MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21141A0482021-05-18018 May 2021 5/18/2021 E-mail Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21103A0532021-04-13013 April 2021 NRR E-mail Capture - Millstone Unit No. 3 - Acceptance Review Determination: Request for Alternative Frequency to Supplemental Valve Position Indication Verification Testing Requirement ML21084A0042021-03-25025 March 2021 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements 2024-02-01
[Table view] |
Text
Mabchlneider - Re: Millstone Alert Pg From: David Silk To: Jamie Benjamin; Max Schneider; Paul Krohn; Silas Kennedy Date: 4/18/05 12:05PM
Subject:
Re: Millstone Alert Upon closer investigation, BA2 isapplicable and therefore the Alert was appropriate. I was mistaken in that I thought that the barrier table reference (3rd page of the EALs) fed into BA2. BA2 is a stand alone EAL. This particular event (steam break outside of containment) is usually not a classifiable event at other sites which have the NUMARC EAL. I apologize for the confusion.
>>> Max Schneider 04/18/05 11:24AM >>>>
What revision of the Millstone EALs are you looking at? I have Rev 001-03 dated 11/26/03. Inthis EAL the words, 'unisolable steam line break outside containment', appear in the barrier failure column under Steam Line Break (BA2).
I agree that this review (what EAL was entered, why, etc), will be part of a follow-up NRC inspection effort (likely a SIT). Its probably best if you provide your insights to this team when it is established. Ifthey decide not to do a SIT, then the residents can follow-up your concerns with the licensee.
Thanks, Max.
>>> David Silk 04/18/05 11:08AM>>>>
- 1) There is no phrase "unisolable steam line break outside containment" in their EALs.
2)The only time a nonisolable steam break plays Into the EALs is when it is concurrent with a SGTR or SGTL.
- 3) If they did meet the criteria for a Containment barrier breach, then according to their flow/logic path it would only be an Unusual Event (Delta-one).
I left a message with the EP manager (Patti Luckey) to get their take on how they were scoring this declaration in Pi-space and how they thought the declaration process went in general. I did not indicate that I was questioning their call so as not to interfere with their "critique" process.
>>> Max Schneider 04/18/05 10:21 AM >>>>
Basis?
>>> David Silk 04/18/05 09:33AM >>>>
Thanks for the info. However, based upon my assessment of the facts and their EALs, it appears that the Alert declaration was unfounded.
>>>> Max Schneider 04/18/05 09:20AM >>>>
Dave, The declaration was from the Unit 3 EAL table under Barrier Failure for Steam Line Break (BA2) for an unisolable steam line break outside containment. The SM declared this at 0842 (event initiated at 0829) when a 'B" MSSV did not reclose after lifting (it also apparently lifted about 40# below its setpoint).
Max.
>>> David Silk 04/18/05 09:14AM>>>>
I just found out about the event this morning. While reviewing the event notification and listening to the info at the morning meeting, I do not understand the basis for the Alert declaration. The stated reason by
Ma- Schneider- Re: Millstone Alert , . ME, Page 2 -1
.; _ , .
the licensee in the EN was that there was a failure on at least one MSSV to reclose. There is no such EAL criteria in their scheme (Rev 31, 12/04). Aside from a judgement call, I find no reason for making any emergency declaration due to a se6ondary steam release.
I have not seen or heard of a specific EAL number ascribed to the Alert declaration. Has anyone heard of one? Thanks.
CC: Felicia Hinson; Nancy McNamara; Neil Perry; Raymond Lorson; Wayne Lanning