MONTHYEARML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A2222024-07-0909 July 2024 LRA Changes - Selective Leaching Program (AMP XI.33) ML24192A2232024-07-0808 July 2024 License Renewal Clarification (AMP XI.33) ML24103A1262024-05-0808 May 2024 Email to Phil Lashley Decision on the Exemption Request for Perry ML24127A1992024-05-0606 May 2024 NRR E-mail Capture - (External_Sender) Perry License Renewal Scoping and Screening Breakout Question B.2.24 (Partial TRP-55) ML24103A1272024-05-0303 May 2024 Email to Phil Lashley Availability of Environmental Assessment for the Perry Exemption ML24120A3222024-04-26026 April 2024 Response from State of Oh Regarding Review of Environmental Assessment for Perry HI-STORM Exemption Request ML24120A3212024-04-25025 April 2024 Email to State of Oh Requesting Review of EA for Perry HI-STORM Exemption Request ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML24052A0092024-02-16016 February 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-264 ML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 ML21027A2032021-01-27027 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding Snubber Testing Extension ML21021A2602021-01-21021 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request Regarding Residual Heat Removal Shutdown Cooling Subsystems ML21011A2732021-01-11011 January 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Review the Emergency Plan ML20325A2782020-11-20020 November 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Part 73 Force-on-Force Exemption 2024-07-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24227A9562024-08-14014 August 2024 LRA - Requests for Additional Information - Set 1 ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24190A0802024-07-0808 July 2024 Second Round Request for Additional Information ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24064A2202024-03-14014 March 2024 PNPP Unit 1 LRA Environmental Review RCI and RAI-Enclosure 2 ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML22234A1482022-08-22022 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22182A4442022-07-0202 July 2022 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010 ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22130A5662022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML21168A0662021-06-17017 June 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010 ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 ML21020A0392021-01-20020 January 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000440/2021010 ML20325A2782020-11-20020 November 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Part 73 Force-on-Force Exemption ML20289A1012020-10-0505 October 2020 NRR E-mail Capture - Final 2nd Round RAI - Perry Request for Relief - Proposed Alternative Request IR-056, Rev. 3 ML20191A0192020-07-0101 July 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Extension to License Expiration Date by Recapturing Low-Power Testing Time ML20133K0632020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20127H8692020-05-0606 May 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request IR-054, Rev. 2 ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML19035A6552019-02-19019 February 2019 Request for Additional Information Related to the Deferral of Actions Related to Beyond-Design-Basis Flooding Hazard Reevaluations for Perry Nuclear Power Plant. ML18277A2372018-10-0202 October 2018 NRR E-mail Capture - RAI Related to Perry Request for Alternative PR-2 ML18271A2082018-09-27027 September 2018 NRR E-mail Capture - RAI Related to Request to Revise Perry'S Technical Specifications to Extend Containment Leak Rate Test Intervals ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18009A0112018-01-0808 January 2018 NRR E-mail Capture - Final RAI for Perry LAR Related to AST Implementation ML18008A0282017-12-13013 December 2017 NRR E-mail Capture - Draft RAI for Perry LAR to Revise TSs for AST ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17160A1102017-06-0707 June 2017 17 Perry Nuclear Power Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17143A3592017-05-22022 May 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000440/2017008 (Njfa) ML17115A4212017-04-25025 April 2017 NRR E-mail Capture - Withdrawal of Draft RAI Regarding Perry'S LAR Re TSTF-501, Revision 1 ML17114A1532017-04-0606 April 2017 NRR E-mail Capture - Draft RAI for Perry LAR Re TSTF-501, Revision 1 ML16364A2482016-12-28028 December 2016 Notification of NRC Baseline Inspection and Request for Information 05000440/2017001 ML16327A0182016-11-23023 November 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation and Drain Down of the Reactor Cavity Portion of the Upper Containment Pool (TAC MF7476) (L-16-083) ML16279A0432016-10-0606 October 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation During Modes 1, 2, & Drain Down of Upper Containment Pool During Mode 3 IR 05000440/20215012016-04-19019 April 2016 Perry Nuclear Power Plant - Request for Additional Information Regarding VIO 05000440/215010-01 ML16067A2812016-03-10010 March 2016 Request for Additional Information Related to Emergency Action Level Scheme Change License Amendment Request (CAC No. MF7046)(L-15-257) ML16064A2792016-03-0101 March 2016 NRR E-mail Capture - Perry EAL Scheme Change LAR (CAC No. MF7046) Draft Request for Additional Information IR 05000440/20150102016-02-0101 February 2016 Ltr. 02/01/16 Request for Additional Information VIO 05000440/2015010-01. (Jgc) ML15351A0312015-12-18018 December 2015 Request for Additional Information Related to Application for Transfer of Control of License and Conforming License Amendment (CAC No. MF6412)(L-15-195) ML15096A0512015-04-13013 April 2015 Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies 2024-08-14
[Table view] |
Text
NRR-PMDAPEm Resource From: Green, Kimberly Sent: Thursday, April 06, 2017 3:47 PM To: Lashley, Phil H. (phlashley@firstenergycorp.com)
Cc: Heintz, Calvin J. (cjheintz@firstenergycorp.com)
Subject:
Draft RAI for Perry LAR re TSTF-501, Revision 1 Attachments: Perry draft RAI Sent to FENOC.docx
Dear Mr. Lashley:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 27, 2016, FirstEnergy Nuclear Operating Company submitted a request to modify the Perry Nuclear Power Plant, Unit 1, technical specifications (TSs) to revise TS 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements in the TS and placing them in the TS Bases so that they may be modified under licensee control, and the TS would also be modified so that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator. The proposed changes are consistent with NRC-approved Revision 1 to Technical Specification Task Force (TSTF)
Improved Standard Technical Specifications (STS) Change Traveler TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. Attached, please find a draft request for additional information (RAI).
