MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1462021-02-0505 February 2021 Fer 2020 Ile ES-301-7 Operating Test Review Worksheet-Final ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 2023-08-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1642021-02-0505 February 2021 Ile Outline Review Comments 2023-08-16
[Table view] |
Text
FACILITY POST-EXAMINATION COMMENTS FOR THE FERMI INITIAL EXAM -JANUARY 2008
DTE Energy February 7,2008 NRC-08-0019 Mr. Michael E. Bielby Region 111 U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle. Illinois 60532-4352
Dear Mr. Bielby:
Please find enclosed the following post-examination materials for the Fermi 2 Initial License Examination administered January 28 through February 1,2008.
Graded written examinations including each applicants original answer and examination cover sheets.
Master SRO and RO written examinations and answer keys with a document annotating any changes made while administering and grading the examination.
A summary of the basis for two proposed changes to be made to the original written examination answer keys.
A summary of any questions asked by, and answers given to, the applicants during the written examination.
0 A summary of substantive comments made by the applicants after the written examination with an explanation why the comment was accepted or rejected.
0 The written examination seating chart.
0 A completed Form ES-403-1 Written Examination Grading Quality Assurance Checklist for the SRO and RO written examination.
0 A summary of the examination analysis results for the SRO and RO written examination.
0 A summary of general candidate comments concerning the
. examination administration process submitted for NRC consideration.
Copies of Form ES-201-3 Examination Security Agreement, as completed to date with final closeout signatures.
These materials are being submitted in accordance with the requirements of NUREG 1021, Revision 9.
FER 1 2 1008
NRC-08-0019 Region I11 February 7, 2008 Page 2 If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Timothy Horan at (734) 586-4961.
Sincerely, Enclosures
Proposed Changes to Original Exam Answer Key J
Comment Q49: Answer D was listed in the key as being the correct answer. C is also correct based on the fact that Fermi 2 has a Mark 1 Containment. The Mark 1 Containment is susceptible to the phenomenon know as CHUGGING.
See Appendix B, Rev 2 of the EPGs, Page 8-7-35, for additional information regarding the following:
Following a DBA LOCA, Drywell Pressure (DW/P) would rapidly increase and force steam and non-condensable gasses from the Drywell into the Torus.
Torus Pressure would rapidly rise and exceed the Suppression Spray Initiation Pressure (SCIP), which is 9 psig for Fermi 2. Once the Torus Pressure exceeds 9 psig, the EPGs assume that a large fraction (95%) of the non-condensable gasses (nitrogen inerting the drywell) in the Drywell have been transferred to the Torus. Once this occurs, chugging becomes a primary concern.
Chugging is defined as: the repeated collapsing, and reformation, of steam bubbles at the Downcomer Vent opening. When the steam bubbles collapse at the exit of the Downcomers. the rush of water drawn into the Downcomer, to fill the void, induces severe stresses at the junction of the Downcomers and Vent Header in the Mark 1 Containments. Repeated application of such stresses could cause fatigue failure of these joints, thereby creating a direct path between the Drywell and Suppression Chamber. Steam discharged through the Downcomers could then bypass the Suppression Pool and directly pressurize the Primary Containment.
Initiating Drywell Sprays when Torus Pressure exceeds 9 psig, will cause the non-condensable gasses to be drawn back into the Drywell atmosphere, thereby preventing chugging.
With Drywell Sprays not available, (as stated in distractor C) chugging could not be prevented and containment integrity could be threatened, as described in the EPGs.
Therefore we recommend both answers be accepted.
Comment (263: Answer D was listed in the key as being the correct answer. C is also correct The term reason led the examinees to not look for the basis of the Main Steam Tunnel High Temperature Auto Isolation. The stem should have stated the auto isolation and the basis per 10CFRl00. This allowed Answer C to also be correct. Answer C is a reason to isolate MSIVs. This question originally had basis, instead of reason, in the stem. It was changed upon NRC request.
The Secondary Containment and Radioactive Release EOP purposelbasis is to protect equipment important to safety, in the Secondary Containment, to protect the integrity of the Secondary Containment, and to limit radioactivity release to and from the Secondary Containment. See attached information from SCClRR EOP Student Text.
Therefore we recommend both answers be accepted.