MONTHYEARML22314A0132022-11-0404 November 2022 EN 56209 - Part 21 Report Re Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures ML20024E2552020-01-0909 January 2020 Engine Systems, Inc., Submittal of Selenium Surge Suppressor, Emo P/N 8403049 ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19091A0502019-03-21021 March 2019 Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System ML19042A0802019-01-25025 January 2019 Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14197A2812014-07-15015 July 2014 Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane Bolts ML14197A2742014-07-14014 July 2014 Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13142A3292013-05-0606 May 2013 Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 ML13127A0142013-05-0303 May 2013 Part 21 Report - Fuel Injectors Failed Pressure Test ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13099A2382013-03-27027 March 2013 Notification of Potential Part 21 Report Re Series 24 Csr Relays with Oversized Cam Drive Components ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12039A2412012-02-0707 February 2012 Notification of Part 21 Report - Defective Plug Insulators ML1005129052010-02-0505 February 2010 Part 21 Notification - Circuit Breaker Charging Motor Crank Does Not Meet Hardness Specifications ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0830301412008-10-21021 October 2008 Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0731105192007-11-0505 November 2007 Interim Report for a Failure to Comply Under the Provisions of 1OCFR21 ML0730304642007-10-25025 October 2007 Enertech Notification of Potential Part 21 Reportable Condition for Enertech Cartridge Solenoid Valve ML0727503422007-09-26026 September 2007 Notification of Potential Transnuclear Part 21 Re Dry Cask Canister Documentation Lost ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0403002542004-01-28028 January 2004 10CFR Part 21 Notification Regarding Wide Range Ion Chamber (Update) ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2022-11-04
[Table view] |
Text
A TRANSNUCLEAR AN AREVA COMPANY E-25784 November 5, 2007 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Interim Report for a Failure to Comply under the Provisions of 10CFR21
References:
- 1. Transnuclear Letter E-25576 to U. S. Nuclear Regulatory Commission, Evaluation of a Deviation for Notification under the Provisions of IOCFR21, dated 9/19/07.
- 2. Transnuclear Letter E-25623 to U. S. Nuclear Regulatory Commission, Notification of a Failure to Comply under the Provisions of I0CFR2 1, dated 9/26/07.
To Whom It May Concern:
The purpose of this letter is to provide the staff with the prescribed sixty (60) day it *mreport as required per 10CFR21.21 (a)(2) of a condition identified by Transnuclear, Inc. (TN) as a failu to comply with the license conditions for Certificate of Compliance for Spent Fuel Storage Casks, No. 0 including Appendix A, NUHOMS HD System Generic Technical Specifications. Specifically, TN identifie and documented in Supplier Finding Report 2007-111 that our fabricator, GE-Hitachi Nuclear Energy Am cas (GHNEA), had provided inadequate fabrication records resulting in a nonconforming condition relative o the possibility of undocumented Temporary Weld Attachments (TWAs) to the confinement boundary of a lo ded NUHOMS 32PTH Dry Shielded Canister (DSC) at Surry Power Station (DSC S/N DOM-32PTH-001-C<.
This condition reported as a failure to comply in Reference 2 involves a lack of documentation for use of qualified welders, approved welding procedures, approved weld filler material and compatible TWA base material, as well as a lack of the required liquid penetrant surface examination report subsequent to TWA removal. Such documentation is required per Article NB-4435 of the ASME B&PV Code Section 1II, which is a design feature embedded in the Technical Specifications for the NUHOMS RD license. Therefore, the nonconforming TWAs constitute a Code violation such that the subject loaded canister is not compliant with the NUHOMS HD Technical Specifications.
This interim report is necessary such that TN can complete our evaluation including planned corrective actions identified in Reference 2. TN has completed our extent of condition review for prior canisters fabricated by GHNEA and has determined the reportable condition is limited to the unit loaded at Surry Power Station. Inspections involving PT and UT thickness examinations are continuing for five (5) unloaded canisters subject to the same condition located at both GHNEA and Dominion sites. Completion of these examinations is required to support the technical justification for a request for exception to the ASME Code requirements for the subject loaded canister.
Pending our request for exception to the applicable Code requirements, including NRC response to such request, we expect to submit our final evaluation within 120 days of initial discovery, established as 9/7/07 in Reference 1.
Any questions you may have regarding this matter should be directed to Steven C. White, Director Corporate Quality Assurance at 410-910-6870.
Very truly yours, Tara Neider President - Transnuclear Inc.
c: J. Sebrosky (NRC) J. Bondre J. Boshoven P.Quinlan R. Grubb S. Petras S. White j z',]
7135 Minstrel Way, Suite 300 Columbia, Maryland 21045 Phone: 410-910-6900 Fax: 410-910-6902