Similar Documents at Fermi |
---|
Category:License-Operator
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
NRC COMMENTS TO THE PROPOSED OPERATING TEST FOR THE FERMI INITIAL EXAM - JANUARY 2008
Operating Test Comments rdmin JPMs (ES-301-1):
Comment Resolution
(-1)
ADMlN 1. EC I HPCl Surveillance Procedure / ro,sro (Generic 2.2.12):
- 1) KA changed to 2.2.14 which matches the JPM as
- 1) JPM does not match referenced KA ('2.2.12 written.
Knowledge of Surveillance procedures") because it only requires knowledge of location of HPCl System control room indications.
(-1)
ADMlN 2. CO1 /Core Thermal Limit Verification /
ro,sro (Generic 2.1.7):
- 1) JPM Steps 4 and 5 are not critical. If applicant does 1) Steps 4 and 5 are not critical not place a "check" in the box, or identify the correct date and time it is only an errata type problem. There is no safety significance associated with the mistake.
- 2) Only one critical step for RO. Need at least one more 2) Identified the following steps as critical for the RO:
RO critical item (ie. JPM Steps 1, 2, or 3?) or replace -identify MAPRAT greater than 1 and inform JPM. CRS;
-applicant does not initial acceptance criteria (ie. indicates understanding that surveillance is not SAT).
ADMlN 3. RC / Dose Limit / ro (Generic 2.3.4):
- 1) Wording of KA Generic 2.3.4 is from NUREG 1123, 1) Verified and corrected KA wording Revision 2. NUREG 1123, Revision 2. Supplement Final, has slightly different wording for the KA.
- 2) The following JPM Steps are not critical: Step 3 2) Steps 3,4,6, 7, and 8 are not critical.
(applicant doesn't have to use procedure, and is being given copy of form); Step 4 (applicant's name and SSN);
Step 6, examiner will cue the applicant with correct answer; Steps 7 and 8 are not critical (signatures are errata). There is no safety significance associated with anv of these stem.
ADMlN 4. C02 / Complete NPTD Form / r o (Generic 2.4.39):
- 1) On Form ES-301.1, this JPM is listed as Conduct of 1) Moved this JPM to the Emergency Procedures / Plan Operations, but it should be under Emergency Plan section of ES-301-1.
because KA Generics for Section 2.4 is Emergency Procedures / Plan; Generics Section 2.1. Move this JPM to Emergency Plan on RO Form ES-301-1.
- 2) JPM Step 6 is not critical (ED signature is errata, not 2) JPM steps 1 and 6 are not critical safety signifcant)
- 3) JPM Step 3, will the meteorological data be the same for all applicants (ie. is it actual data that may change 3) Meteorological data comes from the simulator depending on current conditions?). computer, so it will be same for all applicants.
- 4) 5) JPM Steps 7-9, why are these at discretion of the examiner? Title says '...complete and communicate..." 4) JPM steps 7-9 are part of the JPM and identified as Make steps part of JPM. critical.
- 5) Is this JPM time critical? Task Standard mentions 30 minutes. 5) No, procedure is not critical, procedure says "should."
- 6) Provide an answer KEY with the examiner's JPM.
- 6) Key will be provided to examiner.
Page 1 of 3
Operating Test Comments
(-1)
ADMlN 6. RC / Dose Limit and Extension I sro (Generic 2.3.4):
- 1) KA Generic 2.3.4 wording on SRO Form ES-301-1 1) KA wording corrected.
does not match KA wording on ADMIN 6 JPM. Make KA wording for the RO and SRO Forms ES-301-1, ADMlN 3, and ADMlN 6 consistent with NUREG 1123, Revision 2, Supplement Final, Generic 2.3.4.
- 2) Don't give area dose rate in the Initial Cue because it 2) Will remove dose cue from Initiating Cue is a critical step, should be determined from the survey.
Also, Smith's accumulated dose is given in the Initial Cue, so it does not have to be given again by the examiner.
- 3) "Obtain Procedure MRP 12 and form MRP12001 is 3) Intent was for applicant to identify and locate considered a critical step, so it cannot be provided until necessary procedures /forms. Will clarify in JPM the applicant determines which procedure is needed and locates a copy.
- 4) The following JPM Steps are not critical: Step 3 4) JPM steps 4, and 7-10 are not critical.
(applicant doesn't have to use procedure, and is being given copy of form); Step 4 (applicant's name and SSN);
Steps 7 - 10 are not critical (signatures are errata, and are identified on the form, there is no safety significance associated with anv of these stem).
ADMlN 7. EP / PARS and Classification / sro (Generic 2.4.40):
- 1) JPM is time critical. 1) JPM is time critical.
- 2) Have "restricted procedure" available for exam, need 2) Will have restricted procedure available for exam to control.
- 3) Redact JPM from ADAMS? 3) NRC redact JPM from ADAMS.
ystem JPMs (ES-301-2):
Comment Resolution JPM b. Refuel Floor High Rad (P,D,A,L,S):
- 1) Since multiple procedural steps are referenced in this 1) This technique is currently being incorporated into the JPM, denote the applicable procedure number with each licensee's program.
of the JPM steps.
JPM c. Manuallyhlnltiate SRV LLS (D,S):
- 1) Remove the 4 bullet of the Initial Conditions and 1) Moved bullet to Initiating Cue.
incorporate into the Initiating Cue.
(-1)
JPM f. Multiple Rod Drifts (D,A,S):
- 1) JPM Step 7 is not critical because placing the RMS 1) Additional critical step is to recognize multiple rod will not cause a plant scram. As a result, the JPM only drifts; and depressing RPS Manual Scram PES.
has one critical step.
JPM i. Restore SDC (N,EN,A,S):
- 1) SRO-U Form ES-301-2 and JPM list multiple KAs, 1) Only referenced one KA on ES-301-2 and JPM.
select onlv A4.05 (3 'A4s" are listed).
JPM 1. Defeat ARI Logic Trips (D,R,E):
- 1) Add KAs 295037 to Form ES-301-1, and 216000 to 1) KAs 295037 added to Form ES-301-1, and 216000 to JPM. JPM.
Page 2 of 3
Operating Test Comments JPM I. Shift IAS Dryers (D,R,E):
- 1) Move the last 4 bullets of the Initiating Cue to the 1) Last 4 bullets of the Initiating Cue moved to Initial Initial Conditions. Conditions.
cenarios:
Comment Resolution SCENARIO 1:
(-1)
Event 7
-is SBFW required for RWL restoration? If not, what is -Delete credit for SBFW ' C the significance if it is not started? If no significance, can't use as an event.
SCENARIO 2:
Event 3
-include East Condenser Alr Leak, label it as "M (All)" -Incornorated comment on D-I sheet.
SCENARIO 3:
SCENARIO 4 (spare):
(-1)
Event 2
-not an instrument failure "I6ROY for SRO. but is a TS. -Deleted loss of RWL indication as an "1(1 failure Page 3 of 3