The draft RAI is being sent to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This email and the attachment do not convey or represent an NRC staff position regarding the FENOC's request.
Please let me know if you need a call to clarify the staffs request.
Sincerely, Kimberly Green, Sr. Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1627 kimberly.green@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 3463 Mail Envelope Properties (Kimberly.Green@nrc.gov20170406154700)
Subject:
Draft RAI for Perry LAR re TSTF-501, Revision 1 Sent Date: 4/6/2017 3:47:06 PM Received Date: 4/6/2017 3:47:00 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:
"Heintz, Calvin J. (cjheintz@firstenergycorp.com)" <cjheintz@firstenergycorp.com>
Tracking Status: None "Lashley, Phil H. (phlashley@firstenergycorp.com)" <phlashley@firstenergycorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1706 4/6/2017 3:47:00 PM Perry draft RAI Sent to FENOC.docx 35605 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-440 By letter dated October 27, 2016, FirstEnergy Nuclear Operating Company (FENOC, or licensee), submitted a license amendment request (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16302A055). The proposed amendment would revise the Perry Nuclear Power Plant, Unit 1, Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by removing the current stored diesel fuel oil and lube oil numerical volume requirements in the TS and placing them in the TS Bases so that they may be modified under licensee control. The TS would also be modified so that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator. The additional information below is needed to support the NRC staffs continued technical review of the license amendment request (LAR).
RAI 1: General Design Criterion (GDC) 17, Electric Power Systems, of Appendix A, General Design Criteria for Nuclear Power Plants, to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities, requires that an onsite electric power system and an offsite electric power system be provided to permit functioning of structures, systems, and components important to safety. In addition, GDC 17 contains requirements concerning system capacity, capability, independence, redundancy, availability, testability, and reliability. Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50 establishes overall quality assurance requirements for the design, construction, and operation of structures, systems, and components important to safety.
Regulatory Guide 1.137, Regulatory Position 1 states that ANSI N195-1976 provides a method acceptable to the NRC staff for complying with the pertinent requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50. Regulatory Position 1.c states that the fuel oil storage requirements should either be based on the assumption that the diesel generator operates continuously for 7 days at its rated capacity or calculations based on the time-dependent loads of the diesel generator. Consistent with RG 1.137, Revision 1, Perry Nuclear Power Plant is designed with stored diesel fuel oil inventory requirement that a 7-day supply be available for each diesel generator.
State which calculation method in ANSI N195-1976 has been used to calculate the 7-day fuel oil volume, the time dependent method or the conservative alternative method. If the time dependent method was used, please confirm that the calculation includes a minimum margin of 10 percent.
RAI 2: Regulatory Guide 1.137, Regulatory Position 1 states that ANSI N195-1976 provides a method acceptable to the NRC staff for complying with the pertinent requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50. Regulatory Position 1.c states that the
fuel oil storage requirements should either be based on the assumption that the diesel generator operates continuously for 7 days or based on the time-dependent loads of the diesel generator.
TSTF-501 was issued to address how the requirements on diesel fuel oil may continue to change in the future and the addition of additives to compensate for the issues associated with ultra low sulfur diesel (ULSD) discussed in Information Notice 2006-22 may further affect the volumetric energy content and the stored diesel fuel oil volume requirements. As described in NRC Information Notice 2006-22, the incorporation of ULSD fuel oil instead of low sulfur diesel fuel oil is expected to reduce the available energy content by 1.2 percent or more. These changes could result in insufficient stored fuel oil volume in order to ensure that the volume provides for at least 7 days of diesel generator operation.
Are the fuel oil quantity values currently in the Technical Specifications (TSs) and the diesel generator manufacturer's fuel consumption values based on ULSD fuel? If not, specify the type of fuel used to calculate the fuel oil values. Provide discussion on how use of ULSD fuel has been accounted for in the design for compliance with the 7-day TS requirement.
RAI 3: Regulatory Guide 1.137, Revision 1, endorses ASTM D975-77 for assuring the quality of the oil stored in the fuel-oil supply tank. Regulatory Position 2.b states, in part, that Prior to adding new fuel oil to the supply tanks, onsite samples of the fuel oil should be taken. The latest version of ASTM D975, Standard Specification for Diesel Fuel Oils, allows manufacturers to add up to five percent biodiesel in the fuel oil without labeling. Discuss whether or not the fuel oil consumption rate used in your fuel oil storage calculation takes into account up to five percent biodiesel allowed by ASTM D975. If fuel oil is received without biodiesel at Perry, explain how that is achieved.
RAI 4: 10 CFR 50.36(b) states that, Each license authorizing operation of a production or utilization facility of a type described in § 50.21 or § 50.22 will include technical specifications.
The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to § 50.34. The Commission may include such additional technical specifications as the Commission finds appropriate.
As indicated in a letter to the TSTF dated April 3, 2014 (Agencywide Documents Access and Management System Accession No. ML14084A512), the NRC staff has determined that the licensee must identify the NRC-approved calculation methodology in the final safety analysis report. FENOC did not provide any regulatory commitments in the license amendment request.
Provide a commitment consistent with the one described in the referenced letter, or explain why a commitment is not needed.