evaluated as a reasonable time limit to facilitate the scheduling of surveillance activities and allow surveillances to be postponed when plant conditions are not suitable for conducting a surveillance. The 25 percent is maintained by the 1.25 limit and will not significantly increase the probability or consequences of an accident.
- 2. create the possibility of a new or different kind of accident from any previously analyzed. The proposed change does not alter the Updated Safety Analysis Report in which the accidents-were previously analyzed and will not create the possibility of a new or different kind of accidents.
- 3. involve a significant reduction in a margin of safety. The surveillance intervals in determining operability of the plant equipment / systems are not changed and deletion of 3.25 limit will not reduce the margin of safety.
Therefore, based on the above considerations, Omaha Public Power District has determined that the proposed change does not involve significant hazards, em : m -, a