ML053140371

From kanterella
Revision as of 04:37, 8 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Assignments of NRC PM and Branch Chief as a Result of Reorganization of NRR
ML053140371
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/09/2005
From: Terao D
NRC/NRR/ADRO/DORL/LPLG
To: Hinnenkamp P
Entergy Operations
vaidya B, NRR/DLPM, 415-3308
References
Download: ML053140371 (3)


Text

November 9, 2005 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 RE: ASSIGNMENTS OF NUCLEAR REGULATORY COMMISSION PROJECT MANAGER (PM) AND BRANCH CHIEF AS A RESULT OF REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION

Dear Mr. Hinnenkamp:

The Office of Nuclear Reactor Regulation (NRR) is being reorganized to support anticipated new reactor licensing, risk-informed regulation, and generally improve the effectiveness and efficiency of NRR's programs and processes. The new organization became effective on October 31, 2005.

The former five large divisions in NRR have been expanded into nine smaller divisions. Each division is headed by a division director and one or two deputy division directors. The former Division of Licensing Project Management is now designated as the Division of Operating Reactor Licensing (DORL) and will focus primarily on licensing activities. Generic and programmatic issues are now managed by the Division of Policy and Rulemaking. In the new DORL, the former first-line supervisors, Section Chiefs, are re-designated as Branch Chiefs.

In the new DORL, the Licensing PM for your facility is Mr. Bhalchandra Vaidya. Mr. Vaidya may be contacted at (301) 415-3308 or via email at bkv@nrc.gov. I am the assigned Branch Chief for your facility and may be contacted at (301) 415-3317 or via email at dxt@nrc.gov.

Sincerely,

/RA by J.Donohew for/

David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page

November 9, 2005 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 RE: ASSIGNMENTS OF NUCLEAR REGULATORY COMMISSION PROJECT MANAGER (PM) AND BRANCH CHIEF AS A RESULT OF REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION

Dear Mr. Hinnenkamp:

The Office of Nuclear Reactor Regulation (NRR) is being reorganized to support anticipated new reactor licensing, risk-informed regulation, and generally improve the effectiveness and efficiency of NRR's programs and processes. The new organization became effective on October 31, 2005.

The former five large divisions in NRR have been expanded into nine smaller divisions. Each division is headed by a division director and one or two deputy division directors. The former Division of Licensing Project Management is now designated as the Division of Operating Reactor Licensing (DORL) and will focus primarily on licensing activities. Generic and programmatic issues are now managed by the Division of Policy and Rulemaking. In the new DORL, the former first-line supervisors, Section Chiefs, are re-designated as Branch Chiefs.

In the new DORL, the Licensing PM for your facility is Mr. Bhalchandra Vaidya. Mr. Vaidya may be contacted at (301) 415-3308 or via email at bkv@nrc.gov. I am the assigned Branch Chief for your facility and may be contacted at (301) 415-3317 or via email at dxt@nrc.gov.

Sincerely,

/RA by J.Donohew for/

David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:

PUBLIC LPLIV r/f RidsOgcRp JDyer/WBorchardt BBoger LBerry RidsNrrDlpmLpdiv1 (DTerao) RidsNrrPMBBenney RidsAcrsAcnwMailCenter RidsNrrPMBVaidya RidsNrrPMNKalyanam RidsNrrLADJohnson RidsRgn4MailCenter (KKennedy) RidsNrrLALFeizollahi ADAMS Accession Number: ML053140371 OFFICE NRR/LPLIV/PM NRR/LPLIV/LA NRR/LPLIV/BC NAME BVaidya LFeizollahi JDonohew for DTerao DATE 11/9/05 11/9/05 11/9/05 OFFICIAL RECORD COPY

River Bend Station cc:

Winston & Strawn General Manager - Plant Operations 1700 K Street, N.W. Entergy Operations, Inc.

Washington, DC 20006-3817 River Bend Station 5485 US Highway 61N Manager - Licensing St. Francisville, LA 70775 Entergy Operations, Inc.

River Bend Station Director - Nuclear Safety 5485 US Highway 61N Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station 5485 US Highway 61N Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

President of West Feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Brian Almon Public Utility Commission Ms. H. Anne Plettinger William B. Travis Building 3456 Villa Rose Drive P. O. Box 13326 Baton Rouge, LA 70806 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 May 2005