MONTHYEARML0516101832005-06-20020 June 2005 Davis-Besse - Firstenergy Nuclear Operating Company Request for Withholding Information from Public Disclosure for Davis-Besse Nuclear Power Station, Unit No. 1 Project stage: Withholding Request Acceptance ML0611502652006-04-20020 April 2006 Withdrawal of License Amendment Application to Adopt Alternate Repair Criteria for Axial Tube End Crack Indications in Steam Generator Tubes (License Amendment Request No. 04-0025) Project stage: Withdrawal ML0611103582006-05-25025 May 2006 DB Withdrawal of an Amendment Request for OTSG Tube Inspections TAC No. MC7049 Project stage: Withdrawal ML0610101122006-05-25025 May 2006 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Select Rods in Lead Test Assemblies (Ltas) with Axiomtm Clad Material & Supporting Justificati Project stage: Approval ML0609702932006-05-25025 May 2006 Environmental Assessment and Finding of No Significant Impact of Th Exemption from Cladding Material Specified in 10 CFR 50.44, 10 CFR 50.46 and 10 CFR 50 Appendix K Project stage: Approval ML0613805182006-06-30030 June 2006 Exemption from the Requirements of 10 CFR Part 50, Section 50.44, Section 50.46, and Appendix K to Part 50 Project stage: Approval RS-08-040, Request for Exemption to Support Use of Axiom Cladding Material2008-03-24024 March 2008 Request for Exemption to Support Use of Axiom Cladding Material Project stage: Request 2006-05-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
May 25, 2006 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST TO ADOPT ALTERNATE REPAIR CRITERIA FOR AXIAL TUBE END CRACKING INDICATIONS IN STEAM GENERATOR TUBES (TAC NO. MC7049)
Dear Mr. Bezilla:
By letter to the Nuclear Regulatory Commission (NRC) dated May 22, 2005, you applied for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit 1, Facility Operating License No. NPF-3. The proposed change would have modified the facility technical specifications (TS) pertaining to a qualified alternate repair criteria for axial tube end cracking indications in the DBNPS once through steam generator tubes. Specifically, the proposed amendment would revise the TS surveillance requirements for the steam generator inservice inspection to include tube end cracking alternate repair criteria.
By letter to the NRC dated February 16, 2006, in response to Generic Letter 2006-01, ?Steam Generator Tube Integrity and Associated Technical Specifications, you committed to submit a license amendment application by May 31, 2006, proposing to amend the DBNPS TS to be consistent with TS Task Force (TSTF)-449, ?Steam Generator Tube Integrity, Revision 4.
Since this new license application will be incompatible with the changes proposed in the earlier license amendment application, by letter dated April 20, 2006, you withdrew the May 22, 2005, amendment request and indicated your plans to resubmit the license amendment application at a later date.
M. Bezilla The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Stephen J. Campbell, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Notice of Withdrawal cc w/encl: See next page
M. Bezilla The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Stephen J. Campbell, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Notice of Withdrawal cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-2 r/f RidsNrrDorlLpl3-2 RidsNrrLADClarke SCampbell RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn3MailCenter RidsNrrDorlDpr ADAMS Accession Number: ML061110358 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME SCampbell:ca DClarke DCollins DATE 5/25/2006 5/25/2006 5/25/2006 OFFICIAL RECORD COPY
Davis-Besse Nuclear Power Station, Unit 1 cc:
Manager - Regulatory Affairs State of Ohio FirstEnergy Nuclear Operating Company Public Utilities Commission Davis-Besse Nuclear Power Station 180 East Broad Street 5501 North State - Route 2 Columbus, OH 43266-0573 Oak Harbor, OH 43449-9760 Attorney General Director, Ohio Department of Commerce Office of Attorney General Division of Industrial Compliance 30 East Broad Street Bureau of Operations & Maintenance Columbus, OH 43216 6606 Tussing Road P.O. Box 4009 President, Board of County Reynoldsburg, OH 43068-9009 Commissioners of Ottawa County Port Clinton, OH 43252 Regional Administrator U.S. Nuclear Regulatory Commission President, Board of County 801 Warrenville Road Commissioners of Lucas County Lisle, IL 60523-4351 One Government Center, Suite 800 Toledo, OH 43604-6506 Resident Inspector U.S. Nuclear Regulatory Commission The Honorable Dennis J. Kucinich 5503 North State Route 2 United States House of Representatives Oak Harbor, OH 43449-9760 Washington, D.C. 20515 Barry Allen, Plant Manager The Honorable Dennis J. Kucinich FirstEnergy Nuclear Operating Company United States House of Representatives Davis-Besse Nuclear Power Station 14400 Detroit Avenue 5501 North State - Route 2 Lakewood, OH 44107 Oak Harbor, OH 43449-9760 Gary R. Leidich Dennis Clum President and Chief Nuclear Officer Radiological Assistance Section Supervisor FirstEnergy Nuclear Operating Company Bureau of Radiation Protection Mail Stop A-GO-19 Ohio Department of Health 76 South Main Street P.O. Box 118 Akron, OH 44308 Columbus, OH 43266-0118 Joseph J. Hagan Carol OClaire, Chief, Radiological Branch Senior Vice President of Operations and Ohio Emergency Management Agency Chief Operating Officer 2855 West Dublin Granville Road FirstEnergy Nuclear Operating Company Columbus, OH 43235-2206 Mail Stop A-GO-14 76 South Main Street Zack A. Clayton Akron, OH 44308 DERR Ohio Environmental Protection Agency David W. Jenkins, Attorney P.O. Box 1049 FirstEnergy Corporation Columbus, OH 43266-0149 Mail Stop A-GO-18 76 South Main Street Akron, OH 44308
Davis-Besse Nuclear Power Station, Unit 1 cc:
Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY NUCLEAR GENERATION CORP.
DOCKET NO. 50-346 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation Corp. (FENOC) to withdraw its May 22, 2005, application for proposed amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station (DBNPS), Unit 1, located in Ottawa County.
The proposed amendment would have revised the technical specifications pertaining to a qualified alternate repair criteria for axial tube end cracking indications in the DBNPS once through steam generator tubes. Specifically, the proposed amendment would revise the TS surveillance requirements for the steam generator inservice inspection to include tube end cracking alternate repair criteria.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on July 5, 2005 (70 FR 38720). However, by letter dated February 16, 2006, in response to Generic Letter 2006-01, ?Steam Generator Tube Integrity and Associated Technical Specifications, FENOC committed to submit a license amendment application by May 31, 2006, proposing to amend the DBNPS TS to be consistent with TS Task Force (TSTF)-449, ?Steam Generator Tube Integrity, Revision 4. Since this new license application will be incompatible with the changes proposed in the earlier license
amendment application, by letter dated April 20, 2006, FENOC withdrew the May 22, 2005, amendment request. FENOC plans to resubmit the license amendment application at a later date.
For further details with respect to this action, see the application for amendment dated May 22, 2005, and the licensees letter dated April 20, 2006, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this day of May 2006.
FOR THE NUCLEAR REGULATORY COMMISSION Stephen J. Campbell, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation