MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: William Raymond To: lampert Date: 8/12/05 4:52PM
Subject:
Re: Regarding Event Number 41799 EMERGENCY DIESEL GENERATORS INOPERABLE DUE TO HIGH AMBIENT TEMPERATURE.
- Mary, This replies to your emails dated June 29 and July 1 regarding NRC Event Notification 41799 for Pilgrim Station. As you know, Pilgrim operators declared the plant emergency diesel generators (EDGs) inoperable for a brief period on June 26 when ambient temperature went above 95 degrees F (95F), a limit identified in plant procedures. As you may know, Entergy contacted the NRC on August 12 to retract the June 26 report after further review determined the EDGs remained operable. The NRC reviewed this issue to understand the reasons for the June 26 report and the bases for Entergy's determination that the EDGs remained capable of supplying power in the event that offsite power was lost.
The report on June 26 was made based on temperature data that was higher than the actual conditions at the diesels. As indicated in your July 1 email, weather conditions can vary locally.
The June 26 report was made based on temperatures read at the station meteorological tower at a location (elevation) much higher than the diesels and farther inland from the bay.
Temperatures near grade level at the diesel building intake, which were more representative of the air cooling the diesels, were lower by several degrees than reported at the meteorological tower. Subsequent review showed that the ambient temperatures at the diesels remained below the procedure limit. Additionally, the June 26 report was made based on temperatures that were not engine operability limits. The procedure limits were conservative relative to the actual temperatures that impact diesel operability. Plant design information shows the EDGs are operable at temperatures above that which occurred on June 26.
The plant electrical distribution system is described in Section 8 of the Final Safety Analysis Report (FSAR) and has redundant sources of power. The preferred electrical power is supplied from offsite sources, which includes two independent lines from the 345KV system and a third line from the 23 KV system. Should the offsite supplies become unavailable, either one of the two EDGs could provide adequate power to cool the reactor. Should both EDGs become unavailable, the station blackout diesel generator (SBODG) could provide adequate power to cool the reactor. As described in FSAR Section 2.3, the extreme maximum temperature for Plymouth is 102F, which is the highest temperature on record and was recorded in 1949 (source: the Weather Channel). Plant design information shows the EDGs are operable at a temperature of 102F, and the SBODG is designed to operate at ambient conditions above the site extreme maximum temperature. Finally, should the electrical systems not be operable as required by the plant technical specifications, Entergy would be required to shut down the plant.
In summary, the EDGs have been operable for the ambient conditions experienced at the site, and margins exist between the EDG operability limits and the site average high temperature conditions. Further, the EDGs would be operable for extreme ambient temperatures that could occur very infrequently.
I trust this is responsive to your request. Please accept my apology for this belated response and do not hesitate to contact me should you have any further questions.
Sincerely, Bill
>>> "lampert" <lampert@adelphia.net> 06/29/05 2:39 PM >>>
June 29, 2005
Bill Raymond NRC Resident Inspector, Pilgrim NPS Bill:
Regarding Event Number 41799 EMERGENCY DIESEL GENERATORS INOPERABLE DUE TO HIGH AMBIENT TEMPERATURE.
The report stated that, EDGs were declared inoperable due to indicated outside air temperature exceeding the established operability limit of 95F for two short periods of time.
We understand that nuclear reactors need electricity to operate their safety systems. If offsite power loss occurs at the same time that temperatures exceed 95 then there is no power and we are in trouble. I hope a terrorist would not put two and two together. And, I hope further that very hot temperatures, above 95 degrees, do not result in overloading the grid, a black-out and EDG malfunctioning.
Hence I have the following questions and am asking them as Chair of the Town of Duxburys Nuclear Advisory Committee.
- 1. Over the past 10 years, how many days have exceeded 95 degrees? Please provide the dates.
- 2. Due to projected climate change and its impact on local temperatures, how many days does the NRC project per year to exceed 95 degrees? When were these projections made?
- 3. How long has the Licensee been aware that EDGs are inoperable due to high ambient temperature?
- 4. How long has the NRC been aware that EDGs are inoperable due to high ambient temperature?
- 5. Have EDGs been tested to determine if inoperable due to low ambient temperature?
If Yes 1.. When were the tests conducted?
2.. What is the low ambient temperature at which EDGs become inoperable?
3.. Over the past 10 years, how many days have exceeded that low ambient temperature?
Please provide the dates.
4.. Due to projected climate change and its impact on local temperatures, how many days does the NRC project per year to exceed that low ambient temperature? When were these projections made?
6.. What is the backup put in place post 6/26/05 to assure power will be available in the event of offsite power loss?
Thank-you for your prompt attention; and, Bill I do appreciate that you try to do a very good job.
Mary Lampert 148 Washington Street, Duxbury 02332 Tel 781-934-0389
_______________________________________________________
Event Number: 41799 Power Reactor Facility: PILGRIM Region: 1 State: MA Notification Date: 06/26/2005 Notification Time: 15:30 [ET]
Event Date: 06/26/2005 Event Time: 10:55 [EDT]
Last Update Date: 06/26/2005 Emergency Class: NON EMERGENCY Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode 1 N Y 100 Power Operation 100 Power Operation Event Text EMERGENCY DIESEL GENERATORS INOPERABLE DUE TO HIGH AMBIENT TEMPERATURE "The report is being made in accordance with 10 CFR 50.72(b)(3) due to both Emergency Diesel Generators (EDGs) being declared inoperable.
[This is a 24-hour LCO.] The EDGs were declared inoperable due to indicated outside air temperature exceeding the established operability limit of 95F for two short periods of time. Indicated outside air temperature went above 95F during the following time frames: 10:55 to 11:00 and 12:15 to 12:20. Indicated outside air temperature subsequently decreased to less than 95F following these spikes. Both EDGs are currently operable. Outside ambient temperatures re continuing to be monitored. Offsite power is available.
"Further evaluation of this event is ongoing." The licensee notified the NRC Resident Inspector.
CC: Cliff Anderson
Mail Envelope Properties (42FD0C08.5E5 : 8 : 55812)
Subject:
Re: Regarding Event Number 41799 EMERGENCY DIESEL GENERATORS INOPERABLE DUE TO HIGH AMBIENT TEMPERATURE.
Creation Date: 8/12/05 4:52PM From: William Raymond Created By: WJR@nrc.gov Recipients adelphia.net lampert (lampert) nrc.gov kp1_po.KP_DO CJA CC (Cliff Anderson)
Post Office Route adelphia.net kp1_po.KP_DO nrc.gov Files Size Date & Time MESSAGE 10718 08/12/05 04:52PM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard