Category:Meeting Briefing Package/Handouts
MONTHYEARML24040A0722024-02-13013 February 2024 Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15327A0812015-11-0909 November 2015 Fall 2015 Outage Call Regarding the Steam Generator Tube Inservice Inspections - Slides ML15238B6272015-08-26026 August 2015 Case Study Overview ML14300A5452014-10-30030 October 2014 10/30/2014, Meeting Slide with NRC Regarding GL 2004-02 Close Out for Three Mile Island, Unit 1 ML13262A1492013-09-19019 September 2013 Enclosure 3- NRC Presentation Handout ML13262A1172013-08-28028 August 2013 Enclosure 4 - Scott Portzline Presentation ML12262A3352012-09-13013 September 2012 9.13.2012 TMI Alert Presentation Nreg 0654 Public Mtg ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML12262A4762012-02-22022 February 2012 TMI Alert Portzline Presentation NUREG-0654 Public Mtg ML1202501052012-01-25025 January 2012 Licensee Slides for 1/26/12 Meeting Three Mile Island, Unit 1 - Summary of Tube to Tube Wear Identified During T1R19 (Fall 2011) ML1115901302011-06-0808 June 2011 NRC Slides - TMI Public Meeting, June 7, 2011 ML11090A0872011-04-0505 April 2011 Fire (a)(4) Tabletop Pilot Method and Results ML1007802632010-01-25025 January 2010 Presentation - Health Physics Society Mid-Year Meeting ML1007805052009-12-23023 December 2009 Executive Team Daily Brief ML1007805442009-12-0202 December 2009 Executive Team Daily Brief ML1007805412009-11-27027 November 2009 Executive Team Daily Brief ML1007805402009-11-25025 November 2009 Executive Team Daily Brief ML1007805062009-11-24024 November 2009 Executive Team Daily Brief ML0929406112009-11-0202 November 2009 Summary of Category 1 Public Meeting with Exelon to Discuss Proposed Control Rod Drive Control System License Amendment Request ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0910702242009-04-17017 April 2009 Riv Regional Administrator Presentation at Texas A&M University March 30, 2009, Three Mile Island - Impact on Safety Perspectives and Safety Belief ML0907508342009-03-16016 March 2009 Meeting Slides, Three Mile Island Annual Assessment Meeting 2008 Reactor Oversight Process ML0906302662009-02-24024 February 2009 02/24/2009 Three Mile Island Nuclear Station, Unit 1, Dseis Meeting Presentation Slides Preliminary Results of the Three Mile Island Nuclear Station, Unit 1 License Renewal Environmental Review. ML0906302652009-02-24024 February 2009 Dseis Meeting Handouts ML0826712092008-09-23023 September 2008 TMI Pre-Application Meeting - Control Rod Drive Control System Upgrade and Elimination of Axial Power Shaping Rods ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0813301852008-05-0101 May 2008 License Renewal Environmental Scoping Meeting Handouts and Slides ML0813301832008-05-0101 May 2008 License Renewal Environmental Scoping Meeting Written Comments ML0807906742008-03-19019 March 2008 Slides, NRC Annual Performance Assessment of Three Mile Island - 2007 Reactor Oversight Program. ML0806700982008-03-0404 March 2008 License Renewal Process Overview Three Mile Island Unit 1 Public Meeting Handout 03/04/2008 ML0735507162007-12-21021 December 2007 TMI Refueling Outage Performance Summary ML0726404902007-08-14014 August 2007 TMI Intro ML0726404922007-08-14014 August 2007 TMI Tritium Update 08/07 - Slide Presentation ML0713701672007-04-30030 April 2007 Enclosure 2 (Slides) - 04/30/2007 Summary of Meeting with Amergen Energy Co., LLC, Regarding License Amendment Request Relating to the Insertion of New Area High Thermal Performance Fuel in the TMI-1 Reactor ML0710901582007-04-19019 April 2007 Aam Final Slides for Reactor Oversight Program 2006-07 Public Meeting 04/11/07 2024-02-13
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24040A0722024-02-13013 February 2024 Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML22301A1402022-10-28028 October 2022 1993 TMI Event - Jure Kutlesa, Security Specialist ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20050H0232020-02-20020 February 2020 Presentation Slides for Meeting to Discuss Environmental Regulatory Approach to TMI-2 Decommissioning ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16070A1152016-03-11011 March 2016 Efforts to Improve Rulemaking Tracking and Reporting ML16006A2882016-01-0606 January 2016 Significant Operational Experience: 7 Major Industry Events with Regulatory Implications ML15327A0812015-11-0909 November 2015 Fall 2015 Outage Call Regarding the Steam Generator Tube Inservice Inspections - Slides ML14304A7832014-11-14014 November 2014 Public Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate ML14300A5452014-10-30030 October 2014 10/30/2014, Meeting Slide with NRC Regarding GL 2004-02 Close Out for Three Mile Island, Unit 1 ML13262A1492013-09-19019 September 2013 Enclosure 3- NRC Presentation Handout ML13262A1172013-08-28028 August 2013 Enclosure 4 - Scott Portzline Presentation ML12262A3352012-09-13013 September 2012 9.13.2012 TMI Alert Presentation Nreg 0654 Public Mtg ML12116A0482012-04-25025 April 2012 Aam ROP-12 Slides ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML12262A4762012-02-22022 February 2012 TMI Alert Portzline Presentation NUREG-0654 Public Mtg ML1202501052012-01-25025 January 2012 Licensee Slides for 1/26/12 Meeting Three Mile Island, Unit 1 - Summary of Tube to Tube Wear Identified During T1R19 (Fall 2011) ML11221A3262011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 18 Three Mile Island ML1115901302011-06-0808 June 2011 NRC Slides - TMI Public Meeting, June 7, 2011 ML13197A0522011-04-19019 April 2011 FOIA/PA-2011-0118, FOIA/PA-2011-0119, FOIA/PA-2011-0120 - Resp 111 - Partial, Group Letter Bt. Part 5 of 7 ML1007802632010-01-25025 January 2010 Presentation - Health Physics Society Mid-Year Meeting ML1007703672009-12-0707 December 2009 E-mail from J. White of USNRC to D. Screnci and J. Hawkins of USNRC, Regarding TMI NRC Slides.Ppt ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0910702242009-04-17017 April 2009 Riv Regional Administrator Presentation at Texas A&M University March 30, 2009, Three Mile Island - Impact on Safety Perspectives and Safety Belief ML0907508342009-03-16016 March 2009 Meeting Slides, Three Mile Island Annual Assessment Meeting 2008 Reactor Oversight Process ML11216A2452008-12-0202 December 2008 0523 - R504P - Westinghouse Advanced Technology - 07.4 - Core Damaging Events ML0828805412008-10-14014 October 2008 Herbaceous Wetlands ML0826712092008-09-23023 September 2008 TMI Pre-Application Meeting - Control Rod Drive Control System Upgrade and Elimination of Axial Power Shaping Rods ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0813301852008-05-0101 May 2008 License Renewal Environmental Scoping Meeting Handouts and Slides ML0813301832008-05-0101 May 2008 License Renewal Environmental Scoping Meeting Written Comments ML0807906742008-03-19019 March 2008 Slides, NRC Annual Performance Assessment of Three Mile Island - 2007 Reactor Oversight Program. ML0806700982008-03-0404 March 2008 License Renewal Process Overview Three Mile Island Unit 1 Public Meeting Handout 03/04/2008 ML0802501172008-01-15015 January 2008 1/15/2008 Slides from Drop-in Visit Exelon/Amergen ML0726404902007-08-14014 August 2007 TMI Intro ML0726404922007-08-14014 August 2007 TMI Tritium Update 08/07 - Slide Presentation ML0713701672007-04-30030 April 2007 Enclosure 2 (Slides) - 04/30/2007 Summary of Meeting with Amergen Energy Co., LLC, Regarding License Amendment Request Relating to the Insertion of New Area High Thermal Performance Fuel in the TMI-1 Reactor ML0710901582007-04-19019 April 2007 Aam Final Slides for Reactor Oversight Program 2006-07 Public Meeting 04/11/07 ML0726404942007-03-28028 March 2007 Unit 2 Accident - Presentation Slides ML0708513862007-03-26026 March 2007 Annual Assessment Slides for ROP 2006-07 Public Meeting on 4-11-07 ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0607508032006-03-22022 March 2006 NRC Slide Presentation for Public Meeting Ref: Three Mile Island, Unit 1 Annual Assessment Performance CY2005 2024-02-13
[Table view] |
Text
Three Mile Island Annual Assessment Meeting 2008 Reactor Oversight Process Nuclear Regulatory Commission - Region I
Purpose of Todays Meeting
- Discuss TMI performance for 2008
- Provide Exelon the opportunity to respond to the NRCs annual performance assessment and to identify new or existing programs to maintain or improve performance
- Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations 2
Agenda
- NRC Organization and Performance Goals
- Reactor Oversight Process (ROP)
- National Summary of Plant Performance
- TMI Plant Performance Assessment
- Exelon Response and Remarks
- NRC available to address public questions 3
Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Division of Nuclear Materials Safety Darrell J. Roberts, Director David C. Lew, Director John D. Kinneman, Director Eugene W. Cobey, Acting Deputy Director James W. Clifford, Deputy Director Daniel S. Collins, Deputy Director Ronald Bellamy Regional Specialists Regional Specialists Branch 6 Chief TMI Resident Inspection Staff Project Engineers David Kern, Senior Resident Inspector Scott Barber, Senior Project Engineer Javier Brand, Resident Inspector Christopher Newport, Project Engineer 4
NRC Strategic Plan Goals
- Safety: Ensure adequate protection of public health and safety and the environment
- Security: Ensure adequate protection in the secure use and management of radioactive materials 5
NRC Regulatory Functions What We Regulate
- Commercial power, research, test, and new reactor designs
- Reactor fuel, radioactive material for medical, industrial, and academic uses
- Transportation, storage, disposal, and facility decommissioning
- Facility physical security 6
Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety 7
Reactor Oversight Process S tra te g ic P e rfo r m a n c e A re a s S a fety C o rn e r s to n e s B a s e lin e In s p e c tio n P e r fo r m a n c e In d ic a to r R e s u lts R e s u lts S ig n ific a n c e S ig n ific a n c e T h r e s h o ld T h r e s h o ld A c tio n M a tr ix R e g u la to ry R e s p o n s e 8
Baseline Inspection Areas
- Maintenance Effectiveness
- Refueling & Outage Activities
Baseline Inspection Areas
- Performance Indicator Verification
- Identification & Resolution of Problems
NRC Performance Indicators
- Security PIs are not Publicly Available 11
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue 12
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone
- Increasing Safety Significance
- Increasing NRC Inspection Efforts
- Increasing NRC/Licensee Management Involvement
- Increasing Regulatory Actions 13
National Summary of Plant Performance (at end of 2008)
Licensee Response 86 Regulatory Response 14 Degraded Cornerstone 3 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104 14
National Summary of Plant Performance (at end of 2008)
Performance Indicator Results Green 1762 White 6 Yellow 0 Red 0 Total Inspection Findings Green 776 White 17 Yellow 0 Red 0 15
NRC Inspection Activities at TMI (for 2008)
- 5669 hours0.0656 days <br />1.575 hours <br />0.00937 weeks <br />0.00216 months <br /> of inspection and related activities
- 2 resident inspectors on-site
- 3 major team inspections:
Problem Identification & Resolution: 03/31 - 04/04 Triennial Fire Protection: 08/25 - 09/12 License Renewal: 11/17 - 12/12 16
TMI PIs / Findings (January 1 - December 31, 2008)
- All Green Performance Indicators
- 7 Green / Severity Level - IV inspection findings 17
NRC Inspection Findings TMI
- Incomplete or Untimely Corrective Actions
- design calculations for EDG fuel capacity
- staged equipment for loss of SW event
- emergency lighting & use of elevators when combating a fire
- Degraded Fire Barrier Seals Not Properly Inspected and Repaired
- Inservice Test Reference Conditions and Instrumentation Not Established 18
NRC Annual Assessment Summary TMI
- Exelon operated the plant safely and in a manner that preserved public health and safety and protected the environment
- TMI was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2008 19
NRC Annual Assessment Summary TMI
- NRC plans baseline inspections at TMI for the remainder of 2009 20
Licensee Response and Remarks Mr. William Noll Site Vice President - Three Mile Island Exelon Generation Company, LLC 21
Contacting the NRC
(800) 695-7403 Allegation@nrc.gov
- General information or questions:
www.nrc.gov Public Affairs Officers:
Diane Screnci 610-337-5330 Neil Sheehan 610-337-5331 22
NRC Representatives
- David C. Lew, Division Director, DRP 610-337-5229
- James W. Clifford, Deputy Division Director, DRP 610-337-5080
- Ronald Bellamy, Branch Chief 610-337-5200
- David Kern, Senior Resident Inspector 717-948-1165
- Scott Barber, Senior Project Engineer 610-337-5232 23
Reference Sources
- Reactor Oversight Process
- Public Document Room 1-800-397-4209 (Toll Free) 24
End of the Presentation Nuclear Regulatory Commission Region I King of Prussia, Pennsylvania April 2, 2009