Similar Documents at Surry |
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML22314A0132022-11-0404 November 2022 EN 56209 - Part 21 Report Re Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures ML20024E2552020-01-0909 January 2020 Engine Systems, Inc., Submittal of Selenium Surge Suppressor, Emo P/N 8403049 ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19091A0502019-03-21021 March 2019 Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System ML19042A0802019-01-25025 January 2019 Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14197A2812014-07-15015 July 2014 Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane Bolts ML14197A2742014-07-14014 July 2014 Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13142A3292013-05-0606 May 2013 Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 ML13127A0142013-05-0303 May 2013 Part 21 Report - Fuel Injectors Failed Pressure Test ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13099A2382013-03-27027 March 2013 Notification of Potential Part 21 Report Re Series 24 Csr Relays with Oversized Cam Drive Components ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12039A2412012-02-0707 February 2012 Notification of Part 21 Report - Defective Plug Insulators ML1005129052010-02-0505 February 2010 Part 21 Notification - Circuit Breaker Charging Motor Crank Does Not Meet Hardness Specifications ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0830301412008-10-21021 October 2008 Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0731105192007-11-0505 November 2007 Interim Report for a Failure to Comply Under the Provisions of 1OCFR21 ML0730304642007-10-25025 October 2007 Enertech Notification of Potential Part 21 Reportable Condition for Enertech Cartridge Solenoid Valve ML0727503422007-09-26026 September 2007 Notification of Potential Transnuclear Part 21 Re Dry Cask Canister Documentation Lost ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0403002542004-01-28028 January 2004 10CFR Part 21 Notification Regarding Wide Range Ion Chamber (Update) ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2022-11-04
[Table view] |
Text
.1 02/07/2012 U.S. Nuclear Regulatory Commission Operations Center Event Report Pace I Part 21 (PAR) Event# 47643 Rep Org: CURTISS WRIGHT FLOW CONTROL CO. Notification Date / Time: 02/06/2012 17:56 (EST)
Supplier: CURTISS WRIGHT FLOW CONTROL CO. Event Date / Time: 02/06/2012 (CST)
Last Modification: 02/06/2012 Region: 1 Docket #:
City: HUNTSVILLE Agreement State: Yes County: License #:
State: AL NRC Notified by: TONY GILL Notifications: JONATHAN BARTLEY R2DO HQ Ops Officer: CHARLES TEAL PART 21 GROUP EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH PART 21 - DEFECTIVE PLUG INSULATORS The following report was received via fax:
"This letter is issued to provide initial notification of a potential defect in Plug Insulators (P/N: GB-1A-1) supplied as part of GRAYBOOT 'A' (GB-1A) Connector Kits. There are two affected lots of Plug Insulators (Lot #: BA59961 and BA6771 1). The potential defect is an out of tolerance dimension that will possibly affect the sealing ability of the Plug Insulator to wire interface.
"The affected Customers and their associated Purchase Orders are listed below. All Customers will be notified today.
Ralph a. Hiller; PO: NUC7505, Item 1, 15 Kits (P/N: GB-1A [16-18], Lot BA59961) supplied 19JAN2012.
Bruce Power, PO: 00168187, Item 1, 20 Kits (P/N: GB-1A [12-14], Lot BA59961) supplied 13DEC2011.
Dominion - Surry, PO: 45886290, Item 1, 22 Kits (P/N: GB-S-1A, Lot BA59961) supplied 19DEC2011.
Dominion - Surry, PO: 45897749, Item 2, 30 Kits (P/N: GB-S-1A, Lot BA67711) supplied 01 FEB2012.
Ringhals AB, PO: 621728-053, Item 10, 30 Kits (P/N: GB-1A [16-18], Lot BA59961) supplied 19DEC2011.
Ringhals, PO: 620625-066, Item 10, 300 parts (P/N: GB-1A-1, Lots BA59961/BA67711) supplied 30JAN2012.
Ringhals, PO: 620996-066, Item 50, 1 Kit (P/N: GB-1A [16-18], Lot BA59961) supplied 29NOV2011.
OKG, PO: 4113847, Item 4, 86 parts (P/N: GB-1A-1, Lot BA59961) supplied 30NOV2011.
"It is requested that all affected parts be returned for replacement to QualTech NP; 330 West Park Loop; Huntsville, AL 35806. Customers can contact Cindy Tidwell at (256) 895-7250 ext. 229 for freight collect shipping instructions.
02/07/2012 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Paze2 Part 21 (PAR) Event# 47643 "Additional details, corrective actions and root causes will be provided once complete. If you require additional information or would like to discuss this further please do not hesitate in contacting:"
Tony Gill Quality Assurance Supervisor QualTech NP, Huntsville A business unit of Curtiss-Wright Flow Control Company Office 256-722-8500 ext. 1 Cell 256-426-4558 tgill@curtisswright.com
02/06/2012 17:56 2567229670 EGS PAGE 01/02 I QualToch NP 125 West Perk Loop CUR T155 Huntsville, AL 35606 Phone: 256.722.8500 - Fax: 256.722.8533 www. qualtechnp.com 4w controlCompany QualTech NP FAX TRANSMITTAL DATE: w-NS; KY TO:
FAX NO.
FROM: Iýý ý\ ~ytY~A st~
COMMENTS/INSTRUCTIONS:
ZX'ýZt- xý &ý Q*?r\c5%5' v%QJ$~9 k&tK TRANSMITTAL INCLUDES COVER SHEET PLUS .A..S)PAGE(S).
02/06/2012 17:56 2567229670 EGS PAGE 02/02 Huntsville Operations ST pr m
125 & 330 West Park Loop Huntsville, AL 35806 QualTech NP 256-722-8500 (File No.: QTHuntsvillelOCFR21-2012-01)
February 06, 2012 To whom it may concern:
This letter is issued to provide initial notification of a potential defect in Plug Insulators (P/N: GB-lA-I) supplied as part of GRAYBOOT "A" (GB-IA) Connector Kits. There are two affected lots of Plug Insulators (Lot #: BA59961 and BA67711)- The potential defect is an out of tolerance dimension that will possibly affect the scaling ability of the Plug Insulator to wire interface.
The affected Customers and their associated Purchase Orders are listed below. All Customers will be notified today.
Ralph a. Hiller; PO: NUC7505, Item.., 15 Kits (P/N: GB-1A [16-18], Lot BA59961) supplied 19JAN2012.
Bruce Power, PO: 00168187, Item 1, 20 Kits (P/N: GB-lA [12-14], Lot BA59961) supplied 13DEC2011.
Dominion - Surry, PO: 45886290, Item 1, 22 Kits (P/N: GB-S-1A. Lot BA59961) supplied 19DEC20i 1.
Dominion - Sutry, PO: 45897749, Item 2, 30 Kits (P/N: GB-S-lA, Lot BA6771 1) supplied O1FEB2012.
Ringhals AB, PO: 621728-053, Item 10, 30 Kits (P/N: GB-lA t.16-18], Lot BA59961) supplied 19DEC201 1.
Ringhals, PO: 620625-066, Item 10, 300 parts (P/N: GB-lA-1, Lots BA59961/BA67711) supplied 30JAN2012.
Ringhals, PO: 620996-066. Item 50, 1 Kit (P/N: GB-lA [16-18], Lot BA59961) supplied 29NOV201 1.
OKG, PO: 4113847, Item 4, 86 parts (P/N: GB-lA-1, Lot BA59961) supplied 30NOV201 1.
It is requested that all affected. parts be returned for replacement to QualTech NP; 330 West Park Loop; Huntsville, AL 35806. Customers can contact Cindy Tidwell at (256) 895-7250 ext. 229 for freight collect shipping instructions.
Additional details, corrective actions and root causes will be provided once complete. If you require additional information or would like to discuss this further please do not hesitate in contacting me.
Sincerely, Tony6ý Quality Assurance Supervisor QualTecb NP, Huntsville a business unit of Curtiss-Wright Flow Control Company Office 256-722-8500 ext. 13 1 Cell 256-426-4.558 tgill@curtisswright.com